4)_Bldg_2316_Schedule_of_Submittals.pdf

PDF 26 KB Posted

Attached to
Repair Roof Bldg 2316 Federal contract opportunity
Solicitation number
FA489720B0001
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a material submittals schedule and a federal contract opportunity solicitation for repairing the roof of Building 2316. The material submittals schedule outlines 23 required submittals for the roof repair project such as environmental management plans, safety plans, notices, drawings, warranties, and schedules. Due dates for the various submittals range from 10 to 15 days after notice to proceed up to project closeout.

The federal contract opportunity solicitation is a total small business set-aside for repairing the roof of Building 2316 with an estimated value between $250,000 to $500,000. The solicitation specifies using firm-fixed pricing and provides bidding instructions including addressing envelopes, delivery addresses, and questions due by November 11th. An amendment with answers will follow. The pre-bid site visit is scheduled for November 4th at Mountain Home AFB, and contractors must submit visitor requests by October 30th and October 31st for in-person bid submissions. The Department of the Air Force Air Combat Command is the issuing agency.

Schedule of Submittals Bldg 2316

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

1 01 57 19 - Environmental Management Plan - Section 1.4.1 "Waste Management Plan" 3 NTP+10days

2 01 57 19 - Names of responsible parties (for contractor) 3 NTP+10days

3 01 57 19 - List of Hazardous Materials with SDS' 2 NTP+10days 4 01 57 19 - Non-Hazarous Disposal Procedures 3 NTP+10days

8 01 57 19 - Weight tickets for solid waste and recycling, to include contaminated soils and asbestos-containing materials 1

Prior to Project

Closeout

9 01 14 00, 1.1 Submittals SD-01 - List of Contact Personnel 2 NTP+10days

10 01 33 00, 1.2 Submittals, Submittals marked (G). 2 Prior to material placement

11 01 33 00, Para. 1.2 - SD-02 Shop Drawings, SD-03 Product Data, SD-04 - Samples, SD-07 - Certificates, SD-06 - Test Reports 2 2 2 2 2 2 2

Prior to start of construction

12 01 35 26, Section 1.3 - Accident Preventation Plan, Accident Reports, Qualifications of SSHO 2 NTP+10days

13 01 45 00, Section 1.3 - Quality Control Plan 2 NTP+10days

14 01 45 35 Section 1.4 - Name and qualifications of special inspector or Manufacturer's certified representative 2 NTP+ 10days

15 01 50 00 Section 1.2 - Construction site plan, temp power drawings 2 NTP

16 01 57 19 - MHAFB Environmental Specifications - Section 1.3 Submittals, Attachments 1-4 2 2 2 2 Prior to demolition

01 74 19, Construction and Demolition Waste Management - Section 1.3, Provide submittals in accordance with Section 1.3 - Waste Management Plan (G) and Records (G).

2 2

Plan - at NTP+15days, Records - at

Project Completion

18 01 78 00, SD-11, Operations and Maintainance Manuals, SD-11 Closeout Submittals 2 2

Prior to Project

Closeout

19 02 41 00, Section 1.5 Demolition Plan, Notification, Receipts 2 NTP+10days

07 22 00 - Roof and Deck Insulation - Provide submittals according to Section 1.2 - 1.7 instructions to verify compliance with Manufacturers PVC roof system.

2 2 2 2 2 NTP+10days

07 54 19, Polyvinyl-Choride Roofing - Provide submittals according to Section. 1.4 submittals to verify compliance with manufacturers PVC roof system

2 2 2 2 NTP+10days

07 54 19, Section 1.10 Warranty - Manufacturers 20-year No Dollar Limit Watertight warranty, Installing contractor's 2-year warranty, Information Card, Instructions to Government Personnel

Prior to project closeout

07 60 00, Section 1.3 - Provide submittals according to Section 1.3 instructions to verify compliance with manufacturers PVC roof system.

2 2 2 2 NTP+10 days

R et ur n

Su sp en se

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

C ol or S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

C at al og

D at a

Project Number:

1068396

Project Title:

Repair Roof, Dining Hall Fac 2316

Solicitation / Contract Number:

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d Su bm is si on

D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

Material Submittals Schedule

File details come from the government source that posted it. Updated .