78'

SHEET NOTES

COMBAT COMMAND

AIR

DEPARTMENT OF

THE AIR FORCE

U T

I L

I T

Y

S

I T

E

P

L A

N

C-1

1. WATER CUT AND CAPPED AT THIS POINT

2. CONCRETE PLUG IN SEWER LINE, NEXT TO

MANHOLE (MUST BE REMOVED IF PIPE IS USED)

3. APPROXIMATE LOCATION OF GAS LINE. CUT AND

CAPPED AT THIS LOCATION

4. ELECTRICAL CONDUIT FOR USE

5. PAD-MOUNTED TRANSFORMER AT END OF LINE IN

PARKING LOT

6. KEEP SMALL TREES IN PLACE, REMOVE ONLY IF

APPROVED BY THE GOVERNMENT. PROTECT

AGAINST ROOT DAMAGE

7. EXISTING SIDEWALKS TO REMAIN.

8. NEW SIDEWALKS (PROPOSED CONCEPT), THESE

SHALL BE DESIGNED BY CONTRACTOR PER

LANDSCAPING PLAN.

9. APPROXIMATELY 82 FT FROM ROAD (GUNFIGHTER

AVE) TO COORDINATE WITH ADJACENT BLDG'S

ALONG GUNFIGHTER.

10.SOME PARKING SPOTS WILL NEED TO BE

REMOVED IN ORDER TO MEET AT/FP CRITERIA AND

WILL BE RE-LANDSCAPED WITH SOD. MIN 78' X 58' OF

PAVEMENT MUST BE REMOVED. PROVIDE

IRRIGATION TO NEW SOD AREA.

11. ADD APPROXIMATELY180' OF CURB AND GUTTER

TO MATCH SURROUNDING CURB AND GUTTER.

12. CONTRACTOR SHALL REPAINT ANY PARKING

SPACES AFFECTED BY THE DEMOLITION. IN ORDER

FOR AREA TO REMAIN FUNCTIONAL FOR TRAFFIC.