Q and A FA4890-22-R-CN02 FOL BOS.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- Base Operations Support at the Forward Op Location in Curacao (FOL BOS) Federal contract opportunity
- Solicitation number
- FA4890-22-R-CN02
About this file
This final request for proposal solicits base operations support services at a forward operating location in Curacao. The contractor shall provide base operations support at the location from February 2023 through October 2027, with an option to extend services through October 2028. The support includes logistics, facilities management, fire and emergency services, transportation, and information technology services. The Air Force Southern Command will evaluate proposals by June 2023 and intends to award a contract for the base period of performance from February 2023 through October 2023 with four optional one-year extensions. Pricing shall be on a firm-fixed-price basis for most services.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions _Concerns
| FA4890-22-R-CN02 - FOL BOS - Questions and Answers | ||||
| No. | Reference (i.e. document - PWS) | Reference Text (i.e. paragraph #) | Vendor Question/Comment | Government Response: |
| 1 | PWS 4.1.7.1 and 4.1.7.1.1, Section B Pricing Sheet | RFP Language: “Contractor is responsible for procuring parts and supplies to support mission requirements that do not require CO approval.” and “Purchases approved by the CO shall be cost reimbursable. If a purchase is not approved by the CO and the contractor purchases the item(s), the Contractor will not be reimbursed for any costs associated with the purchase(s).” | DRAFT RFP Question: In the Section B Pricing Sheet, CLINS X001 through X003 and X008 through X012 are priced using labor only. And CLIN X007 is a plugged figure, there doesn’t seem to be a place in the Excel pricing sheet to price any ODC unrelated to lodging CLIN X006 and Contractor Furnished Vehicles CLIN X004. |
PWS 4.1.7.1 defines certain costs that do not require CO approval and that includes most items under the micro-purchase threshold. Section 4.1.7.1.1 indicates any item not approved by the CO won’t be reimbursed, which would indicate anything under the micro-purchase threshold that contractors purchase won’t be reimbursed unless the CO approves.
| Is it the intent for contractors to assume that the CO will approve all reimbursable items under the micro-purchase threshold and these costs are covered in the CLIN X007 plug? Or should contractors assume a certain level of reimbursable micro-purchases within the fully burdened labor pricing of CLINS X001-X003 and X008-X012 for parts/supplies/services? | PWS Para 4.1.7.1 was updated in the final RFP to provide clarity that: "If a purchase is above the micro-purchase threshold (or any values for d. and i. below) and is not coordinated and approved by the CO, the Contractor will not be reimbursed for any costs associated with the purchase(s)." So as long as a cost is allowable and under the contractor's threshold, (or properly approved by the CO if above the threshold), then the costs will be reimbursed. | ||||
| 2 | Section B Pricing Sheet, ODCs Tab | DRAFT RFP Question: Does the CLIN 0007 Service/Parts/Freight/Travel/Utilities plug cover all reimbursable parts and services required for this contract? Should contractors price any parts/services for work related to CLINs 1-3 and 8-12 within those FBLRs? | A majority of parts and services required to perform PWS requirements will fall under CLIN X007 (e.g centrally managed PPE, material, and parts). All labor and incidental expenses such as uniforms and personally issued PPE should be included in overhead. | ||
| 3 | Section B Pricing Sheet and RFP Section L-9.2.2 | The proposal’s pricing narrative shall break out the fully burdened labor rates, (including direct labor rates and all indirect rates, e.g., G&A, overhead, fringe, profit/fee, etc.) for each labor category proposed to accomplish the work described in the PWS. | DRAFT RFP Question: Section L-9.2.2 requires pricing labor only on the FFP CLINs, and the pricing Excel sheet for FFP CLINs X001-X003 and X008-X012 only seems to allow labor pricing. Does the Government expect any non-labor related cost priced within these CLINs? For instance, any parts or services related to work done in these CLINs. | For the referenced CLINs; a majority of parts and services required to perform PWS requirements will fall under CLIN X007 (e.g centrally managed PPE, material, and parts). The only non-labor costs for these CLINs is considered minor and incidental expenses such as uniforms and personally issued PPE which should be included in overhead. | |
| 4 | L-2.1, SECTION L, APPENDIX 4 Q&A Form | Any formal communication or questions such as requests for clarification, and information concerning this solicitation should be submitted in writing (utilizing the template provided) via e-mail to all POCs listed below no later than 12:00 PM EST on 31 May 2022. Questions will be considered at any time prior to, during or after the site visit up to the deadline above; however, official answers will be provided to written questions only. | DRAFT RFP Question: We are not able to access the Q&A template on page 22 of section L. Will the government resend or reattach the template so that we can submit any further questions in the template as instructed? | The Q&A document was added to the Final RFP SAM.Gov Posting. | |
| 5 | Draft Section L-8.1.2 Past Performance Information (PPI) |
Draft Section M.3.2.1 Recency L-8.1.2 Past Performance Information (PPI) and Draft Section M.3.2.2 Recency both require each relevant contract shall have a minimum of six (6) months of active performance within four (4) years preceding the FOL-BOS final solicitation issuance date. DRAFT RFP Questions:
Q1: Would the Government clarify its intent? Is its the Governments intent that bidders shall provide contract past performance examples that have at least 6 months of active performance to measure performance?
Q2: The current construct of the M.3.2.1 effectively creates a 3.5 year recency requirement rather than the stated 4, due to the additional requirement for 6 months of performance within the 4 year period, (i.e., a contract ending 3 years and 10 months ago which would qualify under the 4 year requirement but would fail to meet the 6 month performance requirement within the 4 year period - only two months within 4 year period). As such, would the Government consider striking the reference to "within four (4) years"? Q1: Yes, each PPI reference shall have (minimum of six (6) months) performance that was/were performed during the last four (4) years preceding the FOL-BOS final solicitation issuance date.
