Solicitation Amendment FA489021R00120001 SF 30.pdf

PDF 574 KB Posted

Attached to
Aerial Targets III FY23
Solicitation number
FA489021R0012
Issued by

About this file

This document is an amendment to a solicitation for aircraft maintenance services. The amendment makes changes to the period of performance for several contract line items, corrects unit of measure and quantity errors, updates the performance work statement and related appendices, modifies delivery schedules, and clarifies security and evaluation criteria language. The services are for maintenance of aerial target aircraft at Tyndall AFB, FL and Holloman AFB, NM and include items such as depot-level maintenance, equipment maintenance, and mission support. The Department of the Air Force Air Combat Command is the contracting agency.

View the file

Other files

File Type Posted
conformed FA489021R0012 Amendment 0001.pdf PDF
E-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2020.txt TXT text file
F-FY19 Monthly Summary Report-Mar 2019.pdf PDF
A-FY20 Monthly Summary Report-Oct 2019.pdf PDF
FB2823-17059-0001 between 96 TW and 53 WG highlighted.pdf PDF
FY19 Flying Schedule Data.xlsx XLSX spreadsheet
E-FY20 Monthly Summary Report-Feb 2020.pdf PDF
C-FY21 Monthly Summary Report-Dec 2020.pdf PDF
B-FY19 Monthly Summary Report-Nov 2018.pdf PDF
HTSA FB4819-08102-015 WE_325 FW 2012.pdf PDF
H-FY20 Monthly Summary Report-May 2020.pdf PDF
D-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2019.txt TXT text file
G2-FY19 Monthly Summary Report-Apr 2019 v2.pdf PDF
MOA - 159CRF and 53WEG for QF16 Engine MX - Aug 21.pdf PDF
L2-FY19 Monthly Summary Report-Sept 2019 v2.pdf PDF
4. AHZA0232_Tyndall_QF-16_Wheel_Assy_SOC.pdf PDF
IMDS Job Master List Data FSAT-SSAT AGE JML 24May2021.txt TXT text file
IMDS Job Master List Data TPS-75 RADAR JML.txt TXT text file
Performance Work Statement_Amendment 0001_20Sep21.docx DOCX document
Sortie Recap FY20.xlsx XLSX spreadsheet
Workload Sppt Data RIS Sites (Pics Notes).xlsx XLSX spreadsheet
F-FY20 Monthly Summary Report-Mar 2020.pdf PDF
3. MOA JEIM 53d WEG & 183d Springfield Final.pdf PDF
FB4801-07291-0046 Support Agreement DET 1.pdf PDF
Workload Sppt Data QF-16 TCTO Status.xlsx XLSX spreadsheet
D-FY21 Monthly Summary Report-Jan 2021.pdf PDF
G-FY20 Monthly Summary Report-Apr 2020.pdf PDF
D-FY19 Monthly Summary Report-Jan 2019.pdf PDF
PWS Appendix C Pubs-Forms_Amendment 0001_20Sep21.docx DOCX document
E-FY21 Monthly Summary Report-Feb 2021.pdf PDF
J-FY20 Monthly Summary Report-Jul 2020.pdf PDF
AT-III Final RFP Questions-Answers_20Sep21.docx DOCX document
K-FY20 Monthly Summary Report-Aug 2020.pdf PDF
E-FY19 Monthly Summary Report-Feb 2019.pdf PDF
B-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2018.txt TXT text file
IMDS Job Master List Data FSAT JML 24May2021.txt TXT text file
A-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2018.txt TXT text file
IMDS Job Master List Data SSAT JML 24May2021.txt TXT text file
B-FY20 Monthly Summary Report-Nov 2019.pdf PDF
FY20 Flying Schedule Data.xlsx XLSX spreadsheet
C-FY19 Monthly Summary Report-Dec 2018.pdf PDF
A-FY19 Monthly Summary Report-Oct 2018 rev2.pdf PDF
Workload Sppt Data QF-16-only Maint Rates.xlsx XLSX spreadsheet
D-FY20 Monthly Summary Report-Jan 2020.pdf PDF
I-FY19 Monthly Summary Report-Jun 2019.pdf PDF
Workload Sppt Data AGE Periodic Inspect and Maint.xlsx XLSX spreadsheet
RIS SYSTEMS ONLY INVENTORY_SEP_2021.xlsx XLSX spreadsheet
1. QF-16 Engine Mgmt Agmt_Pass 6_FINAL.pdf PDF
C-FY20 Monthly Summary Report-Dec 2019.pdf PDF
FA489021R0012 Section M Amendment 0001 20Sep21.docx DOCX document
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to make the following changes:Block 14 (Description of Amendment/Modification):

