3)_Final_Specifications_for_Bldg_2316_roof.pdf
PDF 3 MB Posted
- Attached to
- Repair Roof Bldg 2316 Federal contract opportunity
- Solicitation number
- FA489720B0001
About this file
This federal contract solicitation is for repair of the roof on Building 2316 at Mountain Home Air Force Base in Idaho. The total project value is estimated between $250,000 and $500,000. The acquisition is set aside for total small businesses with a size standard of $15 million. Bids are due by 4:30 PM MST on 18 November 2019. A site visit will take place on 4 November 2019 at 10:00 AM MST. Interested contractors must submit SF Form 30 for base access by 30 October and 7 days prior to the bid closing date if submitting bids in person. Questions are due in writing by 4:30 PM MST on 11 November 2019, with an amendment to follow with answers. The contract will be a firm-fixed-price award.
Final Specifications for Bldg 2316
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid Site Inspection Questions and Answers Bldg 2316.docx | DOCX document | |
| Bldg 2316 - Lay down Area.pdf | ||
| Addendum 3 Bldg 2316.pdf | ||
| Solicitation Amendment FA489720B00010003 SF 30.pdf | ||
| Site Visit Sign-In Sheet Bldg 2316.pdf | ||
| Solicitation Amendment FA489720B00010002 SF 30.pdf | ||
| Addendum 2 Bldg 2316.pdf | ||
| Solicitation_Amendment_FA489720B00010001_SF_30.pdf | ||
| Solicitation_Amendment_-_FA489720B00010001.pdf | ||
| 2)_Final_Drawings_Bldg_2316.pdf | ||
| 1)_SOW_Bldg_2316.pdf | ||
| 6)_366_SFS_FORM_30.pdf | ||
| 5)_Wage_Determination.pdf | ||
| Solicitation_-_FA489720B0001.pdf | ||
| 4)_Bldg_2316_Schedule_of_Submittals.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR ROOF, DINING HALL Fac 2316
AF PROJECT NO. 1068396
MOUNTAIN HOME AIR FORCE BASE, IDAHO
May 29, 2019
366th Civil Engineer Squadron 1030 Liberator Street Building 1300 Mountain Home, Idaho 83648-5442
CONTRACT SPECIFICATIONS
Table of Contents Pages
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK…………………………………………………….1-2
01 33 00 SUBMITTAL PROCEDURES………………………………………………1-8
01 35 26 GOVERNMENT SAFETY REQUIREMENTS……………………………..1-12
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS………………………….1-4
01 45 00 QUALITY CONTROL………………………………………………………1-8
01 45 35 SPECIAL INSPECTIONS…………………………………………………...1-4
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS……...1-7
01 57 19 MHAFB ENVIRONMENTAL SPECIFICATIONS………………………...1-8
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT……...1-9
01 78 00 CLOSEOUT SUBMITTALS………………………………………………...1-2
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION………………………………..1-5
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION………………………………………..1-4
07 54 19 POLYVINYL-CHLORIDE ROOFING……………………………………1-17
07 60 00 FLASHING AND SHEET METAL……………………………………......1-6
DIVISION 22 – PLUMBING
ATTACHMENTS
1 – AF FORM 3000 SUBMITTAL FORM
2 – SCHEDULE OF SUBMITTALS
3 – DD 1354 REAL PROPERTY FORM
REPAIR ROOF, DINING HALL Fac 2316 MOUNTAIN HOME AIR FORCE BASE
PROJECT NO. 1068396
Section 01 11 00 – Summary of Work 1 | 2
SECTION 01 11 00
Summary of Work
1.0 WORK COVERED BY CONTRACT DOCUMENTS
Project Description
1. The work includes the demolition and replacement of the Section B roofing of Building
2316 located at Mountain Home Air Force Base, Idaho. There is approximately 14,788 sf of roof surface. Demolition work will include the removal of existing gravel, roof membrane and insulation down to the existing roof deck, existing roof drains, flashings, copings, expansion joint, trim and all other items associated with the current roofing system. All non-hazardous materials removed shall become property of the contractor and shall be transported to off-base landfills in accordance with MHAFB Environmental Specifications.
2. A new and complete 80 mil PVC roof membrane system with a minimum slope of
¼”/12” shall be installed with proper drainage to prevent water ponding on the roof. All existing roof mounted equipment including existing utility and electrical conduits shall remain operational and shall be temporarily supported as needed during demolition and new construction. Demolition shall also include the removal and disposal of five (5) abandoned roof curbs in the roof that were formerly used for HVAC equipment. Each roof opening shall be patched to match adjacent roofing materials. Refer to Sheet 2 of 4 and to photos on Sheet 4 of 4 in the contract drawings. The contractor will be required to obtain a “Hot Work Permit” regardless of the method chosen to remove the metal assembly under each curb. The permit is issued by MHAFB Fire Department, and will outline safety controls required to be utilized when removing this structure. When the permit is issued the Fire Department will inspect the equipment to be used for good serviceable condition; ensure the contractor’s fire extinguisher (10-lbs ABC) is serviceable and will brief the supervisor/employee performing the removal. The permit must be issued before work can be initialed and plan for 1-2 day lead time to get the permit.