Q2: No change to this requirement as written. The requirement is for (6) months performance that was/were performed during the last four (4) years.
6 Draft Section L-8.1.2 Past Performance Information (PPI)
Draft Section M.3.2.2 Relevancy
| Draft Section M.3.2.3 Performance Confidence Assessment | L-8.1.2 Past Performance Information (PPI), M.3.2.2 Relevancy, and M.3,2,3 Performance Confidence Assessment. Requires each offeror to submit a minimum of two (2) and a maximum of five (5) contract references (CR); at least two (2) of the references provided shall be on the Offeror (Prime Contractor), if available. Draft Sections L and M did not provide examples of how PPIs would be scored or how the Contractor Performance Assessment Reports (CPAR) scores would factor into the PPI scores. However, if the process employed in the award of the existing Curacao BOS contract is a guide, then numeric values were assigned to the adjectival ratings described in section M.3.2.2 for each CR and the CPAR rating for each contract year was averaged and added to the adjectival ratings for each CR for a total score. The total scores for each CR were then totaled minus any Government subtracted points for the Offerors PPI score. It is important to note that all Offerors competing for the existing contract were each required to submit three (3) CRs | DRAFT RFP Question: Since the DRAFT RFP requires the Offerors to submit a minimum of two (2) and maximum of five (5) CRs ,will the Government consider averaging the total scores for each CR to arrive at the Offeror PPI score instead of totaling the total scores for each CR? To do otherwise, will require all Offerors to provide five (5) CRs since the total of 5 will always beat the total of 2. If not, what is the Governments process for scoring past performance? | Individual PPIs will not be scored, Recency determination is recent/not recent; and the Relevancy determination will utilize M-3.2.2 Table 5. Per M-3.2: "The performance confidence assessment will be assessed at an overall factor level..." | ||
| 7 | Draft Section L-8.1.2 Past Performance Information (PPI) | ||||
| Draft Section M.3.2.1 Recency | L-8.1.2 Past Performance Information (PPI). and Draft Section M.3.2.2 Recency both require each relevant contract shall have a minimum of six (6) months of active performance within four (4) years preceding the FOL-BOS final solicitation issuance date. | DRAFT RFP Question: Would the Government consider using a five (5) year recency standard which is more common rather than four (4) years. This change would not prejudice any Offeror and instead would encourage broader competion. | The evaluation criteria were carefully crafted to ensure the the Government was evaluating offerors with recent and relevant past performance. No change. | ||
| 8 | Draft Section L, paragraph L-7.4.1.2(viii) | The referenced section directs Bidders to, "Identify overall fleet (GPV/SPV) and (CFV) as prescribed in PWS para 4.1, utilizing GFE and CFE listings at Tab 2 - Government Vehicles and Tab 3 - CTR Vehicles in Appendix K." | DRAFT RFP Question: These instructions imply that Appendix K is to be somehow be included in the Technical Volume (Volume I). Is this the Government's intent? If so, provide direction where Appendix K is to be included in the Technical Volume and confirm the Appendix K is excluded from the volume's 15-page limit. | The intent of this section is to confirm that the bidder's transition plan for vehicle support is sound and logical and can be accomplished in the 60-day transition period. The annotated Appendix K will be included at the end of your technical volume and will not be included in your page count. | |
| 9 | Draft Section M, paragraph M-3.1.2 SUBFACTOR 2: Technical Understanding | This paragraph indicates that Subfactor 2 consists of (A) Communications Support, (B) Airfield Services and Management, and (C) Fire and Emergency Services. | DRAFT RFP Question: Can the Government confirm if the inclusion of Fire and Emergency Services is correct, or should this be replaced by Civil Engineering Mission Support as reflected in M-3.1.2.3? | Corrected between Draft and Final RFP to Civil Engineering Mission Support in M-3.1.2.3. | |
| 10 | Draft PWS, paragraph 6.0 | N/A | DRAFT RFP Question: Does the Government intend to exercise any of the options at the time of contract award? | The Government is not able to share this information at this time. | |
| 11 | SAM.GOV Related Notice dated 5/13/2022 | Section D will not be included in this solicitation as it is not applicable to this requirement. | DRAFT RFP Question: Will the Government please advise in which section it intends to address transition and provide a plug number for it in pricing template to level the playing field for competition? | Transition is unpriced. | |
| 12 | General | N/A | DRAFT RFP Question: Given the Pentagon's March 7, 2022 announcement that a new strategy to bring in small businesses is coming soon, would the Government consider including a 25-30% small business participation requirement for this work? | The Government welcomes small business participation, however, there is no minimum requirement. | |
| 13 | 4.3.1.2.1 FOL Support AEF Lodging | Provide nine hotel or apartment rooms with two full size beds… | DRAFT RFP Question: Does the Government require two full sized beds per hotel room or appartment (i.e., double occupancy hotel room with two beds within one room and a shared bath with no kitchen)? Or, is the intent to provide a private room and bathroom for each occupant? | The Government's requirement is as written; to provide as a minimum; two full-sized beds in a hotel room or apartment. It is permissible, but not a requirement, to provide a private room and bathroom for each occupant. | |
| 14 | General | N/A | DRAFT RFP Question: Is this a new requirement? | No | |
| 15 | General | N/A | DRAFT RFP Question: If not, could the government please provide the incumbent contract number, award value, and period of performance? | Contract Number: FA489016D0007-FA489017F3053, |
Award Value: $80,093,875.46 PoP: 11/01/2017-10/31/2022
| 16 | Section L-5.4.1 | Page Format | Do to the page count limitation on Volume 1 - Technical, is it possible to reduce the type size for text to be Times New Roman 10-point font? | No, the type size for text will remain as Times New Roman 12-point font. |
