This briefing document outlines requirements for the Air Combat Training Systems Operations, Maintenance, and Engineering contract. Key details include that the contract will provide non-personal services including operating and maintaining airborne instrumentation systems, ground stations, electronic and computer systems supporting 14 Air Force bases and combat training centers. It will also include engineering support for radio, transceiver and network systems. The pre-brief covers workload estimates including projected quarterly sorties, required support windows and timelines for mission monitoring, replay and debriefing. A site visit to Seymour Johnson Air Force Base is outlined, including an introduction, tours of facilities and equipment, and a question and answer session. The associated federal contract opportunity provides additional context, with a description of the services sought and instruction to submit feedback on draft documents by March 9th, 2022 to inform the acquisition strategy for this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ACTS OME Site Visit - Sign-in Sheet (Completed).pdf | ||
| ACTS Site Visit Questions and Answers 7 Apr 22.pdf | ||
| ACTS CLIN Structure draft - v2 - 20220202.docx | DOCX document | |
| FA489022R0010 254 SOLICIT PKG.pdf | ||
| ACTS PWS 2021 v3.3.docx | DOCX document | |
| Solicitation FA489022R0010_ List of WDs.docx | DOCX document | |
| July 21 2019_July 16 2022 CBA_Redacted.pdf | ||
| CLSExport_FA489022R0010 Clauses (21Jan2022).pdf | ||
| ACTS 22R0010 - draft Sect LM - 20220202.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This Briefing is:
UNCLASSIFIED
Headquarters Air Combat Command
Air Combat Training Systems (ACTS) Operations, Maintenance, and Engineering
(OM&E)
Site Visit Pre-brief
Mr. Timmy Layman
HQ ACC/A3AR
Overview
• Review of ACTS
• ACTS 101
• Customers and Locations
• Review of PWS Requirements
• Major Areas of Performance
• Workload assessment (performance-based)
• Site Visit
• ROEs
• SJ PWS Specifics
• Areas/Activities to visit
• ACTS has critical primary roles in delivering an effective live OTI environment
• Operate & Maintain systems needed to gather training data
• Integrate gathered data into a consolidated training picture
• Use integrated data to support live execution of the training sortie
• Merge live data and offline data to support full re-creation of the training sortie for warfighter debrief
• ACTS has supporting roles to enable an effective live OTI environment
• Cybersecurity functions for systems, networks, and software
• Secure handling of source and aggregate data at appropriate levels
• Routine, persistent, interface with warfighters for scheduling, support, and feedback
• Program and quality management to ensure reliable and repeatable delivery of
ACTS capabilities
• Specialized support to aid technical/engineering activities and to provide critical roles (e.g., Range Training Officer)
ACTS 101
• Operations
• Airborne Instrumentation Systems (AIS) - External, Internal, and Portable systems
• Pre-Mission - Scheduling, planning, and systems prep/check-out
• Mission Execution - Live operations and training execution
• Post-Mission - Mission reconstruction, dedicated debrief, and feedback/follow-up
• Maintenance
• Pod and Ground Stations
• Electronic, Computer, and Networking Systems
• Radios, Datalink, and Remote Instrumentation Transceivers
• Engineering
• Radio and Transceiver Systems - UHF/VHF/SAT, Link-16, microwave, point-to-point
• Network - P5 network, TENA, LMON with associated cybersecurity roles/functions
• Software - ITAS product support, software integration activities
• Management
• Program Management - PM, Site Managers, PROJO,
• Quality Management - Contractor Quality Control Program
• Security Management - Security Clearances, COMSEC, Industrial Security
Major Areas of the PWS
• Performance-based contract
• Government specifies outcomes desired, not method to get there
• Main body of PWS has full requirements
• Check appendices for site-specific requirements
• Information throughout the PWS provides workload estimate basis
• Normal Operating Hours and Support Windows
• Sorties estimates, number of daily sortie ‘turns’, surge operations
• Pod loading (required or not at each site)
• Debriefing required (shared or not at each site)
• Special facilities (supported or not at each site)
• General Equipment categories (supported or not at each site)
• Detailed account/inventory of all systems, equipment, tools, etc. for each site
• Some roles/functions provide support across all sites
• PROJO - 40-hrs/week targeted at key projects across all contract sites
• Radio Engineer and Network Engineer - 40-hrs/week working engineering efforts across all sites
• Software Engineers - Sufficient support for the version releases and software
LOCs in App 8M
Performance-Based Workload Estimates
• “Typical” support windows - 10 hrs, 4 days/week or 8 hrs, 5 days/week
• Check appendices for site-specific requirements
• Mission support day components (Notional site)
• Pods checked out, driven to ramp, and loaded on aircraft before aircrew step
• Live monitoring equipment checked out and ready before flying window starts
• RTO in-place and ready to support first sortie set
• SAM Operator, TDLM, etc. in-place and ready to support first sortie set
• Mission replay file prepped immediately after first sortie set ends
• Pod cross-loads happen between sorties sets (as needed) before aircrew step
• Dedicated debrief of first sortie set happens
• RTO in-place and ready to support second sortie set
• Mission replay file prepped immediately after second sortie set ends
• Pod download/return to maintenance (as needed)
• Dedicated debrief of second sortie set happens
Support Windows
Site Visit ROEs
• Contracting Office (ACC AMIC/PKB) is the POC for all information
• Hold all official questions until the end of the Site Visit
• Use the provided Question Form to document/turn-in questions
• Any remarks, explanations, or answers to questions during the Site Visit shall not qualify the terms of the solicitation
• Do not stray from the group during the Site Visit
• Do not take any photos during the Site Visit
• Site Visit minutes/questions will be posted to SAM.gov
Site PWS Specifics
• Seymour Johnson
• Four supported squadrons (2 Ops, 2 FTUs)
• Full day of dedicated debriefing at each ops squadron
• Full day of dedicated debriefing shared between FTUs
• Visiting Aircraft and periodic exercises
• 2250 Estimated Quarterly Sorties
• Missions Supported
• Live Operations and Dedicated Debrief
• RTO, RTO - Tactics, Exercise/Battlespace Coordinator, and Tactical Data Link Mgr
• Equipment Supported
• Pods, Live Ground Stations, Post-Mission Ground Stations, Remote instrumentation
• Radio/Radio Mgt, Datalink/Datalink Mgt, Track Correlation
• Networking/Gateway
• Central Debriefing Facility (WarRoom)
• Off-Site Facilities (Equipment enclosure at Bogue)
• Off-Site Equipment (Radios, RRUs, etc.)
• Specialized Personnel Qualifications/Requirements
Areas/Activities
• 0900-0930 Introduction/ACTS OM&E Contract Site Visit Pre-brief
• 0930-1030 Tour of Seymour Johnson Pod Shop (Bldg 4501)
• Pod operations & maintenance
• Administrative/Office area
• General maintenance, tools, equipment, etc.
• Vehicles
• 1030-1130 Tour of Seymour Johnson WarRoom (Bldg 4407)
• Live operations, RTO, etc.
• Ground system equipment
• Facility
• 1130-1200 Question/Answer Session at Debden Briefing Room
• 1200 Conclusion of ACTS OM&E Contract Site Visit
Questions
File details come from the government source that posted it. Updated .