All construction shall be in compliance with requirements of UFC 1-200-01 DoD
Building Code (General Building Requirements), with Change 2 and UFC 3-110-03 Roofing, with Change 2.
3. Final acceptance by the Contracting Officer (CO) to include a demonstration that proper roof drainage has been achieved.
1.1 Location
Building 2316 is located on Mountain Home Air Force Base, Idaho near the intersection of Aardvark Avenue and Falcon Street. See contract drawings for exact location.
Section 01 11 00 – Summary of Work 2 | 2
1.2 Contract Drawings
All measurements and areas shown, including photos are for reference only. The contractor shall be responsible for measuring actual elevations and dimensions in the field, and for verifying the accuracy of details shown on roofing plan drawings.
1.3 Work Rescheduling
Normal duty hours for work are from 7:00 a.m. to 5:00 PM, Monday through Friday.
Requests to work additional hours or on weekends requires written approval from the Contracting Officer seven (7) days in advance of the proposed work period.
1.4 Occupancy of Premises
Building 2316 will be occupied during the performance of work. Contractor shall meet with the Contracting Officer, Program Manager, and with the Facility Manager during the preconstruction meeting to establish procedures for accessing the roof from the building exterior, for working adjacent to and inside secured areas of the building when necessary, and to select the contractor’s equipment laydown area.
1.5 EXISTING WORK
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
Remove or alter existing work in such a manner as to prevent injury or damage to portions of the building or adjacent landscaping not part of the project. Repair or replace portions of the building that have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started, including any damage to landscaping adjacent to Building 2316.
1.6 Utility Outage Requests and Utility Connection Requests
Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect dining facility systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions to the Government. Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least seven (7) calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.
-- End of Section –
Section 01 14 00 – Work Restrictions 1 | 9
SECTION 01 14 00
Work Restrictions
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 - SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel Planned Working Hour Schedule
1.3 GENERAL CONTRACTOR ACCESS AND USE OF PREMISES
Limit use of the premises to construction activities in areas indicated; allow for Government occupancy and access.
1.3.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.2 Work Areas
Confine operations to areas within Contract limits indicated. Portions of the site beyond areas in which construction operations are indicated are not to be disturbed.
1.3.3 Contracting Officer's Representative
Confer with Contracting Officer's Representative and obtain full knowledge of all site rules and regulations affecting work.
1. Conform to site rules and regulations while engaged in project construction.
2. Site rules and regulations take precedence over others that may exist outside such jurisdiction.
Section 01 14 00 – Work Restrictions 2 | 9
3. Employee list: The Contracting Officer's Representative may examine Contractor's list of employees, including those of his subcontractors and their agents at any time.
4. Vehicle use: Rigidly enforce the following:
a. Keep all vehicles, mechanized or motorized equipment locked at all times when parked and unattended on Base's premises.
b. Do not, under any circumstances, leave any vehicle unattended with motor or engine running, or with ignition key in place.
c. Parking: Permitted only in areas designated by Contracting Officer's Representative.
d. All traffic control subject to Contracting Officer's Representative approval.
1.3.4 Site Inspections
Contractor shall provide reasonable access to the site and shall not prohibit nor interfere with lawfully conducted inspections or site visits by properly identified representatives of regulatory agencies or collective bargaining units.
1. Notwithstanding the above, Contracting Officer's Representative (COR) regulation governing site security shall be observed.
2. All site visitors shall comply with personal protections regulations, including hard hats and safety glasses.
1.3.5 Access and Deliveries
Contractor shall access the site by designated haul routes only. Keep driveways and entrances serving the premises clear and available to the Government at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
1.3.6 Hauling and Haul Route Maintenance
Sweep job site and designated haul routes as required to remove all spillage, mud and soil tracked from work site or dump site and to assure no damage to Government and personal property during the performance period. Cover all loads subject to spilling such as earth fill, aggregates, Portland cement concrete materials, asphalt cement concrete materials, rubble, trash, materials taken to land fill, etc. during hauling to prevent spillage. Sweep spills immediately. Spills of hazardous materials shall be responded to in accordance with Section 01 57 19
Section 01 14 00 – Work Restrictions 3 | 9
MOUNTAIN HOME AFB (MHAFB) ENVIRONMENTAL SPECIFICATIONS.
Haul routes shall be approved by the Contracting Officer's representative to minimize impact to the base.
1.3.7 Government Operations
Perform the work so as not to interfere with the Government's operations.
1.3.8 Protection of Government Property
Protect all Government property within the site in which working, except for such property as is required to be demolished. Protect property which is to be demolished until its scheduled demolition time. Protection shall include, but not be limited to, protection from construction generated dust, debris, water, and vibration.