| 17 | Section L-5.4.5 | Organizataion/Page Limit | Volume I - Technical is page limited to 15 pages, with the requirement to address will the government consider increases the page count to 30? | No, offerors are encouraged to be as thorough but succinct as possible in the proposal. The page limit for Volume I - Technical is limited to 15 pages. |
| 18 | Section L-8.1 | Section L-8.1d and 8.1.2.1 indicate the PPI is limited to 3 pages for each contract reference. However, 8.1.2.1.3 says to limit the summary to 1 page. | It is unclear what part of the 3 pages is limited to 1 page. Is this to indicate the B (V.) section of the PPI template is limited to 1 page? | Section L-8.1.2.1.3 has been updated to remove the one (1) page limitation, as this falls within the 3 page limit for each PPI Reference (utilize Section L Appendix 3 - PPI Template). |
The intended structure of the Past Performance Volume is as follows:
| a. | Table of Contents (limited to one (1) page) |
| b. | Glossary (NO PAGE LIMIT) |
| c. | Past performance Summary: (Limited to two (2) pages for an overview summarizing all PPIs), and limited to two (2) pages for Organizational Structure change history. |
| d. | Past Performance Information References; (two (2) to five (5) references in the format provided in Section L Appendix 3. (Limit three (3) pages per past performance example.) Potentially six (6) pages to 15 pages. |
Based on the tables in Section L Appendix 3, Offerors will now have roughly 2 pages for the PPI summary within each PPI, which are limited to 3 pages each.
| 19 | PPI Template | Paregraph C says to provide current information on all three individuals for Government contracts. | Some contracts do not have all three contacts available especially for completed contracts. Will the Government change this to at least 1 POC? | In cases where there is not a Point of Contract for the referenced position, the Contractor may leave the table blank. | |
| 20 | L-8.1.1 | L-8.1.1 Past Performance Summary | |||
| “The offeror shall include a copy of the Teaming Arrangement (not included in the page limit) and a summary detailing each member’s areas of responsibilities as it relates to the work to be accomplished, the percentage of work to be performed by each partner, company relationships, and how communications will be conducted with government personnel.” | Is it the intent of the Government for the Offeror to submit copies of Teaming Arrangements for subcontractors that the Offeror does not intend to submit past performance information on? | A copy of the Teaming Arrangement (not included in the page limit) should be submitted for all proposed teaming arrangements, partner arrangements, or joint ventures regardless of whether past performance will be used from each. A Subcontractor/Teaming Partner Consent Letter is required for those teammates for which you are submitting PPIs. | |||
| 21 | PWS 1.3.1 | If Option A for a fire department is not exercised, this would be removed. The same applies to Appendix E for support agreements with the mutual support agreement for our fire department to support the Hato Airport fire department. | Would notification be provided by the USG to the Hato stakeholders 6 months out per the MSA? | Any notifications are not the BOS contractor's responsibility and will be accomplished by the appropriate USG representative at the appropriate time. | |
| 22 | PWS 2.16 | Establish and maintain a FOIA program IAW DODM 5400.07. | 5400.7-R was replaced by DODM 5400.07, and chapter 4 in the new document contains inherently Government Functions. Which FOIA program requirements apply to FOLBOS? | PWS corrected. | |
| 23 | PWS 4.1.1 | Manage the aviation fuels account IAW DoD 4140.25 M, Defense Logistics Agency-Energy (DLA-Energy) Policy/Procedures. | Is this requirement only in effect if option C - Fuels Management is in exercised? | Yes, this requirement is only in effect if option C exercised. | |
| 24 | PWS 4.1.2.3 | Provide and maintain U-Drive-It vehicles that meet requirements, listed in Appendix K and Appendix L, to government personnel assigned/TDY to the FOLs to support specified requirements IAW AFI 24-301. | Is the U-Drive-It fleet vehicle requirement also to support MWR activities for TDY/Assigned personnel? | The fleet requirement supports all aspects of the activities of the TDY and Assigned personnel. | |
| 25 | PWS 4.1.6.4 | Manage all government furnished Plant Equipment by utilizing a life cycle approach...Review and recommend replacement for each item reaching its life cycle within 1 Oct through 30 Sept of the following year IAW CDRL A014 (Equipment Life Cycle Report). | The 1423-1 for A014 doesn't appear to match the provided attachment in Appx B. Will the Government provide the applicable historical data listed on the 1423-1 to generate report? | PWS Appendix B CDRL A014 has been updated. | |
| 26 | PWS 4.1.6.5 | Replacement of Government furnished special and general purpose vehicles identified in Appendix K to support FOL operations will be replaced with contractor acquired/leased equipment as needed when directed by the CO. | Does the Government anticipate to direct replacement of any of the 48 vehicles listed in Appx K, Attch 3 during the period of performance? | At this time there is not a forecasted replacement plan. | |
| 27 | Appx L 1.0 | The attached represent the government’s requirement for CFVs which will support site requirements; | It is the minimum requirement but can be increased by the USG. Is any increase at Government expense? | Yes, any Government-directed increase to this requirement after contract award would be negotiated on a Firm Fixed Price basis under CLIN X004. | |
| 28 | PWS 4.1.7.1 (b) | Morale, Welfare, and Recreation equipment/supplies greater than the micro-purchase threshold | The Bidder visit itinerary explained that the MWR Office (Building 700 Tour) is a 429 requirement. Is the 429 EOS responsible for determining which new/replacement equipment is purchased and the contractor acts as the procurement agent? | The contractor will be responsible for procuring any equipment specified/required by the Government. | |
| 29 | PWS 4.1.8.2 | The Contractor shall be prepared to support disposition of all excess property from Optional CLINS that are not awarded during the base year of the contract. | Will the Government direct the disposal action and identify the excess property? | Yes. | |
