Appendix_J_-_Government_Furnished_Facilities_(Draft_-_24_Oct_14).doc

DOC document 1 MB Posted

Attached to
War Reserve Materiels (WRM) Federal contract opportunity
Solicitation number
FA4890-15-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Appendix J - Government Furnished Facilities (Draft - 24 Oct 14)

View the file

Other files for this federal contract opportunity

Other files attached to War Reserve Materiels (WRM), newest first.
File Type Posted
Solicitation_FA4890-15-R-0004_Amendment_0004.doc DOC document
Industry_Questions_-_Reference_to_Amendment_2_-_20151001.xls XLS spreadsheet
Solicitation_FA4890-15-R-0004-Amendment_0003.doc DOC document
Appendix_G_-_Level_of_Effort_(LOE)_(20150902).doc DOC document
Appendix_O_-_WRM_Authorizations_(20150902).doc DOC document
WRMMS_User_Guide_(20150902).pdf PDF
Industry_Questions_(PPC)_(20150902).xlsx XLSX spreadsheet
Appendix_M_-_Certifications_(20150902).docx DOCX document
Signed_Shaw_CBA_(1_Aug_15_-_31_Jul_18).pdf PDF
Performance_Work_Statement_(20150902).doc DOC document
Appendix_F_-_AFCENT_WRM_Award_Fee_Plan_with_Quality_Performance_Index_(20150902).doc DOC document
Appendix_B_-_Deliverables_(20150902).doc DOC document
WRM_Cost_Summary_Report_(20150902).xls XLS spreadsheet
Pre-Proposal_Conf_Attendees_-_11_Aug_2015.pdf PDF
Appendix_O_-_WRM_Authorizations.doc DOC document
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_M_-_Certifications.doc DOC document
Appendix_H_-_Special_Requirements__for_Deployment_Support_(1).doc DOC document
Database1.mdb MDB file
Appendix_B_-_Deliverables.doc DOC document
Appendix_A_-_Definitions _Abbreviations_and_Acronyms.doc DOC document
WRM_Cost_Summary_Report.xls XLS spreadsheet
WRM_QASP.docx DOCX document
Appendix_J_-_Government_Furnished_Facilities_(GFF).xls XLS spreadsheet
Appendix_K_-_Government_Furnished_Property_(GFP).doc DOC document
DynCorp_Shaw_CBA_1_Aug_15_-_31_Jul_18.pdf PDF
Correction_to__Award_Date_of_WRM_Contract.doc DOC document
Industry_Q A_from_Site_Visits_ _Draft_RFP_(20150609).docx DOCX document
WRM_Recompete_Synopsis.doc DOC document
Industry_Site_Visit_Itinerary_-_6-16_Apr_2015.pdf PDF
Industry_Site_Visit_Itinerary_-_6-15_Apr_2015_(REVISED).pdf PDF
Questions_for_Industry_Day.doc DOC document
Sections_L_and_M_(Draft_-_19_Nov_14).doc DOC document
Final_-_WRM_Industry_Day_Announcement.doc DOC document
CDRL_A015_Health_and_Safety_Plan_(Draft_-_24_Oct_14).doc DOC document
CDRL_A010_Test_and_Inpsection_Report_(Draft_-_24_Oct_14).doc DOC document
CDRL_A009-_Emergency_Response_Plan_(Draft_-_24_Oct_14).doc DOC document
Appendix_B_-_Deliverables.doc DOC document
DD_Form_254_(Draft_-_24_Oct_14).pdf PDF
ppi_tool.accdb.mdb MDB file
Performance_Work_Statement_(20150715).doc DOC document
CDRL_A008__Environmental_Protection_Plan_(Draft_-_24_Oct_14).doc DOC document
Service_Summary_(Draft_-_24_Oct_14).xlsx XLSX spreadsheet
Solicitation__FA4890-15-R-0004___WRM.doc DOC document
Appendix_A_-_Definitions _Abbreviations_and_Acronyms.doc DOC document
WRM_Cost_Summary_Report.xls XLS spreadsheet
DD_FORM_254_Continuation_Page_(Draft_-_24_Oct_14).pdf PDF
WRM_QASP.docx DOCX document
DD254__FA4890-15-R-0004_Solicitation.pdf PDF
CDRL_A001_Facilities_MCP_(Draft_-_24_Oct_14).doc DOC document
Show all 50

War Reserve Materiels (WRM) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract: FA4890-15-R-0004

APPENDIX J

Government-Furnished Facilities (GFF)

1.0. Government-Furnished Facilities. GFF include facilities are provided by the government for storage, maintenance, operations, and use as directed. The Government retains the authority to modify or realign facilities and space provided to the Contractor based on current Air Force (AF) guidelines for space utilization, mission, and personnel requirements. The contractor maintains facilities to meet Air Force Standards on a firm fixed price basis. Included in these facilities are warm basing facilities and contractor utilized facilities.

