This document contains a material submittals schedule and a federal contract opportunity solicitation for repairing the roof of Building 2316. The material submittals schedule outlines 23 required submittals for the roof repair project such as environmental management plans, safety plans, notices, drawings, warranties, and schedules. Due dates for the various submittals range from 10 to 15 days after notice to proceed up to project closeout.
The federal contract opportunity solicitation is a total small business set-aside for repairing the roof of Building 2316 with an estimated value between $250,000 to $500,000. The solicitation specifies using firm-fixed pricing and provides bidding instructions including addressing envelopes, delivery addresses, and questions due by November 11th. An amendment with answers will follow. The pre-bid site visit is scheduled for November 4th at Mountain Home AFB, and contractors must submit visitor requests by October 30th and October 31st for in-person bid submissions. The Department of the Air Force Air Combat Command is the issuing agency.
Schedule of Submittals Bldg 2316
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Site Inspection Questions and Answers Bldg 2316.docx | DOCX document | |
| Bldg 2316 - Lay down Area.pdf | ||
| Addendum 3 Bldg 2316.pdf | ||
| Solicitation Amendment FA489720B00010003 SF 30.pdf | ||
| Site Visit Sign-In Sheet Bldg 2316.pdf | ||
| Solicitation Amendment FA489720B00010002 SF 30.pdf | ||
| Addendum 2 Bldg 2316.pdf | ||
| Solicitation_Amendment_FA489720B00010001_SF_30.pdf | ||
| Solicitation_Amendment_-_FA489720B00010001.pdf | ||
| 2)_Final_Drawings_Bldg_2316.pdf | ||
| 3)_Final_Specifications_for_Bldg_2316_roof.pdf | ||
| 1)_SOW_Bldg_2316.pdf | ||
| 6)_366_SFS_FORM_30.pdf | ||
| 5)_Wage_Determination.pdf | ||
| Solicitation_-_FA489720B0001.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 01 57 19 - Environmental Management Plan - Section 1.4.1 "Waste Management Plan" 3 NTP+10days
2 01 57 19 - Names of responsible parties (for contractor) 3 NTP+10days
3 01 57 19 - List of Hazardous Materials with SDS' 2 NTP+10days 4 01 57 19 - Non-Hazarous Disposal Procedures 3 NTP+10days
8 01 57 19 - Weight tickets for solid waste and recycling, to include contaminated soils and asbestos-containing materials 1
Prior to Project
Closeout
9 01 14 00, 1.1 Submittals SD-01 - List of Contact Personnel 2 NTP+10days
10 01 33 00, 1.2 Submittals, Submittals marked (G). 2 Prior to material placement
11 01 33 00, Para. 1.2 - SD-02 Shop Drawings, SD-03 Product Data, SD-04 - Samples, SD-07 - Certificates, SD-06 - Test Reports 2 2 2 2 2 2 2
Prior to start of construction
12 01 35 26, Section 1.3 - Accident Preventation Plan, Accident Reports, Qualifications of SSHO 2 NTP+10days
13 01 45 00, Section 1.3 - Quality Control Plan 2 NTP+10days
14 01 45 35 Section 1.4 - Name and qualifications of special inspector or Manufacturer's certified representative 2 NTP+ 10days
15 01 50 00 Section 1.2 - Construction site plan, temp power drawings 2 NTP
16 01 57 19 - MHAFB Environmental Specifications - Section 1.3 Submittals, Attachments 1-4 2 2 2 2 Prior to demolition
01 74 19, Construction and Demolition Waste Management - Section 1.3, Provide submittals in accordance with Section 1.3 - Waste Management Plan (G) and Records (G).
2 2
Plan - at NTP+15days, Records - at
Project Completion
18 01 78 00, SD-11, Operations and Maintainance Manuals, SD-11 Closeout Submittals 2 2
Prior to Project
Closeout
19 02 41 00, Section 1.5 Demolition Plan, Notification, Receipts 2 NTP+10days
07 22 00 - Roof and Deck Insulation - Provide submittals according to Section 1.2 - 1.7 instructions to verify compliance with Manufacturers PVC roof system.
2 2 2 2 2 NTP+10days
07 54 19, Polyvinyl-Choride Roofing - Provide submittals according to Section. 1.4 submittals to verify compliance with manufacturers PVC roof system
2 2 2 2 NTP+10days
07 54 19, Section 1.10 Warranty - Manufacturers 20-year No Dollar Limit Watertight warranty, Installing contractor's 2-year warranty, Information Card, Instructions to Government Personnel
Prior to project closeout
07 60 00, Section 1.3 - Provide submittals according to Section 1.3 instructions to verify compliance with manufacturers PVC roof system.
2 2 2 2 NTP+10 days
R et ur n
Su sp en se
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
C ol or S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
M an uf ac tu re r's W ar ra nt y
C at al og
D at a
Project Number:
1068396
Project Title:
Repair Roof, Dining Hall Fac 2316
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
R eq ui re d Su bm is si on
D at e
Item or Description of Item, Contract Reference, Type of Submittal
C er tif ic at e of C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
C on tra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required
D at e R ec ei ve d in C on tra ct in g
Fi el d R ep or ts
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns
Material Submittals Schedule