CDRL_A011_Project_Completion_Report_(Draft_-_24_Oct_14).doc

DOC document 125 KB Posted

Attached to
War Reserve Materiels (WRM) Federal contract opportunity
Solicitation number
FA4890-15-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

CDRL A011 - Project Completion Report (Draft - 24 Oct 14)

View the file

Other files for this federal contract opportunity

Other files attached to War Reserve Materiels (WRM), newest first.
File Type Posted
FA4890-15-R-0004_Amendment_0005.doc DOC document
Industry_Questions_-_Reference_to_Amendment_2_-_20151001.xls XLS spreadsheet
Section_J _Atch_VII_-Omani_Salary_Ranges_for_Employees.xls XLS spreadsheet
WRMMS_User_Guide_(20150902).pdf PDF
Appendix_K_-_Government_Furnished_Property_(GFP)_(20150902).doc DOC document
WRMMS_Data_Element_Map_(20150902).jpg JPG image
FA4890-15-R-0004_Amendment_0002.doc DOC document
Service_Summary_(20150902).xls XLS spreadsheet
Appendix_M_-_Certifications_(20150902).docx DOCX document
Signed_Shaw_CBA_(1_Aug_15_-_31_Jul_18).pdf PDF
Performance_Work_Statement_(20150902).doc DOC document
Pre-Proposal_Conf_Attendees_-_11_Aug_2015.pdf PDF
Appendix_G_-_Level_of_Effort_(LOE)_.doc DOC document
FA4890-15-R-0004_Amendment_0001.doc DOC document
DD254__FA4890-15-R-0004_Solicitation.pdf PDF
Performance_Work_Statement_(201500715).doc DOC document
Service_Summary.xls XLS spreadsheet
Appendix_F_-_AFCENT_WRM_Award_Fee_Plan_with_Quality_Performance_Index_(1).pdf PDF
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_M_-_Certifications.doc DOC document
Appendix_H_-_Special_Requirements__for_Deployment_Support_(1).doc DOC document
Database1.mdb MDB file
Appendix_B_-_Deliverables.doc DOC document
Industry_Q A_from_Site_Visits_ _Draft_RFP_(20150609).docx DOCX document
WRM_Recompete_Synopsis.doc DOC document
NOTICE_-_WRM_Recompete_Pre-Proposal_Conference_Update.doc DOC document
WRM_Questions_and_Answers_to_Industry_-_20_Mar_15.doc DOC document
Industry_Site_Visit_Itinerary_-_6-15_Apr_2015_(REVISED).pdf PDF
WRM_Industry_Day_Questions_ _Answers_(3-5_Dec_14).pdf PDF
WRM_Industry_Day_Schedule.pdf PDF
CDRL_A014_Spill_Report_(Draft_-_24_Oct_14).doc DOC document
Appendix_C_-_Pubs_and_Forms.xls XLS spreadsheet
Performance_Work_Statement_(Draft_-_24_Oct_14).doc DOC document
CDRL_A007_Pesticide_Herbicide_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_list_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Appendix_C_-_Publications_and_Forms_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Appendix_G_-_Level_of_Effort_(Draft_-_24_Oct_14).docx DOCX document
CDRL_A015_Health_and_Safety_Plan_(Draft_-_24_Oct_14).doc DOC document
CDRL_A010_Test_and_Inpsection_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_A009-_Emergency_Response_Plan_(Draft_-_24_Oct_14).doc DOC document
Appendix_B_-_Deliverables.doc DOC document
DD_Form_254_(Draft_-_24_Oct_14).pdf PDF
ppi_tool.accdb.mdb MDB file
Appendix_J_-_Government_Furnished_Facilities_(Draft_-_24_Oct_14).doc DOC document
Performance_Work_Statement_(20150715).doc DOC document
CDRL_A008__Environmental_Protection_Plan_(Draft_-_24_Oct_14).doc DOC document
Service_Summary_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_A_-_Definitions _Abbreviations_and_Acronyms.doc DOC document
WRM_Cost_Summary_Report.xls XLS spreadsheet
Show all 50

War Reserve Materiels (WRM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-08-C-0004

Modification P00085/7Jan11

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
B
TDP TM OTHER admin/MGMT data
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

WRM

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
AXXX
Contract Field Service Report
Project Completion Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81238
PWS Para 4.2.1.3.5, 4.2.3.5.5
HQ ACC AMIC/PCE
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION

XX

asreq
ASREQ

b. COPIES

8. APP CODE
B
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE
Draft
Final
ASREQ
ASREQ
Reg
Repro
16. REMARKS:
HQ ACC AMIC/PKB

4) Report shall be in an electronic format compatible with Microsoft Office with the following file name structure: CDRL A011 - CE Completion Report. The delivery method is electronic posting to the MIS with e-mail notification with CE Project Completion Report and photos attached.

5) PWS, Section A, Para 3.5.2.2.4.4. CE Completion Report

The contractor shall provide a CE Project Completion Report within 30 days of project completion. Information will be submitted using a completed Project Completion Report Work sheet (attached). The CE Project Completion Report shall include a library of photos showing conditions before, during and after construction to thoroughly document the work performance.