1.1. Seeb GFF

(DELETED – P00062)

1.2. Thumrait GFF (P00XXX)

1.3. Qatar GFF (P00087)

1.4. Masirah GFF

1.5. Ahmed Al Jaber GFF (DELETED – P00069)

1.6. Manama, Bahrain GFF

1.7. Shaw AFB (P00007)

1.8 Thumrait, Masirah & AUAB (P00223)

1.9 Al Udeid Air Base (P00249)

_1412601537.doc Contract No. FA4890-08-C-0004

P00087/13Jan11

Government Furnished Facilities – Qatar

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

WRM FACILITIES

Facility # 8401 Warehouse 1 Supply

4,000,000

101,404

502’ x 202’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

101,404

Facility #8401B

55,000

35’ x 24’. Wood fabricated building with 2” x 4” walls and 2” x 6” roof support. Walls and ceiling covered with ½” plywood exterior and 1/4” plywood interior. Building resting on existing ware house concrete reinforced floor. Triple 2” x 8” solid wood beam and posts roof support. No insulation. External and internal wall panels are painted. Flat roof of ½” plywood sheeting.

Structure is located inside WH #1 (BLDG #8401)

55,000

Added P00057

Facility # 8402 Warehouse 2 (Vehicle Maintenance)

4,000,000

101,404

502’ x 202’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

101,404

Facility #8402C

60,000

30’ x 30’. Wood fabricated building with 2” x 4” walls and 2” x 6” roof support. Walls and ceiling covered with ½” plywood exterior and 1/4” plywood interior. Building resting on existing ware house concrete reinforced floor. Triple 2” x 8” solid wood beam and posts roof support. No insulation. External and internal wall panels are painted. Flat roof of ½” plywood sheeting. Vinyl flooring.

Structure is located inside WH #2 (BLDG #8402)

60,000

Added P00057

Facility # 8403 Warehouse 3 (BEAR Base)

4,000,000

101,404

502’ x 202’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

101,404

Facility # 8404 (USAF Warehouse 4)

4,000,000

101,000

500’ x 202’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

NOTE: This facility was previously the Trap and MRSP warehouse and was returned to the USAF in 2005.

101,000

DELETED

P00087

Facility # 8406 Medical Warehouse 1

(Part of CAOC area)

1,100,000

18,225

225’ x 81’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish. Central Air Conditioning installed in the building.

NOTE: This facility was previously the Medical Warehouse 1 and is now being used by the CAOC.

DELETED

Facility # 8407 Medical Warehouse 2

(Part of CAOC area)

25,000

15,228

188’ x 81’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated profiled corrugated metal sheets. Masonry walls are a painted stucco finish. Central Air Conditioning installed in the building.

NOTE: This facility was previously the Medical Warehouse 2 and is now being used by the CAOC.

DELETED

Facility #TBD PEB MS&D Receiving

700,000

12’ x 10’ Prefabricated building with timber flooring and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron, which rest on reinforced concrete piers. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

Structure is located inside WH #1 (BLDG #8401)

Facility # 8413 Hazardous Material Storage Area

700,000

35739

209’ x 171’ Fenced area with steel pipe fence posts and chainlink fencing attached. Gates fabricated from steel pipe with a chainlink infill. Surface of the fenced area is reinforced concrete.

Contained within this area is an open sunshade of dimensions 80’ x 80’. Sunshade consists of a reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof of double skin insulated corrugated metal sheets.

35739

Facility #TBD Vehicle Yard and DRMO

1,250,000

564,300

1140’ X 495’ consolidated area for open storage and staging of assets. Area is fenced with steel pipe fence posts and chainlink infill. Three double leaf entry gates are installed fabricated from steel pipe with a chainlink infill.

564,300

Facility # 8414 Corrosion Control Building

200,000

10,500

150’ x 70’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

10,500

Facility # 8412 FORCE Maintenance Building

900,000

13,392

124’ x 108’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

13,392

Facility # 8410 Communication Warehouse

650,000

8,200

100’ x 82’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

NOTE: The WRM Program is no longer using this building. Another USAF entity has occupancy.