| 30 | PWS 4.3.1.2.3 | Hand held fire extinguishers are provided | Are these cost reimbursable items? | Yes | |
| 31 | PWS 4.4.1.1 | The Custodian of Postal Effects (COPE), Postal Clerk and Postmaster from the APO shall attend government directed training if applicable OR when required. | Are all three of these positions contractor function requirements? | PWS Para 4.4.1.1. has been updated to clarify "The postal clerk position is a member of the 429th EOS who, as an active duty member, will support official mail and any mail claims." | |
| 32 | PWS 4.4.1.1 | A Postmaster shall be responsible for overall management of the APO IAW DoD 4525.6-M and United States Postal Service (USPS) publications. | Is the APO service on site extended to DOS personnel? | Yes | |
| 33 | PWS 1.3 | The Contractor is encouraged to use the latest technology, innovations, and commercial practices to keep Government assets in serviceable condition as determined by the Government. | Will the gov reduce AFIs to allow for use of commercial best practices? | During performance, the contractor may present innovations which the Government may approve on a case by case basis. | |
| 34 | PWS 2.22.1.1. | Contractor will respond to all hazardous materials’ spills IAW their approved Spill Prevention, Control and Countermeasures (SPCC) Plan which is part of the A003 EPP. This includes expeditiously placing spill containment covers over any effected drainage grates on the aircraft parking ramp. Notify the FOL/CC and CO of all pollution incidents IAW CDRL A005. | Will the government provide workload data for spills? | During the current contract there have been 10 reports of small spills around the site, all of them cleaned up with the available spill kits. There were 4 reports in FY18, 4 in FY19, 1 in FY20, and 1 in FY21. | |
| 35 | PWS 4.1.2.1. - Workload data? | Provide 24/7 transportation support for mission-required personnel and aircrew to and from aircraft, work centers, and lodging, with pickup NLT 30 minutes after request. Off-site transportation requests that exceed the 30 minute pickup time may be adjusted with an agreed upon time by the requester and Contractor. | Will the government provide workload data for ground transportation requirements? | Ground transportation requirements will be based on mission tasking which are highly variable based upon OPTEMPO. As a result past taskings are not a valid indicator. | |
| 36 | PWS 4.1.2.9. - Workload data? | Rent or lease Special Purpose/General Purpose vehicles on a short-term basis to support mission requirements. It is the Contractor’s responsibility to provide rental equipment/vehicles to support the firm-fixed price actions of the contract. Obtain CO approval prior to initiating rental or leasing actions. | Will the government provide workload data for rental and leasing requirements? | PWS Para 4.1.2.9 has been updated. "Obtain approval prior to initiating rental or leasing actions on a cost reimbursable basis." | |
| 37 | PWS 5.2 Security Clearances Requirement | States that "All personnel performing on this PWS shall be U.S. Citizen or local national and shall have at least a favorably completed and adjudicated by the CO." | As included in the reference text the requirement is incomplete. Can the Government state what must be favorably completed? | PWS para 5.2. has been updated to "All personnel performing on this PWS shall be U.S. Citizen or local national and shall have at least a favorably completed background check." | |
| 38 | PWS 5.2 Security Clearances Requirement | States that "All personnel performing on this PWS shall be U.S. Citizen or local national …" | Will the Government also consider the use of qualified, English speaking third country nationals? | PWS SECTION D, Para 2.2 has been revised to include: "Third country nationals are permitted to work on the FOL, if they meet all PWS requirements and local labor laws." | |
| 39 | PWS 6.1.1.5.1. U.S. Nationals | Driver-Operators (D-O) who have satisfied the USAF requirements for driving/operating fire fighting vehicles and possess a current i.e., not expired, driver’s license from a U.S. state will be issued an AF Form 2293, US Air Force Motor Vehicle Operator Identification Card. | Will the Government also consider accepting international drivers licenses in lieu of U.S. driver’s license? | Please see revised PWS Para 6.1.1.5.1.states, "Contractor employees assigned to operate either government owned or leased equipment in performance of their contract shall be certified by the contractor and at the contractor’s expense as being fully qualified to operate the vehicles and/or equipment to which they are assigned. The prime contractor shall document all operator qualifications. This documentation shall be provided to the administrative contracting officer before any contract employee engages in any mode of equipment operation." | |
| 40 | PWS 6.2.8.1. Satellite Communications (SATCOM) for Tactical Data Link (TADIL) System Mission C4I Support | Section 6.2.8.1. refers to the USAF CD Radar Program support contractor. | Can the Government provide the name of the USAF CD Radar Program support contractor? | The USAF CD Radar Program support contractor is PAE. | |
| 41 | General | N/A | We are aware that 7 members of the current FOL staff reside at a separate facility on a different contract. It is a year-to-year lease for a 5 year POP. Further, it may be terminated with 6 months notice. It is possible to terminate the lease to coincide with the award of this contract. |
| Will the Government consider bringing these lodging requirements for the 7 FOL staff members under this new contract to achieve savings through economies of scale and management efficiencies? | No, this requirement is different from the lodging requirements in the PWS and will remain separate at this time. | |||
| 42 | PWS 4.3.1.2 TDY Transient Personnel Lodging | At the direction of the Contracting Officer, this coordination will include paying for the room reservations to be reimbursed using CLIN X007. | As this requirement is intended for larger unit mission deployments, the reservation cost could be in excess of $1M for a short-term deployment at per-diem. |
Will the Government allow for immediate invoicing?
