Responses to industry submitted questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBOSOL_XFS_19_Office_Trailers_AM5.pdf | ||
| SPECS_XFS_Offices_Trailers_29May19.pdf | ||
| SFS_Form_30.pdf | ||
| Q_and_A_XFS_19_Office_Trailers.pdf | ||
| SPECS_XFS_19_Office_Trailers.pdf | ||
| COMBOSOL_XFS_19_Office_Trailers.pdf | ||
| SPECS_XFS_19_Office_Trailers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA489719QA006 AM #3
Office Trailer Rental – Exercise Forging Sabre
The following are responses to industry submitted questions:
Q1: Does power/communication cables need to be ran through floor or dropped from ceiling?
A1: Power/communication cables need to be ran through floor with floor boxes for outlets/connections.
Q2: HVAC possibly may not be adequate for number of people estimated in each room. Will HVAC system need to be upgraded?
A2: No, standard HVAC system provided will be adequate.
Q3: What is purpose for televisions?
A3: Televisions will be display for computers. Cables will be ran to location indicated on specification Sheet.
Q4: Will SO Cables be permanent or temporary?
A4: Temporary.
Q5: Will power cables be protected from vehicle traffic?
A5: Yes, vehicle traffic will be blocked from driving on power cables.
Q6: Will digging permits be required and will they be required for each trailer?
A6: Yes, digging permits will be required for each trailer (grounding/tie down). Digging permits need at least two (2) weeks prior notification and are good for two (2) weeks.
Q7: Will generator be provided or is it contractor responsibility, and will it require hardwire, or plug in?
A7: Generator will be provided. Hardwire or plug in has not been determined at this time.
Q8: How will cables be labeled?
A8: Cat 6 cable labeling can be labeled in a logical manner, such as A-1 through A-24, B-1 to B- 24 associating to the patch panel in the server room.
Q8: How close are buildings?
A9: Buildings that will be colocated will be at least 10 feet apart.
FA489719QA006 AM #3