DELETED

Facility #8452 Warehouse

880,000

120,000

200’ x 600’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with a double skin insulated corrugated metal siding above a dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

120,000

Added P00057

Facility # 8453 Corrosion Control Workshop

200,000

2,380

68’ x 35’ reinforced concrete foundation slab with ‘I’ beam stanchions and roof trusses along with metal purlins holding up a profiled metal sheeting roof. Side walls have metal perlins with corrugated metal sheeting attached.

Block walled offices are enclosed (32’ x 17’) with a wooden roof and are air-conditioned.

A self-contained paint spray booth was installed in 2005.

2,380

Facility # 8457 FORCE test pad

Unknown

3,456

60’ x 50’ reinforced sloping concrete foundation slab. A 64’ x 54’ steel framed structure terminating at a pitched roof. Roof consists of single skinned corrugated metal sheeting.

There is a 70’ x 9’ x 8” concrete block wall erected on two sides of the facility to act as a windbreak.

3,456

Facility # 8460 Generator Run-Up & Load Bank Facility

200,000 (+ load bank equipment)

2,340

60’ x 30’ reinforced concrete foundation slab with a reinforced concrete ramp of dimensions 60’ x 9’ x 8” thick. Covering this slab is a metal framed sunshade with necessary reinforced concrete footings for the stanchions. Sunshade has a pitched roof consisting of single skinned corrugated metal sheeting.

2,340

Facility # 8461

Load Bank Control Booth

Unknown

20’ x 20’ reinforced concrete foundation slab with a 10’ x 10’ Control Room. Structure is a prefabricated building with timber floor mounted on a metal skid unit. 4’ modular section, plywood panels externally with painted stucco finish and hardboard facing internally. Pitched roof of corrugated metal sheeting.

4 ea. Static Grounding Points are installed.

Facility #8464 QAE Building

1,360,000

9,600

80’ x 120’ reinforced concrete foundation slab with a steel framed structure terminating at a reinforced concrete flat roof. Masonry walls are a painted stucco finish. Roof is gravel coated.

9,600

Added P00057

Facility #8470 Warehouse

440,000

60,000

200’ x 300’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with a double skin insulated corrugated metal siding above a dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

60,000

Added P00057

Area 55 Storage Area

3,160,300

1430’ x 2210’ consolidated open storage/staging area. Fully enclosed by steel post and chain link fence with 3 entrances with double gates. 1 internal fenced area paved with double entrance gates. 1 internal fenced area with compacted ground with 2 double entrance gates.

3,160,300

Added P00057

Facility # 8463 TRAP Facility

450,000

6,800

120’ x 30’ by 80’ x 40’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. External walls are concrete block with internal partition walls of the same material. Roof consists of double skinned insulated corrugated metal sheets. External walls are a painted stucco finish.

6,800

Facility #8462 TRAP Sunshade 30’x200’

TBD

6,000

On the north side of the Multi Shop Facility there is a 200’ x 30’ Sunshade. Sunshade is a steel framed structure terminating at a pitched roof. Concrete footings are laid for the main columns that are erected over consolidated ground. Roof consists of single skinned corrugated metal sheeting.

6,000

Facility #8474 TRAP sunshade 40’x30’

TBD

1,200

On the east side of the Multi Shop Facility, there is a FMSE pad (40’ x 30’) of reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Roof consists of single skinned corrugated metal sheeting.

1,200

Facility # 8456 Wash Rack

300,000

4,674

Wash Rack Facility consists of two drive- through wash bays with a raised reinforced concrete ramp in one bay. The ramp structure consists of two raised vehicle tread support, each 5’ wide x 4’-3” at the highest point by 94’-6” overall length. Parallel separation distance is 3’-4”.

An 82’ x 57’ reinforced concrete foundation slab forms the base of the sunshade with a steel framed structure terminating at a pitched roof. Roof consists of single skinned corrugated metal sheeting.

A 33’ 6” x 19’-8” reinforced concrete foundation slab that serves as a Mechanical Room. Walls are erected from concrete blocks and a reinforced concrete roof.

4,674

Facility # 9003 Small Wash Rack

10,950

29’ x 18’ reinforced concrete slab with a 4’ x 4’ x 8’ deep sump covered by a H20 bridge loaded iron grate.

Added P00057

Facility # 9004 PEB/Site Support Office

75,000

26’ x 16’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External walls are a painted stucco finish. Pitched roof of corrugated metal sheeting. Building is mounted on concrete block footing.

Facility #9002 T.O. and QC Office

85,000

40’ x 16’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External walls are a painted stucco finish. Pitched roof of corrugated metal sheeting. Building is mounted on concrete block footing.

Facility # 8150 COE Building

100,000

1,148

41’ x 28’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ Modular section plywood panels, internal and external with insulation insert.

External wall panels are painted. Pitched roof of corrugated metal sheeting. Building is mounted on concrete footing.