| Additionally, in the event of cancellation, will penalties also be cost reimbursable in the even the contractor pre-paid? | The requirement outlined in PWS 4.3.1.2 TDY Transient Personnel Lodging is cost reimbursable. The invoice payments made under CLIN X007 will occur on a monthly basis. In the event of a cancellation, the associated cost will be cost reimbursable. The Government will consider immediate invoicing on a case-by-case basis. Any penalties will also be cost reimbursable. | ||||
| 43 | PWS 4.3.1.2.1 FOL Support AEF Lodging | Provide nine hotel or apartment rooms with two full size beds at Curacao for AEF personnel. | It is common for hotel rooms to have two beds with a shared bath. Is it the Government's intent to house 2 AEF personnel in a hotel room with 2 beds and 1 shared bath for the duration of their assignment? | This approach will meet the requirement. | |
| 44 | PWS 4.3.1.2.1 FOL Support AEF Lodging | Provide nine hotel or apartment rooms with two full size beds at Curacao for AEF personnel. | It is not common for multi-bed room apartments to have 2 beds. Is it the Government's intent to house 2 AEF personnel in an apartment room for the duration of their assignment? If so, Offerors could accommodate up to 36 AEF personnel in 9 two-bedroom apartment. | PWS Para 4.3.1.2.1 has been updated. "Provide lodging for 24 AEF personnel in a minimum of twelve (12) hotel rooms or apartments with a full size bed per person, no more than two (2) personnel per room and no more than two (2) personnel sharing a bathroom." | |
| 45 | PWS 4.3.1.2.2 Furnishings | It is required to have one safe per bedroom. | Is it the Government's intent that the AEF personnel share the 1 safe per bedroom? | Yes | |
| 46 | PWS 6.2 (Option B) C4I Systems | General | For all equipment sustainment actions, how are new additions/requirements (not replacement action) that occur during the PoP handled? |
| Will this be negotiated separately for engineering, installation, configuration, and sustainment? Or, is it the Government's intent that the 612 TOG, Det. 2 military C4I personnel will perform and sustain new or additional systems? | It is the Government's intent that the 612 TOG, Det. 2 military C4I personnel with reach back support will perform and sustain new additions/requirements. | |||
| 47 | PWS 6.2 (Option B) C4I Systems | WOMS is listed as a DoD System in Section A/2.8. | Can the Government clarify who is responsible for using WOMS for new or additional equipment? |
| Does the USAF process WOMS/CIPS requests or the Contractor? | PWS Para 2.8 has been updated to remove reference to WOMS. USAF personnel is responsible for using WOMS. | |||
| 48 | PWS 6.2.1. C4I Systems and Support | Provide personnel, materials, and other services necessary to operate, maintain, and repair C4I and automated information systems and services as described, and under the direction and guidance of 612 TOG, Det. 2 military C4I personnel. | Can the Government clarify if this is a personal services contract? |
Will the contractor be relieved of PWS 2.2.2. Site Management responsibilities and accountability for this contract scope?
Alternatively, would the Government consider clarifying the language to avoid having to receive "direction and guidance" from someone other than the COR/CO? This is not a Personal Services Contract.
Contractor is responsible for site management of all personnel.
PWS Para 6.2.1. has been revised to remove the word "direction."
| 49 | PWS 6.2.14.2. REMEDY Services Management Suite | REMEDY tickets must be open in the day the issue was found unless on weekend or holiday and the ticket is not a Red ticket the ticket can be open the next business day. | Can the Government specify what constitutes a "red" ticket? | Red ticket is a status update tag to reflect non-mission capable status. |
| 50 | Section B - Pricing Sheet, CLIN 0004 | N/A | Contractor Furnished Equipment "Unit" is now "Month". Will the Government consider changing to "Lot" instead of "Month"? | DFARS PGI 204.7103(d) which states, " In structuring line items, especially on fixed-price contracts, due consideration shall be given to the effect of the chosen units of measure on administration and payment. No contract line item shall contain a quantity less than the number of deliveries anticipated on the line item." For CLIN X004 performance will be reviewed and payment will be made on a monthly basis. |
| 51 | L-5.4.1 | Type size for text shall not be smaller than Microsoft Word Times New Roman 12-point font, single column, normal proportional spacing and one-inch (1”) margins (top, bottom, left and right). | Can the Government confirm Times New Roman, 10-point font is acceptable for Section L, Appendix 3 Past and Present Performance Information (PPI) Sheet? | The Section L Appendix 3 template has been updated to 12-point font. |
| 52 | L-8.1.2.1.3 |
L-8.1 For each cited past performance reference, describe the nature or portion of work performed. Further, estimate the percentage of the total effort performed. Limit the summary information to one (1) page. Submit a separate PPI input for each reference.
