Appx_D - QMS.pdf
PDF 136 KB Posted
- Attached to
- Base Operations Support at the Forward Op Location in Curacao (FOL BOS) Federal contract opportunity
- Solicitation number
- FA4890-22-R-CN02
About this file
This request for proposal constitutes the issuance of a final solicitation for base operations support services at a forward operating location in Curacao. The contractor shall provide base operations support at the location in Curacao in support of aerial counterdrug surveillance operations, mission planning, and execution for permanently assigned personnel, equipment, and facilities as well as deployed aircraft, personnel and equipment. Formal questions regarding the solicitation are due by 31 May 2022, with proposals due no later than 23 June 2022. The anticipated period of performance includes a transition period from 1 December 2022 to 31 January 2023, a base period of 1 February 2023 to 31 October 2023, and four one-year option periods running through 31 October 2027. The solicitation is issued by the United States Air Forces Southern on behalf of the United States Southern Command to provide these services at the forward operating location in Curacao.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-22-R-CN02, FOL BOS
APPENDIX D
QUALITY MANAGEMENT SYSTEM (QMS) REQUIREMENTS
D-1
1. Contract Specific QMS
The contractor shall develop, document, implement, maintain and continuously improve a comprehensive FOL- BOS contract specific QMS that assures compliance with the most current ANSI/ISO/ASQ 9001 QMS standard (currently 9001:2015) and all requirements of this PWS.
a. The QMS shall document the organizations quality management structure, personnel authority and responsibility, identify personnel designated to perform QC functions at each location (to include dedicated and additional duty personnel), and skill set for each QC representative.
b. The QMS shall incorporate a comprehensive risk management plan to include a risk matrix/table that identifies all high and moderate risks and how each will be monitored, measured and controlled. The plan shall be updated annually as a minimum.
c. The QMS shall describe the processes and procedures used to:
1. Enforce strict use of tech data. Strict use of tech data means ensuring all applicable TOs and directives are complete, current with applicable changes, available in the immediate work area, and open to applicable task/step/paragraph.
2. Establish and maintain proficiency of personnel.
3. Establish and maintain the training program.
d. The QMS shall incorporate a customer survey program. Surveys shall be available to all customers (permanent party and transient (TDY) personnel).
Results of surveys shall be available to the Government as part of the Quality Assurance/Control data available in the Management Information System.
2. Quality Management Representative
The Quality Management Representative for the FOL-BOS contract shall be an American Society for Quality Certified Quality Auditor and ISO 9001 Lead Auditor trained or equivalent by contract start. Certified Quality Auditor shall maintain the certification through the life of the contract (See Appendix M).
3. Requirements after contract award
a. The QMS to include all documentation (procedures, processes, etc.) are due to the Government 30 days after the start of the transition period. The final
FA4890-22-R-CN02, FOL BOS
APPENDIX D
QUALITY MANAGEMENT SYSTEM (QMS) REQUIREMENTS
D-2
QMS is due to the Government on the last day of the transition period. A desktop review will be accomplished by the Government.
b. The contractor’s comprehensive QMS shall be in place and performing at the performance start date, as identified in Section B and F of the contract (to include Operating Instructions, Site Operating Procedures, Work Instructions, etc. required to meet contract requirements).
c. The contractor shall notify ACC AMIC/DRQ of any changes to the QMS within two business days of implementation and provide the changed document(s) with references to the changes.
d. The contractor shall maintain and make available to the Government their measurement, analysis and improvement processes and supporting documentation. All information shall be available on the contractor’s
MIS.
e. The contractor shall be responsible for the quality of all products and/or services regardless of a validated QMS.
| 1. Contract Specific QMS |
| 2. Quality Management Representative |
| 3. Requirements after contract award |
File details come from the government source that posted it. Updated .