Note: This building is being used by the 379th BCE.

DELETED

Facility #TBD COE Overhead Water Tank

10,000

9’ x 3’ Tower fabricated from 4” x 2” metal uprights that are mounted on concrete pads. There is a platform fabricated from 4” x 2” angle iron with a mounted a fiberglass water tank.

Note: the WRM Program does not occupy this structure.

DELETED

Facility #TBD COE Covered Car Park

35,000

1,840

92’ x 20’ graded area with reinforced concrete foundation pads on which 4” x 4” mild steel box section stanchions are erected. Mild steel box section also forms the roof trusses with 4” x 2” angle iron roof purlins and corrugated metal roofing.

Note: the WRM Program does not occupy this structure.

DELETED

Facility #TBD COE Septic Tank

25,000

15’ x 11’ reinforced concrete holding septic tank with a reinforced sectional concrete cover with lifting hooks and two inspection manholes.

Note: the WRM Program is not using this tank.

DELETED

Facility # 8451 QAE Building

125,000

1,767

57’ x 31’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting. Building mounted on concrete block piers.

As an integral part of this structure, on one end there are two water tanks mounted on concrete piers. A water pump is fitted in the system.

1,767

Facility #TBD QAE Building Covered Car Park

30,000

1,425

75’ x 19’ graded area with wooden 4” x 4” stanchion posts set into the ground. Trusses are fabricated from 8” x 2” timber with 4” x 2” wooden purlins. Corrugated metal roofing.

1,425

QAE Building Generator Shed

20,000

25’ x 15’ reinforced concrete foundation slab with block walls on three sides for the generator. 4” x 4” timber stanchions hold up a timber framed roof above which is attached corrugated metal roofing.

Included in this footprint is the Switchgear Room (dimensions 15’ x 5’).

Note: This shed is not in use.

Facility #TBD QAE Diesel Tank

10,000

8’ long x 4’ diameter metal diesel tank mounted on concrete blocks.

Note: This tank is not in use.

DELETED

Facility #TBD QAE Building Septic Tank

15,000

15’ x 15’ reinforced concrete holding septic tank with a reinforced sectional concrete cover with lifting hooks and an inspection manhole.

Facility # 9008 PEB Purchasing Office

55,000

40’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 9005 PEB Supply Building

50,000

32’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert.

External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 9009 PEB Supply Building

55,000

36’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert.

External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 9007 PEB Freight & Traffic Office

55,000

36’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 8453 PEB/TMO Building

100,000

1,880

40’ x 47’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

1,880

Facility # 9010 PEB Material Control Building

90,000

1,440

40’ x 36’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

1,440

Facility # 9001 PEB Contractor’s Field Office

55,000

36’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

DELETED

Facility # 9006 PEB SBSS Office

55,000

36’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete footing. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 8455 PEB Civil Engineering Field Office

40,000

18’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Attached to the metal skid are legs fabricated from mild steel angle iron mounted on reinforced concrete flooring. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting.

Facility # 8416 Fire and Domestic Water Pump House

150,000

36’ x 27’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

Fire and domestic water pumping equipment are installed in this building.

Facility # 8417 Fire Water Tank

400,000

1,662

46’ diameter water tank fabricated from pre-engineered section steel panels bolted together to form a circular tank. Metal tank rests on a reinforced concrete circular foundation slab.

Height of water tank 32’

This tank was ‘relined’ in June 2006.

1,662

Facility # 8415 Domestic Water Tank

50,000

20’ x 20’ reinforced concrete domestic water tank with necessary float switches and inspection panel.

Facility # 8411 Electrical Sub Station No.2

155,000

31’ x 16’ reinforced concrete foundation slab with concrete block walls covered with a terolyne finish. Reinforced concrete roof with a parapet wall.

1000 KVA Transformer Room

Transformer mounted on a metal skid with metal louvers on both side elevations of the structure.

Switchgear Room

‘Square D’ Switchgear is installed in an air-conditioned area.

Facility # 8405 Electrical Sub Station No.1

155,000

31’ x 16’ reinforced concrete foundation slab with block walls covered with a terolyne finish. Reinforced concrete roof with a parapet wall.

1000 KVA Transformer Room

Transformer mounted on a metal skid with metal louvers on both side elevations of the structure.

Switchgear Room

Cutler Hammer Westinghouse Switchgear is installed in an air-conditioned area.

Facility # 8458

PEB Rest Room

50,000

27’ x 14’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting. Building mounted on concrete block footing.