| Past Performance Information (PPI) References: Not to exceed three (3) pages each. | Section L instructions state limit the summary information to one (1) page. Can the Government confirm L-8.1.2.1.3 is part of the Section L, Appendix 3 PPI Sheet and the referenced 1 page limit does not apply? | Section L-8.1.2.1.3 has been updated to remove the one (1) page limitation, as this PPI Summary falls within the 3 page limit for each PPI Sheet (utilize Section L Appendix 3 - PPI Template). | |||
| 53 | Section L | L-9.1: The sixty (60) days allotted for transition shall be unpriced. | The Technical Proposal requires Offerors to provide an organization for transition, thereby incurring costs; however, Section L states that transition shall be unpriced. Would the Government consider adding a plug or a transition CLIN that is not a part of the Total Evaluated Price to ensure a level playing field among all bidders? | This is an unpriced time permitted for transition activities prior to contract start on 01 Feb 2023. Any costs incurred by the awardee during this time should be accounted for in overhead. | |
| 54 | Section L | L-9.1: The sixty (60) days allotted for transition shall be unpriced. | |||
| And L-7.2: Transition Plan - Not Separately Priced | In execution, will the winning offeror negotiate a transition CLIN to be added to the contract for transition costs? | No, This is an unpriced time permitted for transition activities prior to contract start on 01 Feb 2023. Any costs incurred by the awardee during this time should be accounted for in overhead. | |||
| 55 | Section B Pricing Spreadsheet | Where do offerors include transition costs in the given pricing model? | This is an unpriced time permitted for transition activities prior to contract start on 01 Feb 2023. Any costs incurred by the awardee during this time should be accounted for in overhead. | ||
| 56 | Appendix L - FOL BOS Contractor Furnished Vehicles | Intend to Utilize? Insert 1 or 0 | Column L indicates a required response. What section of the proposal would this file be inserted? If offerors indicate 1 in the file what does that entail for the pricing/proposal response? | A reference has been added under Section L-5.4.3 Pages Not Included in the Page Count, this information must be populated in the excel sheet embedded within PWS Appendix L, Column L. Please see updated Section L Para 7.4.1.2 viii. "1" indicates contractor furnished vehicles that you intend to retain or replace to support your technical approach. | |
| 57 | Appendix L - FOL BOS Contractor Furnished Vehicles | Are all vehicles listed currently in good working order? Can the government provide a mechanical status of each vehicle? | Bidders should assume the equipment is in good working order and meets USG sustainment standards. | ||
| 58 | Appendix L - FOL BOS Contractor Furnished Vehicles | Can the government please provide the current mileage of the vehicles listed (as applicable)? | Bidders should assume the equipment is in good working order and meets USG sustainment standards. | ||
| 59 | PWS - Sec A& D | Sec A, para 3.2 | |||
| Sec D, para 3.1 | Sec A states the Customer Service Notification Center must be operated on a 24 hour, 7 day basis while Sec D states Customer Service Notification Center is a 16/7 requirement. | ||||
| Request the Government clarify the operating hours of the CSNC. | Section D has been updated to reflect 24 hour, 7 day requirement which now matches Section A. | ||||
| 60 | PWS | 4.2.1.17 Refuse collection and Disposal | It is understood that the contractor may need to establish service agreements for a variety of functions. One is refuse collection and disposal. Would the Government please confirm that the costs associated with refuse collection and disposal is cost-reimbursable? | PWS para 4.2.1.17 is cost reimbursable. | |
| 61 | General | Will the government please confirm that ground fuels for Government-Furnished vehicles and Contractor-furnished vehicles is cost reimbursable? | The expense for ground fuels is cost reimbursable. | ||
| 62 | APPENDIX K GFP/VEHICLE TECH EXHIBIT | APPENDIX K GFP/VEHICLE TECH EXHIBIT | Please provide: 1. GFE Listing (Attach 02) and 2. Gov’t Tech Exhibit for Vehicle (Attach 03) | Attachments are excel sheets embedded within Appendix K. Click the tray on the left side of the Adobe PDF, and a list of attachments will appear. | |
| 63 | APPENDIX L CFV (CPV) | APPENDIX L CFV (CPV) | Please provide missing attachment 1.1 CFV Attachment | Attachment is an excel sheet embedded within Appendix L. Click the tray on the left side of the Adobe PDF, and a list of attachments will appear. | |
| 64 | CRM | FOL BOS Technical Factor Cross-Reference Matrix | Is it USG intent to fill-in the CRM in current format/struucture - or - shall responses provide additional indentured PW paragraphs to assist with review and scoring? | The CRM is a tool to assist in the proposal preparation process... Offerors shall complete the last column with paragraph number references from their Technical Volume. Offerors may provide additional references to the other columns as deemed necessary. The cross-reference matrix will not be included in the proposal page limitation | |
| 65 | L-8.1 | c. Past Performance Summary | Not to exceed two (2) pages - Is it USG intent to limit all contract descriptions/summaries to 2 pages total - or - 2 pages for each contract summary? | See related questions above. The referenced 2 page limitation refers specifically to the OVERALL Past performance Volume Summary: (Limited to two (2) pages to summarize the entire volume up front). Individual PPIs will each include their own 1 page PPI summary embedded within Section L: Appendix 3, under Paragraph B (as outlined in L-8.1.2.1.3) which is included in the (max 3) page count of each PPI. | |
| 66 | L-8.1.2.1.3 | c. Past Performance Summary and L-8.1.2.1.3 PPI Summary | Is it USG intent to duplicate information in both c. PPS (2 page limit) and L-8.1.2.1.3 PPI Summary (3 pages each contract description) | See related questions above. The referenced 2 page limitation refers specifically to the OVERALL Past performance Summary described in L-8.1.1: (Limited to two (2) pages to summarize the entire volume up front). Individual PPIs will each include their own PPI summary (NTE 1 page IAW L-8.1.2.1.3) embedded within Section L: Appendix 3, under Paragraph B (as outlined in L-8.1.2.1.3) which is included in the page count NTE 3 pages for each PPI. | |