1.3.9 Maintenance and Repair of Pavements, Drives or Turf Areas
Maintain and repair pavements, drives or turf areas utilized during construction for access roads or storage areas, to the satisfaction of the Contracting Officer.
Costs associated with the above work shall be incidental to the contract.
1.3.10 Contractor's Planned Working Hour Schedule
Contractor shall coordinate with and obtain approval of the Contracting Office for his planned working hour schedule. Contractor shall also coordinate with and obtain approval of the Contracting Officer for any required working hours that fall outside his approved planned working hour's schedule.
1.4 SITE SPECIFIC COORDINATION AND ACCESS TO SITE
Coordination with using agencies shall be made through the Contracting Officer to assist the Contractor in completing the work with a minimum of interference and inconvenience.
All Contractor-owned and privately-owned vehicles are required to have a valid state registration and valid insurance. Before any base access credential is issued, the issuing official will check the individual's operator's license, vehicle registration, and vehicle insurance.
1.4.1 Employee Parking
Contractor employees shall park privately owned vehicles in an area designated by the Contracting Officer. The area will be within reasonable walking distance of the construction site. Contractor employee parking shall not interfere with existing and established parking requirements of the military installation.
Section 01 14 00 – Work Restrictions 4 | 9
Contractor personnel shall comply with all other parking signs and regulations on the installation.
1.4.2 Identification of Employees and Military Regulations
a. The Contractor shall be responsible for compliance with all regulations and orders of the Commanding Officer of the Military Installation, respecting identification of employees, movements on installation, parking, truck entry, and all other military regulations which may affect the work.
b. The work under this Contract is to be performed at an operating Military Installation with consequent restrictions on entry and movement of nonmilitary personnel and equipment.
c. All personnel while on the installation may be subject to search.
1.4.3 Base Access
A. Temporary ID's issued by the security forces will be required for all contractor and delivery personnel.
1. The Contractor will submit SF Form 30s, which reflects the individual's full name, gender, SSN, DOB, driver's license number and state or passport number, dates and times for access, and company name, to the Contracting Officer Representative. The Contractor is not authorized to act as a sponsor for any personnel, sub-contractors, or delivery personnel.
2. The Contracting Officer Representative will indicate their name as the sponsor and sign the SF Form 30.
3. The Contracting Officer Representative will either hand carry or send the signed SF Form 30 to security forces. SF Form 30s are required to be received by the security forces at least 2 weeks before base access is required. However, if submitting numerous SF Form 30s (e.g., at the start of the project), the forms need to be submitted at least 6 weeks before base access is required. Failure to meet the time limits identified above will result in delays accessing the installation.
Telephone sponsorship is not authorized.
4. The security forces will complete a base access background check for all personnel requesting a pass.
5. Once the background checks are completed, the Contracting Officer Representative will be notified of the results.
6. If the request for access is denied, the Contracting Officer Representative will be sent a denial letter, which they will be responsible for sending to the
Section 01 14 00 – Work Restrictions 5 | 9
Contractor. Specific information obtained during the background check will not be released to the Contracting Officer Representative, the Contractor or the individual the check was complete on. The denial letter will also reflect the rebuttal process.
7. If the request for access is approved, the Contracting Officer Representative will be sent a copy of the approved SF Form 30, which they will be responsible for sending to the Contractor.
8. Contractor personnel will be required to bring a copy of the approved SF Form 30 to the Visitor Center (Bldg. 6400) during normal business hours to be issued their pass. The individual receiving the pass must present the approved SF Form 30 and a valid form of identification (with a photograph on it). If the individual is operating a vehicle they must also produce the vehicle registration, vehicle insurance, and a valid operator license (for the type of vehicle they are operating) before their pass is issued. Contractor passes can only be issued at the Visitor Center, not the Grand View Gate.
9. Contractor personnel will be issued Temp ID's that allows access for the specific times and dates requested. If, during the project, access is required at other times, the Contractor must coordinate this access with the Contracting Officer Representative who must coordinate access with the security forces.
10. Delivery personnel will be required to bring a copy of the approved SF Form 30 to the Grand View Gate (Bldg. 3200) during operating hours to be issued a pass. The individual receiving the pass must present the approved SF Form 30, a valid form of identification (with a photograph on it), vehicle registration, vehicle insurance, and a valid operator license (for the type of vehicle they are operating) before their pass is issued. If the pass is for over 30 days the individual must respond to the Visitor Center and not the Grand View Gate to receive a pass.
11. Delivery personnel will be issued a MHAFB pass that allows access for the specific times and dates of the delivery.
12. Personnel who arrive at the gate (either Grand View or the Visitor Center) without an approved SF Form 30 will be denied access until the security forces receives SF Form 30 (must be received from an authorized sponsor IAW establish procedures) and the individual has passed the required back-ground checks.
Personnel who arrive at the gate without an approved SF Form 30 will be processed and vetted on a first come first served basis.
