Time and Attendence Required

Facility No Nomenclature Brand Type Capacity Total Boiler Capacity Montly Quarterly Semi-Annual Annually

2218 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 276 NA X X X X NA

2218 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 276 NA X X X X NA

2218 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 100 NA X X X X NA

6104 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 850 NA X X X X NA

6104 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 850 NA X X X X NA

6104 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Burnham Hydronic 850 NA X X X X NA

6346 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 850 NA X X X X NA

6346 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 850 NA X X X X NA

7137 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 285 NA X X X X NA

7137 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 285 NA X X X X NA

7309 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 850 NA X X X X NA

7309 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Neo Them Hydronic 850 NA X X X X NA

8559 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Laars Hydronic 850 NA X X X X NA

8559 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Laars Hydronic 850 NA X X X X NA

9361 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Hydronic 400 NA X X X X NA

9361 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Hydronic 400 NA X X X X NA

10555 D3025 130 2950 BOILER, HOT WATER, O/G/C, 120 TO 500 MBH, ANNUALIZED Hydronic 202 NA X X X X NA

10571 D3025 130 3950 BOILER, HOT WATER, O/G/C, 500 TO 1000 MBH, ANNUALIZED Laars Hydronic 4174 NA X X X X NA

10571 D3025 130 3950 BOILER, HOT WATER, O/G/C, 500 TO 1000 MBH, ANNUALIZED Laars Hydronic 4174 NA X X X X NA

7265 D3025 140 1950 BOILERS, STEAM, O/G/C, UP TO 120 MBH, ANNUALIZED Burnham LPS 51 Under 1,000,000 Btu/h X X X Once every week during operation

7265 D3025 140 1950 BOILERS, STEAM, O/G/C, UP TO 120 MBH, ANNUALIZED Burnham LPS 51 Under 1,000,000 Btu/h X X X Once every week during operation

9559 D3025 140 1950 BOILERS, STEAM, O/G/C, UP TO 120 MBH, ANNUALIZED LPS 115 Under 1,000,000 Btu/h X X X Once every week during operation

5126 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

2212 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 150 Under 1,000,000 Btu/h X X X X Once every week during operation

2212 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 150 Under 1,000,000 Btu/h X X X X Once every week during operation

5329 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

5329 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

5333 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

5126 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

5201 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 202 Under 1,000,000 Btu/h X X X X Once every week during operation

5201 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 202 Under 1,000,000 Btu/h X X X X Once every week during operation

6262 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

6262 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

6211 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

6211 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

7250 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

7250 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

6211 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

7508 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

7508 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 200 Under 1,000,000 Btu/h X X X X Once every week during operation

5253 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

8124 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

8124 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

8197 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

5253 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

8197 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

8199 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

8199 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 250 Under 1,000,000 Btu/h X X X X Once every week during operation

8306 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8306 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8317 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8317 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8364 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

6210 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

8364 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

8450 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

6210 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

8450 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8535 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8535 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

8574 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

8574 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

9268 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

9268 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 483 Under 1,000,000 Btu/h X X X X Once every week during operation

9341 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

9341 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

9477 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

9477 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

10306 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

10306 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

10488 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

Preventive Maintenance FrequencyInventory

Draft

10488 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 347 Under 1,000,000 Btu/h X X X X Once every week during operation

10555 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 202 Under 1,000,000 Btu/h X X X X Once every week during operation

11540/11550 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

11540/11550 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

11540/11550 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED LPS 231 Under 1,000,000 Btu/h X X X X Once every week during operation

6258 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 349 Under 1,000,000 Btu/h X X X X Once every week during operation

6258 D3025 140 2950 BOILERS, STEAM, O/G/C, 120 To 500 MBH, ANNUALIZED Burnham LPS 349 Under 1,000,000 Btu/h X X X X Once every week during operation

6230 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

6230 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

6315 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

6315 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

7113 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7113 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7163 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7163 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7181 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7181 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

7377 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

7377 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

8378 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

8378 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

5223 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

5223 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

8549 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

8549 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

9327 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

9327 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 959 Under 1,000,000 Btu/h X X X X Once every week during operation

2204A D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

2204A D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED Burnham LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

9336 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

9336 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

9551 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

9551 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

10337 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

10427 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

10427 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

10435 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

10435 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

10437 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

10441 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

10441 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 808 Under 1,000,000 Btu/h X X X X Once every week during operation