8) The document will be accepted or rejected by the Government within 30 working days after receipt. If rejected the contractor shall revise and resubmit the document within 10 working days after receipt unless otherwise directed by the PCO.

9) Distribution authorized to U.S. government agencies only (administrative or operational data, 29 May 02). Other requests for this document shall be referred to HQ ACC AMIC/PKB.

//////Continued on Word Document - CDRL-A011: Project Completion Report Work Sheet///////

HQ ACC AMIC/PCE

HQ ACC AMIC/PMSW

HQ ACC AMIC/DRQ

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CDRL-A011: Project Completion Report

SITE

WORK REQUEST NUMBER:

PROJECT TITLE:

PROJECT TYPE (WORK CLASS):

PROJECT COMPLETION DATE:

COMPLETION REPORT SUBMISSION DATE:

ACTUAL LABOR COST (FUNDED):

ACTUAL LABOR COST (UNFUNDED):

ACTUAL MATERIAL COST (FUNDED):

ACTUAL MATERIAL COST (UNFUNDED)

PROFIT/OVERHEAD/HANDLING FEE (FUNDED):

TOTAL COST (FUNDED):

TOTAL COST (UNFUNDED):

SITE MANAGER:

If this project did not impact or change any real property records so comment following NOTE: below and do not submit the Completed Project Checklist (remaining pages).

NOTE:

DATE:

COMPLETED PROJECT CHECKLIST

Building/Facility No.:

Project Title:

Project Number:

Work Order Number:

Total SF (of new construction):

Total Project Cost (includes everything):

Project Inspector Name and Phne Number

* NOTE: Please list Type, Model Number, and Serial Number for A/C, Boilers, Auto Fire Detection, Generators, and

Security Systems.

Systems Added or Increased:

Unit of

Cat. Code

Measure

Amount

Cost

880-211

Closed Head Auto Sprinklers

SF

(need both units of measure)

HD

880-212

Open Head Deluge System

SF

(need both units of measure)

HD

880-221

Auto Fire Detection System

SF

(need both units of measure)

EA

880-222

Manual Fire Alarm System

EA

(Interior System)

880-231

CO2 Fire System

EA

880-232

Foam Fire System

EA

880-233

Other Fire System

EA

880-234

Halon 1301 Fire System

EA

872-841

Security Alarm System

EA

890-126

A/C Window Units

TN

(need both units of measure)

SF

890-125

A/C Plant Less than 5 Ton

TN

(need both units of measure)

SF

Systems Added or Increased (con'td):

Unit of

Measure

Amount

Cost

890-121

A/C Plant 5 to 25 Ton

TN

826-122

A/C Plant 25 to 100 Ton

TN

826-123

A/C Plant Over 100 Ton

TN

821-115

Heating Plant 750/3500 MBTU

MBTU

811-147

Electric Emergency Power

Generator

KW

Diesel Fuel tank for generator

GA

INFRASTRUCTURE

813-231

Transformers

812-223

Primary Electrical Distribution

Line OH

LF

812-224

Secondary Electrical Distibution

Line OH

LF

812-225

Primary Electrical Distribution

Line UG

LF

812-226

Secondary Electrical Distibution

Line UG

LF

812-923

Exterior Area Lights

EA

824-464

Gas Mains

LF

831-169

Sewage Septic Tank

KG

832-266

Sanitary Sewer Main

LF

842-245

Water Distribution Mains

LF

843-315

Fire Hydrants

EA

851-143

Curb and Gutters

LF

851-145

Driveway

SY

Type:

(concrete, bituminous, stabilized, other)

851-147

Road

SY

(need both units of measure

LF

Type:

(concrete, bituminous, stabilized, other)

Systems Added or Increased (con'td):

Unit of

Measure

Amount

Cost

852-261

Vehicle Parking, Operational

SY

N/A

852-262

Vehicle Parking, Non-oganizational

SY

N/A

871-183

Storm Drain Disposal

LF

N/A

872-247

Security Fence / Vehicle Barrier

LF

N/A

872-248

Interior Fence

LF

N/A

852-289

Sidewalk

SY

N/A

890-158

Load/Unloading Platform

SF

N/A

832-255

Industrial Waste Main

LF

N/A

890-144

Compressed Air Distribution

LF

N/A

Hoist; Cranes

(Permanently Installed)

EA

N/A

Hydraulic Lifts

(Permanently Installed)

EA

l

N/A

Paint Spray Booth

(Permanently Installed)

EA

N/A

Please list all Real Property that was Demolished:

Total estimated cost of demolition of a facility/building (whole or part):

Supervision and/or administration:

Total estimated cost:

List unit of measure and cost (estimated or actual) of any system increased or added to a structure that is NOT listed above.

Unit of

Nomenclature

Measure

Amount

Cost

EA

EA

EA

File details come from the government source that posted it. Updated .