13. All personnel must maintain their base access pass on them at all times and will surrender it to security forces when requested. All personnel must produce a base access pass to be allowed on the installation.
Section 01 14 00 – Work Restrictions 6 | 9
B. Commercial Vehicle Access. A marked commercial vehicle is any, non-government, vehicle designed for commercial purposes regardless of weight.
1. All marked commercial vehicles will undergo inspections/sweeps before being allowed access to MHAFB. These vehicles may enter the installation after being inspected and all occupants have met base access requirements.
2. All marked commercial vehicles, to include delivery and contract vehicles, will enter the installation through the Grand View Gate.
3. Traffic at the Grand View Gate can become heavy during morning rush, lunch time, or when personnel do not have the proper paperwork (e.g., completed SF Form 30 or sponsors information). Delays can range from a few minutes to over 2 hours. If the Contractor has time sensitive deliveries (e.g., cement delivery), they must coordinate their arrival, at least 1 week in advance, with the Contracting Officer Representative and security forces. The Contracting Officer Representative and security forces will coordinate on specific procedures to expedite access for time sensitive deliveries. However, the vehicles must still be searched IAW established procedures.
4. Grand View Gate is open Monday through Friday 0700 to 1600, subject to change. Requests for access during other times must be coordinated through the Contracting Officer Representative and security forces, and will be handled on a case by case basis. Security forces will need at least 2 weeks notice.
5. Commercial vehicles may access the base through the Main Gate only after coordination with the Contracting Officer Representative and approval from security forces. The vehicles must still be searched IAW established commercial vehicle procedures.
6 Commercial vehicles can depart the installation through either gate. However, there is a width restriction at the Main Gate of 14 feet wide (maximum).
C. Privately owned vehicles (POV), that are not commercially marked, may access and depart the base via the Main Gate. Carpooling POVs onto base is encouraged.
D. All vehicles entering the installation and all personnel on the installation may be subject to search.
E. All vehicle operators will comply with all base traffic regulations, to include restrictions on use of cell phones and radar detectors.
Section 01 14 00 – Work Restrictions 7 | 9
F. Procedures for personnel and vehicle access to MHAFB are subject to change without prior notice.
1.4.4 Base Access Security Procedures
Security procedures will be used at all entrances to the base.
1.4.5 Other Contracts
Other Contractors may be working on the installation and surrounding areas that will require coordination.
1.4.6 Keys
When keys are required for access to facilities on this contract, they shall be obtained through the Contracting Officer.
The Contractor shall be responsible for Government-owned keys issued for access to facilities or areas pertinent to this contract.
Upon completion of work in an area, or upon request of the Contracting Officer, the key or keys relevant to the completed areas shall be returned.
Should the Contractor lose a key:
a. the Contracting Officer shall be notified, in writing, within three
(3) working days after the loss is discovered and;
b. should the key not be found before final acceptance, the final contract payment shall be reduced by $100 for each key not returned.
1.5 COORDINATION, SAFETY AND REGULATORY REQUIREMENTS
1.5.1 Pre-Construction Permits
Before construction commences, the Contractor shall follow the procedures outlined in Section 01 11 00B 366 CES OI 32-3003 Base Civil Engineer Work Clearance Request (Dig Permit).
1.5.3 Fire Extinguishers
Fire extinguishers will be required on construction equipment. A 10 lb ABC minimum rating is required for fire extinguishers.
Section 01 14 00 – Work Restrictions 8 | 9
1.5.4 Blasting
Blasting is prohibited on base property.
1.6 STAGING AREA
1.6.1 On-Site Storage Area
On - site storage of construction materials and equipment is limited.
Location of an on-base storage area will be identified at the preconstruction meeting or as shown on the project drawings. Contractor is responsible for keeping weeds cut, debris picked up, keeping storage site clean, and for restoring the storage site to its original condition at the conclusion of construction.
1.6.2 Vehicles and Equipment
All vehicles and equipment must be stored at the staging area or other approved area when not in use.
1.6.3 Storage Area Security
The staging area is unsecured. The Contractor is responsible for securing all equipment and supplies at no additional cost to the Government.
1.7 CLEAN UP
Throughout the construction period and at the completion of the work, the Contractor shall maintain the project site to the standard of cleanliness described in this section. In addition to the general standards described in this section, the Contractor shall comply with all specific requirements for cleaning or clean up as described in various sections of these specifications.
1.7.1 Inspection
The Contracting Officer and the Contractor shall conduct regular inspections to verify that requirements of cleanliness are being met. In addition to the standards described in this section, the Contractor shall comply with all pertinent requirements of other agencies having jurisdiction.
1.7.2 Cleaning Materials and Equipment
Provide all required personnel, equipment, and materials needed to maintain the specified standards of cleanliness. Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as
Section 01 14 00 – Work Restrictions 9 | 9 recommended by the manufacturer of the material or as accepted by the Contracting Officer.