Facility # 8459 PEB Toilet Area

50,000

28’ x 12’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external with insulation insert. External wall panels are painted. Pitched roof of corrugated metal sheeting. Building mounted on concrete block footing.

Facility #TBD Toilet Area Portable Septic Tank

20,000

Two ‘Polycon’ septic tanks mounted just below ground level and interconnected.

Each tank is 8’ L. x 5’D.

Facility # 9005 PEB Breakroom

40,000

32’ x 10’ Modular structure with timber floor and suitable floor covering mounted on a metal skid. Walls from 4’ modular section plywood panels, internal and external, with insulation inset. External walls are a painted stucco finish. Pitched roof of corrugated metal sheeting. Structure mounted on reinforced concrete blocks. Partition walls form eight toilets, urinals and sinks.

Elevated water tank and tower has been erected with a ground water tank for additional storage capacity.

Large underground holding tank has been installed for the effluent.

Facility #TBD Modular Unit Breakroom

105,000

40’ x 20’ Modular structure with timber floor and mounted on a metal skid. Walls form 4’ modular section plywood panels, internal and external with insulation insert. External walls are a painted stucco finish. Pitched roof of corrugated metal sheeting. Structure mounted on reinforced concrete blocks.

A sink unit has been installed.

DELETED

Facility #TBD Sewage Lift Station

25,000

5’ x 5’ reinforced concrete holding tank with lift off manhole. Float switches and lift pump fitted.

Facility #TBD Sewage Pumping Station

50,000

22’ x 7’ reinforced concrete holding tank with three lift off manholes. Float switches fitted with “Jackson” Control Box and Lift Pump.

Facility #TBD Absorption Pit

200,000

5,848

86’ x 68’ Effluent absorption pit.

5,848

Facility #TBD Concrete Pad for BEAR Base Generator

30,000

Reinforced concrete pad of dimensions 12’ x 10’x 6” thick. Two Cambell Hausfeld air compressors installed.

Facility #9011 Fuel Point

281,000

3,360

56’x60’ reinforced concrete slab foundation with covered by a structural steel sunshade (46’x46’) with an eave height of 18’ and ridge height of 21’. There is a 10’x10’ Control Room. Two steel horizontal fuel storage tanks, spill containment with a metered self-serve dispensing pump system.

This area is well lit with overhead floodlights. Construction was completed in March 2006.

3,360

Facility #TBD BEAR Base HazMat Material and HazWaste Storage Point

200,000

1,360

Reinforced concrete pad of dimensions 50’ x 20’ over which a metal framed sunshade is erected. Corrugated metal sheeting is affixed to metal purlins. A reinforced concrete connecting ramp 24’ x 15’ is laid to the main ‘black top’ road. Base is 8” thick.

1,360

Facility #TBD Concrete Pad for BEAR Base Generator

40,000

Reinforced concrete pad of dimensions 12’ x 10’. Base is 6” thick.

Facility #1677 Munitions

15,000

Covered 200’ x 75’ compacted, raised dirt pad. Grounding point existing.

Maintenance and Inspection Pad with an Expeditionary Set comprising 1 Small Shelter System (SSS), Aluminum Matting (AM2), 4 Commercial A/C Units and 1 MEP-7 Generator. Structure comprised of an Aluminum Frame with a Fabric Cover.

(BB responsible for any contingency sets installed on the pad)

15,000

Added P00057

Facility #3878 Munitions Office

1,500

30’ x 50’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid attached to the metal skid legs fabricated from mild steel angle iron on a reinforced concrete footing. Walls from modular section plywood panels. Internal and external walls have insulation inserts. External walls are painted. Pitched roof of corrugated metal sheeting.

1,500

Added P00057

Facility #3880 Munitions Office

1,500

30’ x 50’ prefabricated building with timber floor and vinyl tiles mounted on a metal skid attached to the metal skid legs fabricated from mild steel angle iron on a reinforced concrete footing. Walls from modular section plywood panels. Internal and external walls have insulation inserts. External walls are painted. Pitched roof of corrugated metal sheeting.

1,500

Added P00057

Facility #TBD Munitions Igloos #17001-17050

6,000,000

100,000

50 ea 80’ x 25’ buildings fabricated from reinforced concrete. Structure is covered with soil. Heavy metal sliding door is fitted.

100,000

25 added P00057

PGM Facility #17550 (Sun Shade)

4,968

On the East side of the Precision Guided Munitions facility there is a 72’ x 69’ Sunshade. Sunshade is a steel framed structure terminating at a pitched roof. Concrete footings are laid for the main columns that are erected over AM2 matting. Roof consists of heavy weight fabric. The rope lacing the fabric in place is in good condition. NOTE: This facility is located in the Munitions Storage Area

4,968

Added P00057

PGM Facility #17552 (Sprung Type)

8,120

116’ X 70’ reinforced asphalt foundation. The steel structure is in good condition. The fabric and the rope securing the fabric to the structure are in good condition. This facility is powered by a generator. Two (2) large (2 Ton) air conditioners are installed and are in the process of being connected to the facility.