| 67 | L-7.4.2.1 | Aspect A: Communications Support | Please clarify "your integrated approach support C4I Services across all disciplines per PWS paragraphs". Is it USG intent for industry to assess and determine "All Disciplines", or will USG provide succinct applicable disciplines & PWS para numbers? | Offerors shall explain their approach to support C4I functions for all disciplines/departments. | |
| 68 | PWS 4.3.1.2.1 FOL Support AEF Lodging | N/A | Considering traffic/communiting times, will the Government allow hotels/resort accomodation East of the Bridge or at the extreme Western end of the island to reduce cost? | Yes, there is no restriction to the location of the lodging on the island. | |
| 69 | PWS 4.3.1.2 TDY/Transient Personnel Lodging | N/A | Can the Government clarify how seasonal hotel cost rates should be reflected in the pricing template? | PWS Para 4.3.1.2 falls under CLIN X007 and is cost reimbursable. | |
| 70 | PWS 4.3.1.2 TDY/Transient Personnel Lodging | N/A | Can the Government clarify how any applicable cancellation costs related to surge housing reservations should be invoiced? | PWS Para 4.3.1.2 falls under CLIN X007 and is cost reimbursable. | |
| 71 | General | N/A | Will the Government consider incorporating FAR 52.248-1 Value Engineering to the contract/solicitation? | No, the Government will not include FAR 52.248-1 Value Engineering into the solicitation or contract. | |
| 72 | Section_M_FA4890-22-R-CN02_FOL_BOS | M-3.3.1 | M-3.3.1 Price analysis will be conducted IAW FAR 15.404-1(b). Comparison of proposed prices received in response to this solicitation is the preferred and intended price analysis technique. If the Government cannot determine the proposed pricing to be fair & reasonable, balanced, and realistic based on competition; other than cost or pricing data may be requested. There is an expectation of competition for this requirement; |
FAR 15-404-1(b) states: Price analysis. (1) Price analysis is the process of examining and evaluating a proposed price without evaluating its separate cost elements and proposed profit.
Yet much of Section L and the Section B Pricing Sheet are written for a Cost Plus type of contract. Contractor Suggestion: Section L and Section B excel file be re-written to follow the evaluation criteria and FAR 15-404-1(b). No change to the solicitation on this topic.
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b). This detailed pricing information will help the Government conduct price realism analysis.
| 73 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.2.1 | L-9.2.1 Supporting Price Backup Data. Based on the expectation of competition, certified cost and pricing data is not required. However, Offerors shall provide support for all proposed prices to include indirect rates proposed based on Offerors accounting system and provide any applicable Forward Pricing Rate Agreements, if available. | |
| Section M states a Price Analysis iaw FAR 15-404-1(b) will be used for evaluation therefore this type of data is not applicable to this Firm Fixed Price RFP and the evaluation criteria. Contractor Question: Because this is FFP Competitive, will the Government consider eliminating backup data to include direct labor and indirect rates? | No change to the solicitation on this topic. |
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b). This detailed pricing information will help the Government conduct price realism analysis.
74 Section_L_FA4890-22-R-CN02_FOL_BOS L-9.2.2 L-9.2.2 Firm Fixed Price (FFP) CLINs. Offerors shall provide their profit rate for FFP CLINS to include the option years. The proposal’s pricing narrative shall break out the fully burdened labor rates, (including direct labor rates and all indirect rates, e.g., G&A, overhead, fringe, profit/fee, etc.) for each labor category proposed to accomplish the work described in the PWS.
In accordance with FAR 15-404-4(b)(5) The contracting officer shall not require any prospective contractor to submit breakouts or supporting rationale for its profit or fee objective but may consider it, if it is submitted voluntarily.
| Contractor Question: Will the Government consider removing the profit and indirect rates breakout iaw FAR 15-404(b)(5) and FAR 14-404-1(b)? | This FAR reference does not exist. Offerors shall provide their profit rate for FFP CLINS IAW L-9.2.2. This detailed pricing information will help the Government conduct price realism analysis. | |||
| 75 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.2.2 | L-9.2.2 A Basis of Estimate (BOE) shall be included in the narrative price volume that addresses each labor category, and each CLIN by functional area and location. | |
| Contractor Question: A BOE could very easily push the Price Narrative over the 7 page limit. Additionally a BOE should not be required IAW FAR 15-404-1(b) Price Analysis. Will the Governement consider either expanding the price narrative to 12 pages or elimitate the BOE requirement all together? | The Government believes 7 pages is adequate to convey the offeror's BOE in the pricing narrative. The pricing narrative page limit |
remains at 7 pages.
| 76 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.2.3 | The value of the indirect rates and profit proposed on the plug number will be included in the TOEP for evaluation purposes only. | |
| Contractor Question: Section M-3.3.1 states Price analysis will be conducted IAW FAR 15.404-1(b). Indirect rates are not typically part of the evaluation process associated with that FAR clause. Will the Governement consider removing this requirement? | No change to the solicitation on this topic. |
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b). This detailed pricing information will help the Government conduct price realism analysis.
| 77 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.3 | The indirect rates proposed for CLIN Series X005 and X007 shall be applied to the plug numbers and included in the TOEP for evaluation purposes only. The award value of these CLINs will be the plug number. | |
| Contractor Question: Since the award value will be the plug number, the indirect rates applied by a contractor are irrelavant. Additionally an offeror's indirect rates should not be an evaluation factor, IAW Section M, FAR 15-404-1(b). Suggest this be re-written to remove the indirect rates requirement. | No change to the solicitation on this topic. |
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b). This detailed pricing information will help the Government conduct price realism analysis.