11575 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

11575 D3025 140 3950 BOILERS, STEAM, O/G/C, 500 to 1000 MBH, ANUALIZED LPS 646 Under 1,000,000 Btu/h X X X X Once every week during operation

2204 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 2154 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

4241 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 4551 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

4241 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 4551 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4109 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Laars LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

5250 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3957 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

5250 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3957 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

5257 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3580 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

5257 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3580 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6253 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

5333 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

5385 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6136 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6136 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6253 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6260 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3353 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6260 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3353 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6263 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6263 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6263 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

6263 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

7079 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1941 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7079 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1941 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7122 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7122 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7148 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7148 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7153 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

7153 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

7176 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7176 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7179 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3957 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

7179 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3957 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

7228 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7228 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7271 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7271 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7301 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1741 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7301 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7535 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1941 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

7535 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1941 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8088 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3129 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8088 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3129 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8113 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8113 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8237 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8237 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8288 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2154 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8288 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2154 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8326 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2503 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8326 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 2503 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8515 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 2154 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8515 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 2154 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

8517 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8517 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8565 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2730 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

8565 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2730 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9311 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9311 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9311 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9387 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2730 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9387 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 2730 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9480 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3580 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9480 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3580 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9480 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3580 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9497 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9497 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1714 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9510 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9510 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9510 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

9549 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9549 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9569 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

9569 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1110 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10286 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10286 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10471 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3129 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10480 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3129 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

10480 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3129 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

11415 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

11415 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

11525 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

11525 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 3739 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

11535 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

11535 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10364/10369 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

10364/10369 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1528 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6326 (CS) D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

6326 (CS) D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH LPS 1342 1,000,000 Btu/h to 5,000,000 Btu/h X X X X Twice per week during operation

4251 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

4251 D3025 140 4950 BOILERS, STEAM, O/G/C FIRED OVER 1000MBH Burnham LPS 4551 Over 5,000,000 Btu/h X X X X Once per 24 hour period during operation

2204 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 100 Under 5,000,000 Btu/h X X Once per month when operationg

4109 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Laars LPS 4551 Under 5,000,000 Btu/h X X Once per month when operationg

5126 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 90 Under 5,000,000 Btu/h X X Once per month when operationg

6263 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

6263 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

7079 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7079 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7113 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

7113 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

7153 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7153 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7179 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7179 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 745 Under 5,000,000 Btu/h X X Once per month when operationg

7535 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

8088 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

8378 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

8378 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 645 Under 5,000,000 Btu/h X X Once per month when operationg

8450 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

8574 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 65 Under 5,000,000 Btu/h X X Once per month when operationg

9361 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 1796 Under 5,000,000 Btu/h X X Once per month when operationg

9361 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 1796 Under 5,000,000 Btu/h X X Once per month when operationg

9387 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 1796 Under 5,000,000 Btu/h X X Once per month when operationg

10471 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

10471 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

10480 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

10480 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

10571 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 1796 Under 5,000,000 Btu/h X X Once per month when operationg

11415 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED Lochinvar LPS 495 Under 5,000,000 Btu/h X X Once per month when operationg

11525 D2025 260 3950 WATER HEATER, STEAM COIL, TO 2500 GAL, ANNUALIZED LPS 1796 Under 5,000,000 Btu/h X X Once per month when operationg

6252 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6252 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6252 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6252 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6254 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6254 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6254 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6254 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6256 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6256 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6256 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6256 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6258 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6264 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6264 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6264 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6264 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6266 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6266 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6266 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

6266 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 100 NA X NA

7265 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 750 NA X NA

11519 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

11519 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

11519 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

11523 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

11523 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

11523 D3055 110 3950 SPACE HEATER, UNIT HEATER, STEAM, ANNUALIZWD Gas 400 NA X NA

8481 D3055 122 2950 FORCED AIR HEATER, OIL/GAS OVER 120MBH, ANNUALIZED Reznor Furnace 400 NA X X X NA

6211 D3095 118 2950 AIR COMPRESSOR, RECIPROCATING,5 TO 40 HP, ANNUALIZED Ingersoll Rand NA NA NA X X X X NA

9480 D3095 210 1950 STEAM HUMIDIFICATION SYSTEMS NA NA NA X X X X NA

6211 G3015 650 1950 WATER SOFTENER, ANNUALIZED Sofner NA NA X X X NA

9480 G3015 650 1950 WATER SOFTENER, ANNUALIZED Sofner NA NA X X X NA