Section B

a. to correct the Period of Performance (PoP) of CLIN 0011's Extended Description to 1 Oct 22 through 30 Sep 23;

b. to correct the PoP of CLIN 3014's Extended Description to 1 Oct 25 through 30 Sep 26;

c. to correct CLIN 4003's Unit of Issue to Lot;

d. to correct the PoP of CLIN 5011's Extended Description to 1 Oct 27 through 30 Sep 28;

e. to correct the PoP of CLIN's 6003 Extended Description to 1 Oct 28 through 30 Sep 29;

f. to correct the quantity for CLINs X006 to 240.

Section C

a. provide an updated PWS and Appendixes B, C, and G and remove Appendix I.

Section F

a. to correct the Delivery Schedule of CLIN 0011 to 1 Oct 2022 to 30 Sep 2023;

b. to correct the Delivery Schedule of CLIN 6003 to 1 Oct 2028 to 30 Sep 2029.

Section L

a. update L-1 to change security requirements for Joint Ventures;

b. update L-3.9 to remove the subcontractor written consent requirement from the page count for the Past Performance Volume;

c. update L-4.5 to clarify that pricing information shall not be included in any other factor volume.

Section M

a. update M-3 to better clarify what an acceptable/unacceptable rating would require.

Contracting Officer: elijah.horner.3@us.af.mil Contract Manager: carla.ashby.1@us.af.mil

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Quantity 20 240

INFORMATION FROM TO

Description

OVERTIME

Cost No Fee fully burdened labor nonpersonal services for FSAT maintenance, SSAT maintenance and RIS.

Government pre-approval is required prior to incurring effort. Overtime invoices must be itemized by labor category(ies) and hour(s) worked for all skill sets. Rates shall not exceed the terms and conditions outlined in the CBAs. Period of Performance is 1 Oct 23 through 30 Sep

24. Estimated Cost is $180,000.00.

OVERTIME

Cost No Fee fully burdened labor nonpersonal services for FSAT maintenance, SSAT maintenance and RIS.

Government pre-approval is required prior to incurring effort. Overtime invoices must be itemized by labor category(ies) and hour(s) worked for all skill sets. Rates shall not exceed the terms and conditions outlined in the CBAs. Period of Performance is 1 Oct 22 through 30 Sep

23. Estimated Cost is $180,000.00.

Option Line Item 1006

INFORMATION FROM TO

Quantity 20 240

Option Line Item 2006

INFORMATION FROM TO

Quantity 20 240

FA489021R00120001

Option Line Item 3006

INFORMATION FROM TO

Quantity 20 240

Option Line Item 3014

INFORMATION FROM TO

Description

DEPLOYMENTS AND OFF-STATION ACTIVITIES

Cost No Fee nonpersonal services to include, but not limited to, fully burdened overtime labor, cargo shipments, travel, and materials required for off-station deployments and redeployments to meet the requirements of the PWS. Period of Performance is 1 Oct 25 through 30 Sep 25. Estimated Cost is $1,040,000.00.

G&A (excluding Overtime): _____%

DEPLOYMENTS AND OFF-STATION ACTIVITIES

Cost No Fee nonpersonal services to include, but not limited to, fully burdened overtime labor, cargo shipments, travel, and materials required for off-station deployments and redeployments to meet the requirements of the PWS. Period of Performance is 1 Oct 25 through 30 Sep 26. Estimated Cost is $1,040,000.00.