The value of the indirect rates (and profit for X005) proposed on the plug number will be included in the TOEP for evaluation purposes only. Example: Offerors shall apply indirect rates to the $500k plug number which will yield a value for CLINs X005 exceeding $500k per year FOR TOEP/EVALUATION PURPOSES ONLY. Actual amounts billable under this CLIN will depend on the FFP values proposed for individual projects. Actual (plug number) value of CLIN 0005 will be $500k on the resulting contract.
| 78 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.4.3 | L.9.4.3 you ask offeror’s to provide a copy of their disclosure statement, however a disclosure statement by itself will exceed the seven page limit of the price narrative. Contractor Question: Suggest the requirement for the disclosure statement be removed since Section K answers the question about Disclosure Statements: "When required, the Disclosure Statement must be submitted as a part of the offeror's proposal under this solicitation unless the offeror has already submitted a Disclosure Statement disclosing the practices used in connection with the pricing of this proposal." | Provide brief statements to address each L-9.4 subsection within the L-9.2 Narrative Price Volume (7 page limit). All documents required by L-9.4 are excluded from the page limit. |
| 79 | Section_L_FA4890-22-R-CN02_FOL_BOS | L-9.4.3 | L.9.4.3 Offerors shall provide evidence of indirect rates and factors used in the price schedule have been audited/approved by DCAA/DCMA. Contractor Question: Will the Government consider removing this requirement since this is FFP with price evaluation and the ODCs on contract will be the plug amounts regardless of the indirect rates used by each offeror. Also suggest this be removed as an offeror’s indirect rates, that are submitted too and reviewed by DCAA/DCMA and recommendations provided by DCAA/DCMA, should not be an evaluation criteria. | No change to the solicitation on this topic. |
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b), and this detailed pricing information will help the Government conduct price realism analysis.
80 Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS As this is FFP and will be evaluated IAW FAR 15-404-1(b), will the Governement consider modifying the ODC tab to remove the Indirect Rates. No change to the solicitation on this topic.
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b).
81 Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS As this is FFP and will be evaluated iaw FAR 15-404-1(b), will the Governement consider modifying the Wages & Rates tab be removed as it is not applicable to a FFP with Price Analysis. No change to the solicitation on this topic.
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b).
82 Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS Section B-Pricing Sheet, FA4890-22-R-CN02, FOL BOS As this is FFP and will be evaluated iaw FAR 15-404-1(b), will the Governement consider modifying the Labor Requirements tab to remove the "Direct Labor Rate" and "Burdening Rate" columns, as it is not applicable to a FFP with Price Analysis. No change to the solicitation on this topic.
Analysis of other than certified cost and pricing data is one of several price analysis techniques available at FAR 15.404-1(b).
| 83 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2022 | 2.10.2 Computerized Maintenance Management Systems (CMMS) / 4.1.10 AGE and Vehicle Maintenance Management | The contractor's Computerized Maintenance Management System (CMMS) shall provide the Government with all vehicle and vehicular equipment work orders for the current and previous government fiscal years. Contractor Question: How will the existing historical records be made available to the contractor for upload/transfer into the contractor's Computerized Maintenance Management System (CMMS) for cradle-to-grave preventative and corrective maintenance work order tracking history on all active government-furnished vehicles and equipment? | During transition, there will be a transfer of all maintenance data from the incumbent contractor who will provide a digital copy of the data from their CMMS in a compatable format for the awardees use in populating their technical solution. |
| 84 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2022 | 2.8. DoD/USAF Systems | Will the contractor's Computerized Maintenance Management System (CMMS) be required to interface with the DoD/USAF Systems (i.e., Approved Property Systems of Record (APSR), Work Order Management System (WOMS), Integrated Maintenance Data System (IMDS), AF Equipment Management System - Asset Inventory Management (AFEMS-AIM))? | The CMMS will not interface with the DoD/USAF systems. |
| 85 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2022 | 2.11.1.3. Corrosion Control | Will the contractor be provided with equipment life-cycle history data for the severe marine environment at the BOS location? | All data to be provided is in Appendix G, Workload Data. |
| 86 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2022 | 4.1.6.5. Government Furnished Equipment to Contractor Furnished Equipment | Replacement of Government furnished special and general purpose vehicles identified in Appendix K to support FOL operations will be replaced with contractor acquired/leased equipment as needed when directed by the CO. Contractor Question: When Government provided special and general purpose vehicles reach the end of their life-cycle and are approved for replacement with Contractor acquired/leased equipment, will the Contractor be reimbursed for the cost of replacement? | Yes, the action to replace a vehicle will be reimbursed by the Government and negotiated on a case by case basis. |
| 87 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2023 | N/A | The solicitation does not include a section H that describes any special conditions. Contractor Question: Will that be provided in an ammendment? If so, will the Government extend the period to ask questions to ensure there is a clear understanding of contract terms? | There is no Section H. The Government will not be extending the period to ask questions. |
| 88 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2024 | 2.11.1.2 | Will the Government take into consideration the climate conditions in Curacao to determine the lifespan of equipment? | Yes. The Maintenance Control Plan (MCP) will take the local conditions into account for aspects of equipment care to include the projected life span. |
| 89 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2025 | 2.11.1.3 | Since the contractor is responsible for maintaining all equipment with corrosion, will the Government please provide a list of equipment that has any corrosion? | Bidders should assume the equipment is in good working order and meets USG sustainment standards. The incoming contractor will have an opportunity to document existing conditions of equipment needing additional maintenance as part of Section D, Para. 1.6. |
| 90 | PWS FA4890-22-R-CN02 FOL BOS dated 17 May 2026 | 2.11.3 | Will the Government please provide the list of active warranties? | The final list of active warranties will be provided during transition. |