Drawings.pdf

PDF 4 MB Posted

Attached to
Maintain Airfield Markings and Rubber Removal Federal contract opportunity
Solicitation number
FA489720B0002
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a federal contract solicitation and related drawings. The solicitation is for construction services to maintain airfield markings and conduct rubber removal at Mountain Home Air Force Base in Idaho. It is a small business set-aside with a NAICS code of 23710 and size standard of $36.5 million. Interested parties must register with SAM and review the site for any updates or amendments. The period of performance is 120 calendar days for a requirement between $250,000 to $500,000. A firm fixed-price contract will be awarded based on the lowest priced bid meeting requirements. Bids are due by July 20th via email and a site visit will be held on July 7th.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Airfield Paint Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 600 1,200300 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement Buildings

DRAFT

Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 775 1,550387.5 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement

Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 980 1,960490 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement

Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 930 1,860465 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement

Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 890 1,780445 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement

Mountain Home AFB

Department of the Air Force Prepared By: 366 CES/CENME

Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N

0 710 1,420355 Feet

Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking

Paint Not in Project Pavement

File details come from the government source that posted it. Updated .