G&A (excluding Overtime): _____%

Option Line Item 4003

INFORMATION FROM TO

Unit of Measure Months Lot

Option Line Item 4006

INFORMATION FROM TO

Quantity 20 240

Option Line Item 5006

INFORMATION FROM TO

Quantity 20 240

Option Line Item 5011

INFORMATION FROM TO

Description

OVERTIME

Cost No Fee fully burdened labor nonpersonal services for FSAT maintenance, SSAT maintenance and RIS.

Government pre-approval is required prior to incurring effort. Overtime invoices must be itemized by labor category(ies) and hour(s) worked for all skill sets. Rates shall not exceed the terms and conditions outlined in the CBAs. Period of Performance is 1 Oct 27 through 30 Sep

29. Estimated Cost is $180,000.00.

OVERTIME

Cost No Fee fully burdened labor nonpersonal services for FSAT maintenance, SSAT maintenance and RIS.

Government pre-approval is required prior to incurring effort. Overtime invoices must be itemized by labor category(ies) and hour(s) worked for all skill sets. Rates shall not exceed the terms and conditions outlined in the CBAs. Period of Performance is 1 Oct 27 through 30 Sep

28. Estimated Cost is $180,000.00.

Option Line Item 6003

INFORMATION FROM TO

Description

TAFB SSAT MAINTENANCE

Firm Fixed Price (FFP) nonpersonal services: All SSAT maintenance and labor related services for the baseline requirements stated in the PWS to include, but not limited to, all personnel, supervision, materials and incidentals such as office and janitorial supplies and general purpose tools, and other items and services necessary for program management, aircraft and equipment maintenance, AGE maintenance, sortie production, fleet management, ground operations, and mission support at TAFB and deployed locations. Period of Performance is 1 Oct 29 through 31 Mar 30. Monthly unit price is $____________________.00.

TAFB SSAT MAINTENANCE

Firm Fixed Price (FFP) nonpersonal services: All SSAT maintenance and labor related services for the baseline requirements stated in the PWS to include, but not limited to, all personnel, supervision, materials and incidentals such as office and janitorial supplies and general purpose tools, and other items and services necessary for program management, aircraft and equipment maintenance, AGE maintenance, sortie production, fleet management, ground operations, and mission support at TAFB and deployed locations. Period of Performance is 1 Oct 28 through 30 Sep 29. Monthly unit price is $____________________.00.

Option Line Item 6006

INFORMATION FROM TO

Quantity 20 240

Section C - Specification/SOW/SOO/ORD

Miscellaneous text in this section has been modified to:

See attached file for Section C - Aerial Target (AT) Performance Work Statement (PWS)_Amendment 0001_20Sep21 PWS Appendix A - Definitions PWS Appendix B - CDRL List_Amendment 0001_20Sep21 PWS Appendix C - Pubs-Form_Amendment 0001_20Sep21 PWS Appendix D - GFE PWS Appendix E - GFF PWS Appendix F - List of Illustrations PWS Appendix G - GFV_Amendment 0001_20Sep21 PWS Appendix H Workforce Min Quals

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Period of Performance 01 Oct 2023 to 30 Sep 2024 01 Oct 2022 to 30 Sep 2023

Option Line Item 6003

INFORMATION FROM TO

Period of Performance 01 Oct 2029 to 31 Mar 2030 01 Oct 2028 to 30 Sep 2029

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

See attached Microsoft Word document titled "FA489021R0012 Section L Amendment 0001 20Sep21".

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

See attached Microsoft Word document titled "FA489021R0012 Section M Amendment 0001 20Sep21".

IDCode:
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 22 Sep 2021
ReqNo:
ProjNo:
IssCode: FA4890
AdmCode:
IssuedBy: FA4890 HQ ACC AMIC

CP 757 225 7678

300 EXPLORATION WAY

HAMPTON, VA 23666

UNITED STATES

Carla Ashby, Email: carla.ashby.1@us.af.mil

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA489021R0012
SolDate: 11 Aug 2021
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Contracting Officer

Email: Elijah.horner.3@us.af.mil Telephone: 757-764-3307

ContDate:
CODate:

File details come from the government source that posted it. Updated .