1.7.3 Periodic Cleanup
During the performance of the required work or any related operations, the Contractor shall furnish all labor, equipment, materials and means required for cleanup. The Contractor shall also carry out proper and efficient measures wherever and as often as necessary or as directed to clean up waste, debris or spillage which has originated from his operations from causing a nuisance or safety hazard to persons or aircraft.
The Contractor shall not allow scrap, debris, waste material, and other items not required for construction of the project on the work site.
At least twice each month, and more often if necessary, all scrap, debris, and waste material shall be collected and removed from the job site and disposed of in an off-site disposal approved for the contractor's use.
Storage of all items awaiting removal from the job site, shall be done in such a manner as to minimize fire hazard or environmental damage.
1.7.4 Final Clean Up
Prior to completion of the work, remove from the work site all tools, surplus materials, equipment, scrap, debris, and waste.
Unless otherwise specifically directed by the Contracting Officer, broom clean all paved areas on the site and all public paved areas directly adjacent to the site. Completely remove all resultant debris. Contractor shall maintain staging area in an orderly condition throughout the life of the project and shall restore the staging area to its original condition upon project completion.
Grassed areas within or adjacent to the work site shall be scraped and raked clean to the original grass or soil level. All stones larger than 3/4 inches in diameter and other loose debris shall be picked up and removed.
Schedule final cleaning and cleanup to enable the Government to accept a clean, finished project.
-- End of Section --
Section 01 33 00 – Submittal Procedures 1 |8
SUBMITTAL PROCEDURES
SECTION 01 33 00
1.0 DEFINITIONS
Action Submittal: Written and graphic information submitted by Contractor that requires Contracting Officer’s approval.
1.1 PROCEDURES
A. Direct all submittals to the Contracting Officer. Contractor shall review submittal requirements for each section of the contract specifications and provide all items listed.
B. Transmittal of Submittal:
1. Contractor shall review each submittal and check for compliance with Drawings and Specifications.
2. Complete, sign, and transmit with each submittal package, one Transmittal of Contractor’s Submittal form attached to Appendix D.
3. Identify each submittal with the following:
a. Numbering and Tracking System:
1) Sequentially number each submittal.
2) Resubmission of submittal shall have original number with sequential alphabetic suffix.
b. Specification section and paragraph to which submittal applies.
c. Project title and Government Project number.
d. Date of transmittal.
e. Names of Contractor, Subcontractor or Supplier, and manufacturer as appropriate.
4. Identify and describe each deviation or variation from Drawings and
Specifications. Deviations or variations from contract requirements require Government approval pursuant to contract Clause Federal Acquisition Regulation (FAR) 52.236-21 Specifications and Drawings for Construction; FAR 52.236-5 Material and Workmanship; Defense Federal Acquisition Regulation Supplement (DFARS) 252.236-7000 Modification Proposals, and will be considered where advantageous to the Government.”
Section 01 33 00 – Submittal Procedures 2 |8
C. Format:
1. Do not base shop drawings on reproductions of Contract Drawings.
2. Package submittal information by individual specification section. Do not combine different specification sections together in submittal package, unless otherwise directed in specification.
3. Present in a clear and thorough manner and in sufficient detail to show kind, size, arrangement, and function of components, materials, and devices, and compliance with Drawings and Specifications.
4. Index with labeled tab dividers in orderly manner.
D. Timeliness:
Schedule and submit in accordance Schedule of Submittals, and requirements of individual specification sections.
E. Processing Time:
1. Time for review shall commence on Contracting Officer’s receipt of submittal.
2. Contracting Officer will act upon Contractor’s submittal and transmit response to Contractor not later than fourteen (14) days after receipt, unless otherwise specified.
3. Resubmittals will be subject to same review time.
F. Resubmittals: Clearly identify each correction or change made.
G. Incomplete Submittals:
1. Contracting Officer will return entire submittal for Contractor’s revision if preliminary review deems it incomplete.
2. When any of the following are missing, submittal will be deemed incomplete:
a. Contractor’s review stamp; completed and signed.
b. Transmittal of Contractor’s Submittal; completed, signed, and dated.
c. Insufficient number of copies.
1.2 SUBMITTALS
Government Furnished Material and Equipment – None
Section 01 33 00 – Submittal Procedures 3 |8
Government approval is required for submittals with a "G" designation. Submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals (G)
1) Construction Progress Schedule
2) Health and safety plan
3) Work plan
4) Environmental protection plan
SD-02 Shop Drawings (G)
SD-03 Product Data (G)
SD-04 Samples (G)
SD-06 Test Reports
SD-07 Certificates (G)
SD-08 Manufacturer's Instructions
SD-09 Manufacturer's Field Reports
SD-11 Closeout Submittals (G)
As-built drawings (G)
1.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required by individual specification sections.