NOTE: This facility is located in the Munitions Storage Area.

8,120

Added P00057

Munitions

Pad 11

2,500

50’ x 50’ compacted, raised dirt pad. Pad only 80% complete. Grounding point pending pad competition.

2,500

Added P00057

Facility # 8420 Site Administration

250,000

2,736

72’ x 38’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. External walls are concrete block with internal partition walls of the same material. Roof consists of double skinned insulated corrugated metal sheets. External walls are a painted stucco finish.

2,736

Facility # 8421 Admin Vehicle Sunshade

100,000

7,260

On the west side of the two Administration buildings there is a 165’ x 44’ sunshade. Sunshade is a steel framed structure terminating at a pitched roof. Concrete footings are laid for the main columns that are erected over consolidated ground that has a layer of asphalt. Roof consists of single skinned corrugated metal sheeting.

7,260

_1412601539.doc Solicitation No. FA4890-07-R-0014

SECTION C

Government Furnished Property – Manama, Bahrain

Current as of: April 22, 2007

Solicitation No. FA4890-07-R-0014

Modification No. P00068

SECTION C

Government Furnished Property – Manama, Bahrain

Current as of: November 16, 2006

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ I Warehouse

Per lease

260,780

590' x 442' reinforced concrete foundation slab with a steel framed multispan structure terminating at a pitched roof. Masonry walls to a height of 22'-7" with double skin insulated corrugated metal siding above this dado. Roof consists of double skin insulated corrugated metal sheets. Masonry walls are a painted stucco finish.

Each separate warehouse section has a full sliding door at the mid point for segregation.

Various runs of steel mezzanine flooring are installed as follows:

Bay - 1/10

4 x 219'6" x 47'4" = 41,556 sq. ft.

Bay - 2/9

3 x 219'6" x 47'4" = 31,167 sq. ft.

1 x 195'2" x 47'4" = 9,239 sq. ft.

260,780

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ II

Warehouse No. 6

Per lease

87,912

296’6” x 296’6” reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level.

Internal construction consists of the following:

OFFICE BLOCK

A permanent block wall structure with reinforced concrete support columns forming a ground and mezzanine floor. ‘I’ beams form the steelwork structure. Insulation board is utilized for the roof / ceiling that is suspended from the roof purlins of the structure.

Office Block Dimensions 109’6” x 34’8” = 3805 sq. ft.

There are three modular offices each 10’ 10” x 10’.

Six each 10’ 10” x 10’ = 654 sq. ft.

Female Toilet 12’ x 7’ = 84 sq. ft

Male Toilet 11’ x 9’ = 99 sq. ft.

BARE Base / Transportation Latrines

A permanent block walling structure with reinforced concrete support columns. Insulation board is utilized for roof / ceiling of this structure.

2 No. Toilet Blocks each 17’2” x 12’6”

2 No. 17’2’ x 12’6” = 430 sq. ft

MEZZANINE FLOORING

Steelwork mezzanine floor constructed of ‘I’ Beams for main vertical supports with similar cross members. Steel decking is fixed to the steelwork.

Mezzanine Floor dimensions:

147’6” x 98’6” = 14529 sq. ft

87,912

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ II

Warehouse No. 7

Per lease

15,055

122’7” x 122’7” reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level.

Internal block walls are used to partition off four separate areas on each side of the structure.

3 each Workshop

Carpentry Workshop

35’ 10’ x 32’10” = 1174 sq. ft.

Battery Room

32’ 10’ x 32’ 10” = 1076 sq. ft.

Welding Shop

35’ x 32’ 10” = 1148 sq. ft.

HazMat Storage Areas

Three each 32’ 10” x 32’ 10” = 3229 sq. ft.

One each 42’ x 32’ 10” = 1378

- 11’ x 11’ = - 60.5

2 1317.5 = 1317.5 sq. ft.

Wash Room

One each 10’ x 7’ = 70 sq. ft.

Mezzanine Floor

Steelwork mezzanine floor constructed of ‘I’ beams for main vertical supports with similar cross members. Steel decking is fixed to the steelwork.

Mezzanine floor dimensions:

8 Sections 32’10”x 21’ 4” = 5600sq. ft.

2 Sections 32’10”x 23’ = 1509sq. ft.

7109sq. ft.

15,055

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ II

Warehouse No. 8

Per lease

68’9” x 59’ reinforced concrete foundation slab with a steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level. All electrical fittings are explosive -proof.

Office/Store

A permanent block wall structure with reinforcement. Insulation board is utilized for the roof/ceiling of this structure.

Office #1 - 13’1” x 12’1” = 158 sq. ft

Office #2 - 12’6” x 12’1” = 151 sq. ft

Store - 9’10” x 12’1” = 118 sq. ft

Male / Female Toilets

A permanent block wall structure with reinforcement. Insulation board is utilized for roof/ceiling of this structure.

Toilet #1 - 5’ x 6’2” = 31 sq. ft

Toilet #2 - 3’6” x 6’2” = 22 sq. ft

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ II

FMSE Run Up Area

Per lease

3,389

68’10” x 49’3” covered reinforced concrete foundation slab with sloping gullies for ‘spill containment’ on one side and end of the pad. Mild steel heavy-duty gratings are installed over these gullies. A grounding system is installed at two locations on the pad.

Sunshade is manufactured from a steel framework with a light fabric roof.

3,389

BANZ II

Covered Wash Area

Per lease

3,160

68’10” x 45’10” reinforced concrete foundation slab with sloped gullies draining into a sludge tank. Mild steel heavy-duty gratings are installed over these gullies.

Included in this facility is a reinforced concrete vehicle ramp.

Sunshade is manufactured from steel pipe framework with a light fabric roof.

3,160

BANZ II

Loading Dock

Per lease

4,835

77’3” x 62’7” reinforced concrete foundation slab with a drive up ramp and set of concrete stairs for emergency egress. There are five mechanical ramps on the loading area.

4,835

BANZ II

GRF Maintenance and Run-Up Areas

Per lease

4,140

68’10” x 38’9” reinforced concrete pad with a sunshade manufactured from a steel pipe framework and a light fabric cover. There is an adjacent 38’ x 38’ 9” parking area with an asphalt surface.

4,140

BANZ II

Security Building

Per lease

17’ x 15’1” + 6’7” x 5’ reinforced concrete foundation slab with concrete block walls for the perimeter. There is a reinforced concrete flat roof with a parapet. Masonry walls are plastered with a paint finish.

Guard House - 17’ x 15’ 1” = 257 sq. ft

Toilet Area - 6’7” x 5’ = 33 sq. ft

257 + 33 = 290 sq. ft

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ III

Warehouse

No. 12

Per lease

409,295

280,937

Two-story building with reinforced concrete foundation slab on first floor with concrete columns and precast/reinforced slab on the second floor covered by a steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” ft above the inside finished floor level. Climate controlled with fire suppression sprinkler system.

Mezzanine Racking System

Steelwork mezzanine floor constructed of ‘I’ beams for vertical supports with similar horizontal cross members. Steel decking is fixed to the steelwork with a roller system to accommodate 10,000 lb. 463L Aircraft Pallets.

Mezzanine Floor dimensions:

1st Floor – 119,479 sq. ft.

2nd Floor – 161,458 sq. ft.

Facility is equipped with four 20-ton capacity equipment elevators operating from the first to second floor.

800 KVA Emergency Standby generator with an automatic transfer switch.

Office #1 - 992 ft. sq.

Office #2 - 614 ft. sq. with a 97ft sq.

toilet block.

External loading dock with five hydraulic dock levers and access ramp.

Toilet Area

Toilet #1 - 1,285 ft. sq.

Toilet #2 - 282 ft. sq.

Toilet #3 - 282 ft. sq.

Toilet #4 - 282 ft. sq.

409,295

280,937

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ

Warehouse 3

Vehicle Maintenance

Per lease

26,909

Reinforced concrete foundation slab with a vertical columns and steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level.

Climate controlled.

Office - 16’ x 26’ = 416 ft. sq.

Toilet - 8’6” x 20’ 4” = 173 ft. sq.

26,909

BANZ

Warehouse 4

Medical

Per lease

26,632

Raised reinforced concrete foundation slab with vertical columns and steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 3’3” above the inside finished floor level.

Climate controlled.

Two. Loading docks.

66 ton drive-through vehicle scales (Weigh Bridge) 60’L x 10’W surface mounted

10’ x 10’ Weigh Bridge Control Room with computer read-out

26,632

BANZ

Corrosion

Control

Per lease

11,000

Raised reinforced concrete foundation slab with vertical columns and steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level. Climate controlled with compressed air & extractor system.

Two Loading docks

Shop #1 - 89’2” x 41’4” = 3,689 ft. sq.

Shop#2 - 89’2” x 29’6” = 2,635 ft. sq.

Office - 21’11’x 71’10” = 1,579ft.sq.

Male Toilet - 18’4”x19’8’’ = 361ft.sq.

Female Toilet - 9’2”x20’11” = 192ft.sq.

11,000

ALLOCATED SQ FEET

FACILITY

COSTING

SIZE

DESCRIPTION

HN

USAF

OTHER

BANZ

Chamber 7

Cold Storage

Per lease

73,905

362’2” x 204’ Raised reinforced concrete foundation slab with vertical columns and steel framed structure terminating at a pitched roof. Roof consists of insulated corrugated metal sheets. Siding consists of insulated double skin corrugated metal sheets commencing 1’8” above the inside finished floor level. This facility is a refrigerated storage facility with a temperature range 40/50F

Hydraulic dock leveler and pallet racking system and Airlock

34,948 sq.ft.

C-63

C-64

C-65

C-66

C-67

C-68

C-69

_1468213099.xls Thumrait

New Facil ID Facility Name Description Space Usage

Total SF RAFO USAF Other RAFO USAF

23 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

24 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

25 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

26 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

27 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

28 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

29 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

30 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

31 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is not bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

32 Ammo Storage Magazine 5,500,000 (total for all 11 magazines) 4,000 4000 100’ x 40’ reinforced concrete foundation with a steel framed structure terminating at a pitched roof. Masonry walls to a height of 10’ with single skin metal siding above this dado. Roof consists of single skin corrugated metal sheets. Masonry walls are a painted stucco finish. Magazine is bermed. 4000 (total for all 11 magazines) 40000 (total for all 11 magazines) 0 0 4000

33 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

34 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

35 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

36 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

37 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

40 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

41 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

42 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

43 Ammo Storage Igloo 3,000,000 (total for all 11 igloos) 2,000 2000 80’ x 25’ building fabricated from reinforced concrete, structures are well covered with soil. Heavy metal sliding doors are fitted. 4000 (total for all igloos) 18000 (total for all igloos) 0 0 2000

44 Ammo Maintenance Pad 44 and Sunshade 500,000 20,000 20,000 200’ x 100’ reinforced concrete pad barricade of consolidated earth and gravel with reinforced concrete end sections covered by a sunshade. 0 20,000 0 0 20000

45 Ammo Storage Pad and Sunshade 700,000 22,684 (11,342 each) 11342 Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”. 0 22,684 0 11342

46 Ammo Storage Pad and Sunshade 11342 Two sunshades (107’x106’ and 100’ x 100’) reinforced concrete slab with steel ‘I’ beam stanchions and rafters. Side and roof supports are fabricated ‘Z’ purlins. Mild steel cross bracing with corrugated metal siding to a mid point dado line. Roof is painted corrugated metal sheets. External eaves height is 23’. Minimum internal clearance is 19’ 7”. 11342

47 Munitions Maintenance Building (MMF) 400,000 4,524 3,300 116’ x 39’ reinforced concrete foundation slab. Concrete block internal and external walls. Pitched roof of corrugated sheets. Building consists of three workshop bays, two of which have an overhead crane. An office area is provided. External walls are a painted stucco finish. Bay 1 and the Generating Room are occupied by RAFO. 1,100 2,200 1224 (Joint use office space RAFO/USAF) 1,100 2200

302 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. 0 0 591 plus the added 221 sq. ft. each 0 0 812

389 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. 0 0 591 plus the added 221 sq. ft. each 0 0 812

390 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. 0 0 591 plus the added 221 sq. ft. each 0 0 812

391 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. 0 0 591 plus the added 221 sq. ft. each 0 0 812

392 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab with reinforced concrete columns and ring beams. Concrete block wall infill with corrugated metal roof sheets fastened to ‘Z’ purlins. Insulation is fitted in the roof space and timber fascia surrounds the perimeter of the roof eaves. Terrazzo tiles are laid in the main dwelling areas with ceramic tiles for the bathroom and pantry floors. Ceiling consists of acoustic mineral fiber tiles on exposed aluminum grid runner. Internal and external walls are rendered and painted. The existing courtyard (13’x17’) was enclosed to create a kitchenette in each of these accommodations. Window air conditioners were replaced with split units. Each unit has a wooden arbor covered carport. Refurbishment was completed in Sept. 2006. 0 0 591 plus the added 221 sq. ft. each 0 0 812

393 Junior Western Accommodation 250,000 628,000 (total for Junior Western Housing Units) 591 added 221 sq ft each 812 43’ x 13’8” reinforced concrete foundation slab…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .