78'
SHEET NOTES
COMBAT COMMAND
AIR
DEPARTMENT OF
THE AIR FORCE
U T
I L
I T
Y
S
I T
E
P
L A
N
C-1
1. WATER CUT AND CAPPED AT THIS POINT
2. CONCRETE PLUG IN SEWER LINE, NEXT TO
MANHOLE (MUST BE REMOVED IF PIPE IS USED)
3. APPROXIMATE LOCATION OF GAS LINE. CUT AND
CAPPED AT THIS LOCATION
4. ELECTRICAL CONDUIT FOR USE
5. PAD-MOUNTED TRANSFORMER AT END OF LINE IN
PARKING LOT
6. KEEP SMALL TREES IN PLACE, REMOVE ONLY IF
APPROVED BY THE GOVERNMENT. PROTECT
AGAINST ROOT DAMAGE
7. EXISTING SIDEWALKS TO REMAIN.
8. NEW SIDEWALKS (PROPOSED CONCEPT), THESE
SHALL BE DESIGNED BY CONTRACTOR PER
LANDSCAPING PLAN.
9. APPROXIMATELY 82 FT FROM ROAD (GUNFIGHTER
AVE) TO COORDINATE WITH ADJACENT BLDG'S
ALONG GUNFIGHTER.
10.SOME PARKING SPOTS WILL NEED TO BE
REMOVED IN ORDER TO MEET AT/FP CRITERIA AND
WILL BE RE-LANDSCAPED WITH SOD. MIN 78' X 58' OF
PAVEMENT MUST BE REMOVED. PROVIDE
IRRIGATION TO NEW SOD AREA.
11. ADD APPROXIMATELY180' OF CURB AND GUTTER
TO MATCH SURROUNDING CURB AND GUTTER.
12. CONTRACTOR SHALL REPAINT ANY PARKING
SPACES AFFECTED BY THE DEMOLITION. IN ORDER
FOR AREA TO REMAIN FUNCTIONAL FOR TRAFFIC.