B. Shop Drawings:
1. Copies: Minimum of three (3) copies plus any additional copies needed for Contractor use.
2. Identify and Indicate:
a. Applicable Contract Drawing and Detail number, products, units and assemblies, and system or equipment identification or tag numbers.
b. Equipment and Component Title: Identical to title shown on Drawings.
Section 01 33 00 – Submittal Procedures 4 |8
c. Critical field dimensions and relationships to other critical features of Work. Note dimensions established by field measurement.
d. Project-specific information drawn accurately to scale.
3. Manufacturer’s standard schematic drawings and diagrams as follows:
a. Modify to delete information that is not applicable to the Work.
b. Supplement standard information to provide information specifically applicable to the work.
4. Product Data: Provide as specified in individual specifications.
5. Foreign Manufacturers: When proposed, include names and addresses of at least two companies that maintain technical service representatives close to Project.
C. Samples:
1. Copies: Two, unless otherwise specified in individual specifications.
2. Preparation: Mount, display, or package Samples in manner specified to facilitate review of quality. Attach label on unexposed side that includes the following:
a. Manufacturer name.
b. Model number.
c. Material.
d. Sample source.
3. Manufacturer’s Color Chart: Units or sections of units showing full range of colors, textures, and patterns available.
4. Full-size Samples:
a. Size as indicated in individual specification section.
b. Prepared from same materials to be used for the Work.
c. Cured and finished in manner specified.
d. Physically identical with product proposed for use.
D. Action Submittal Dispositions: Contracting Officer will review, comment, stamp, and distribute as noted:
1. Approved:
Section 01 33 00 – Submittal Procedures 5 |8
a. Contractor may incorporate product(s) or implement Work covered by submittal.
b. Distribution:
1) Three (3) copies retained by Contracting Officer.
2) Remaining copies returned to Contractor appropriately annotated.
2. Approved as Noted:
a. Contractor may incorporate product(s) or implement Work covered by submittal, in accordance with Contracting Officer’s notations.
b. Distribution:
3. Partial Approval, Resubmit as Noted:
a. Make corrections or obtain missing portions, and resubmit.
b. Except for portions indicated, Contractor may begin to incorporate product(s) or implement Work covered by submittal, in accordance with Contracting Officer’s notations.
c. Distribution:
4. Revise and Resubmit:
a. Contractor may not incorporate product(s) or implement Work covered by submittal.
b. Distribution:
1) Three (3) copies retained by Contracting Officer.
2) Remaining copies returned to Contractor appropriately annotated.
1.4 INFORMATIONAL SUBMITTALS
A. General:
1. Copies: Submit three (3) copies, unless otherwise indicated in individual specification section.
2. Refer to individual specification sections for specific submittal requirements.
3. Contracting Officer will review each submittal. If submittal meets
Section 01 33 00 – Submittal Procedures 6 |8 conditions of the Contract, Contracting Officer will forward copy to appropriate parties. If Contracting Officer determines submittal does not meet conditions of the Contract and is therefore considered unacceptable, Contracting Officer will retain one copy and return remaining copy with review comments to Contractor, and require that submittal be corrected and resubmitted.
B. Certificates:
1. General:
a. Provide notarized statement that includes signature of entity responsible for preparing certification.
b. Signed by officer or other individual authorized to sign documents on behalf of that entity.
2. Welding: In accordance with individual specification sections.
3. Installer: Prepare written statements on manufacturer’s letterhead certifying installer complies with requirements as specified in individual specification section.
4. Material Test: Prepared by qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements.
5. Certificates of Successful Testing or Inspection: Submit when testing or inspection is required by Laws and Regulations or governing agency or specified in individual specification sections.
6. Manufacturer’s Certificate of Compliance: In accordance with individual specification sections.
7. Manufacturer’s Certificate of Proper Installation: In accordance with individual specification sections.
C. Manufacturer’s Instructions:
Written or published information that documents manufacturer’s recommendations, guidelines, and procedures in accordance with each individual specification section.
D. Statement of Qualification:
Evidence of qualification, certification, or registration as required on Drawings and Specifications to verify qualifications of professional land surveyor, engineer, materials testing
Section 01 33 00 – Submittal Procedures 7 |8 laboratory, specialty Subcontractor, trade, Specialist, consultant, installer, and other professionals.
E. Test, Evaluation, and Inspection Reports:
1. General: Shall contain signature of person responsible for test or report.
2. Factory or Laboratory:
a. Identification of material/product and specification section, type of inspection or test with referenced standard or code.
b. Date of test, Project title and number, and name and signature of authorized person.
c. Test results.
d. If test or inspection deems material or equipment not in compliance with Drawings and Specifications, identify corrective action necessary to bring into compliance.
e. Provide interpretation of test results, when requested by Contracting Officer.
f. Other items as identified in individual specification sections.
3. Field: As a minimum, include the following:
1) Project Title, Contract Number, and Project Number.
2) Date and time.
3) Record of temperature and weather conditions.
4) Identification of material/product and specification section.
5) Type and location of test, Sample, or inspection, including referenced standard or code.
6) Date issued, testing laboratory name, address, and telephone number, and name and signature of laboratory inspector.
7) If test or inspection deems material or equipment not in compliance with Drawings and Specifications, identify corrective action necessary to bring into compliance.
8) Provide interpretation of test results, when requested by Contracting Officer.
9) Other items as identified in individual specification sections.
F. Testing and Startup Data:
In accordance with individual specification sections.
1.5 SUPPLEMENTS
A. The supplements listed below are part of this Specification and are included in the Appendix.
Section 01 33 00 – Submittal Procedures 8 |8
1. Material Approval Submittal Form (AF IMT 3000).
4. Schedule of Material Submittals.
- End of Section -
Section 01 35 26 – Government Safety Requirements 1 | 9
GOVERNMENTAL SAFETY REQUIREMENTS
SECTION 01 35 26
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE A10.44 (2014) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations
ASSE/SAFE Z244.1 (2003; R 2014) Control of Hazardous Energy Lockout/Tagout and Alternative Methods
ASSE/SAFE Z359.0 (2012) Definitions and Nomenclature Used for Fall Protection and Fall Arrest
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components
ASSE/SAFE Z359.11 (2014) Safety Requirements for Full Body Harnesses
ASSE/SAFE Z359.12 (2009) Connecting Components for Personal Fall Arrest Systems
ASSE/SAFE Z359.13 (2013) Personal Energy Absorbers and Energy Absorbing Lanyards
ASSE/SAFE Z359.14 (2014) Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems
ASSE/SAFE Z359.15 (2014) Safety Requirements for Single Anchor Lifelines and Fall Arresters for Personal Fall Arrest Systems
Requirements 2 | 9
ASSE/SAFE Z359.6 (2009) Specifications and Design Requirements for Active Fall Protection Systems
ASSE/SAFE Z359.7 (2011) Qualification and Verification Testing of Fall Protection Products
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 2013; Errata 2015) Standard for Safeguarding Construction, Alteration, and Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
1.2 DEFINITIONS
1.2.1 Medical Treatment
Medical Treatment is treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
1.2.2 Near Miss
A Near Miss is a mishap resulting in no personal injury and zero property damage, but given a shift in time or position, damage or injury may have occurred (e.g., a worker falls off a scaffold and is not injured; a crane swings around to move the load and narrowly misses a parked vehicle).
1.2.3 Operating Envelope
The Operating Envelope is the area surrounding any crane or load handling equipment. Inside this "envelope" is the crane, the operator, riggers and
Requirements 3 | 9 crane walkers, other personnel involved in the operation, rigging gear between the hook, the load, the crane's supporting structure (i.e. ground or rail), the load's rigging path, the lift and rigging procedure.
1.2.4 Qualified Person (QP)
The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the work, or the project.
1.2.5 Qualified Person, Fall Protection (QP for FP)
A QP for FP is a person meeting the requirements of EM 385-1-1 Appendix Q, and ASSE/SAFE Z359.0, with a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems.
1.2.6 Recordable Injuries or Illnesses
Recordable Injuries or Illnesses are any work-related injury or illness that results in:
a. Death, regardless of the time between the injury and death, or the length of the illness;
b. Days away from work (any time lost after day of injury/illness onset);
c. Restricted work;
d. Transfer to another job;
e. Medical treatment beyond first aid;
f. Loss of consciousness; or
g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (a) through (f) above.
Requirements 4 | 9
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); (G)
SD-06 Test Reports
Accident Reports; (G)
SD-07 Certificates
Qualifications of Site Safety and Health Officer (SSHO); (G)
1.4 MONTHLY EXPOSURE REPORTS
Provide a Monthly Exposure Report. This report is a compilation of employee-hours worked each month for all site workers, both Prime and subcontractor.
1.5 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1, and the following federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern. Compliance with OSHA standards on all phases of construction is mandatory.
1.7 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.7.1 EMERGENCY MEDICAL TREATMENT
Emergency Medical Treatment: The MHAFB Urgent Care Clinic, (UCC) is available to the contractor for emergency services. The MTF will triage as necessary. Follow-on care, after the initial emergency care will not be provided.
Requirements 5 | 9
1.8 NOTIFICATIONS and REPORTS
1.8.1 Mishap Notification
Notify the Contracting Officer as soon as practical, but no more than twenty-four hours, after any mishaps, including recordable accidents, incidents, and near misses, as defined in EM 385-1-1 Appendix Q, any report of injury, illness, load handling equipment (LHE) or rigging mishaps, or any property damage. The Contractor is responsible for obtaining appropriate medical and emergency assistance and for notifying fire, law enforcement, and regulatory agencies. Immediate reporting is required for electrical mishaps, to include Arc Flash; shock; uncontrolled release of hazardous energy (includes electrical and non-electrical); load handling equipment or rigging; fall from height (any level other than same surface). These mishaps must be investigated in depth to identify all causes and to recommend hazard control measures.
Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (for example, type of construction equipment used and PPE used). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any mishap.
1.8.2 Accident Reports
Conduct an accident investigation for recordable injuries and illnesses, property damage, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. Complete the applicable USACE Accident Report Form 3394, and provide the report to the Contracting Officer within 5 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms.
1.9 SEVERE STORM PLAN
In the event of a severe storm warning, the Contractor must:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
Requirements 6 | 9
PART 2 EXECUTION
2.1 CONSTRUCTION AND OTHER WORK
Comply with EM 385-1-1, NFPA 70, NFPA 70E, NFPA 241, the APP, the AHA, Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.
PPE is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried/available on each person. Mandatory PPE includes:
a. Hard Hat
b. Long Pants
c. Appropriate Safety Shoes
d. Appropriate Class Reflective Vests
2.1.2 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocyanates, lead-based paint, and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on base.
2.1.3 Unforeseen Hazardous Material
Contract documents identify materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000). If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous.
Requirements 7 | 9
If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4, "Changes" and FAR 52.236-2, "Differing Site Conditions."
2.2 FALL PROTECTION PROGRAM
Establish a fall protection program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify roles and responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures in accordance with ASSE/SAFE Z359.2 and EM 385-1-1, Sections 21.A and 21.D.
2.2.1 Fall Protection Equipment and Systems
Enforce use of personal fall protection equipment and systems designated (to include fall arrest, restraint, and positioning) for each specific work activity in the Site Specific Fall Protection and Prevention Plan and AHA at all times when an employee is exposed to a fall hazard. Protect employees from fall hazards as specified in EM 385-1-1, Section 21.
Provide personal fall protection equipment, systems, subsystems, and components that comply with EM 385-1-1 Section 21.I, 29 CFR 1926.500 Subpart M,ASSE/SAFE Z359.0, ASSE/SAFE Z359.1, ASSE/SAFE Z359.2, ASSE/SAFE Z359.3, ASSE/SAFE Z359.4, ASSE/SAFE Z359.6, ASSE/SAFE
Z359.7, ASSE/SAFE Z359.11, ASSE/SAFE Z359.12, ASSE/SAFE Z359.13,
ASSE/SAFE Z359.14, and ASSE/SAFE Z359.15.
2.2.1.1 Additional Personal Fall Protection
Personal fall protection systems and equipment are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall protection systems are required when operating other equipment such as scissor lifts. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, travel, or while performing work.
2.2.1.2 Personal Fall Protection Harnesses
Only a full-body harness with a shock-absorbing lanyard or self-retracting lanyard is an acceptable personal fall arrest body support device. The use of body belts is not acceptable. Harnesses must have a fall arrest
Requirements 8 | 9 attachment affixed to the body support (usually a Dorsal D-ring) and specifically designated for attachment to the rest of the system. Snap hooks and carabiners must be self-closing and self-locking, capable of being opened only by at least two consecutive deliberate actions and have a minimum gate strength of 3,600 lbs in all directions. Use webbing, straps, and ropes made of synthetic fiber. The maximum free fall distance when using fall arrest equipment must not exceed 6 feet, unless the proper energy absorbing lanyard is used. Always take into consideration the total fall distance and any swinging of the worker (pendulum-like motion), that can occur during a fall, when attaching a person to a fall arrest system. All full body harnesses must be equipped with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance in accordance with EM 385-1-1, Section 21.I.06.
2.2.2 Rescue and Evacuation Plan and Procedures
When personal fall arrest systems are used, ensure that the mishap victim can self-rescue or can be rescued promptly should a fall occur. Prepare a Rescue and Evacuation Plan and include a detailed discussion of the following: methods of rescue; methods of self-rescue or assisted-rescue;
equipment used; training requirement; specialized training for the rescuers; procedures for requesting rescue and medical assistance; and transportation routes to a medical facility. Include the Rescue and Evacuation Plan within the Activity Hazard Analysis (AHA) for the phase of work, in the Fall Protection and Prevention (FP&P) Plan, and the Accident Prevention Plan (APP). The plan must comply with the requirements of EM 385-1-1, ASSE/SAFE Z359.2, and ASSE/SAFE Z359.4.
2.3 EQUIPMENT
2.3.1 Material Handling Equipment (MHE)
a. Material handling equipment such as forklifts must not be modified with work platform attachments for supporting employees unless specifically delineated in the manufacturer's printed operating instructions. Material handling equipment fitted with personnel work platform attachments are prohibited from traveling or positioning while personnel are working on the platform.
b. The use of hooks on equipment for lifting of material must be in accordance with manufacturer's printed instructions. Material Handling Equipment Operators must be trained in accordance with OSHA 29 CFR 1910, Subpart N.
c. Operators of forklifts or power industrial trucks must be licensed in accordance with OSHA.
Requirements 9 | 9
2.3.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .