The file's text, extracted by GovTribe without its formatting.
Section A - Solicitation/Contract Form
CLAUSES INCORPORATED BY REFERENCE
| 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations--Representation |
| MAY 2011 |
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Firm-Fixed Price (FFP)
FFP
Firm-Fixed Price (FFP) - See FAR 16.202
FOB: Destination
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Firm-Fixed Price Level-of-Effort
FFP-LOE
Firm Fixed Price Level of Effort (FFP LOE) Term – See FAR 16.207
NET AMT
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Fixed-Price Incentive (FPI) Firm
FPI
Fixed Price Incentive (FPI) Firm – See FAR 16.403-1
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
Fixed Price Incentive (FPI) Successive
FPI
Fixed Price Incentive (FPI) Successive – See FAR 16.403-2
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| QTY X UNIT PRICE AMOUNT |
Months
Firm Fixed Price Award Fee
FPAF
Firm Fixed Price Award Fee – See FAR 16.404
MAX AWARD FEE
TOTAL AMOUNT
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Cost Reimbursement (CR)
COST
Cost Reimbursement (CR) – See FAR 16.3
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Cost Plus Incentive Fee (CPIF)
CPIF
Cost Plus Incentive Fee (CPIF) – See FAR 16.304 and 16.405-1
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Cost Plus Award Fee (CPAF)
CPAF
Cost Plus Award Fee (CPAF) – See FAR 16.305 and 16.405-2
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Cost Plus Fixed Fee (CPFF) Term
CPFF
Cost Plus Fixed Fee (CPFF) Term – See FAR 16.306
FIXED FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Cost Plus Fixed Fee (CPFF) Completion
Cost Plus Fixed Fee (CPFF) Completion – See FAR 16.306
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
Cost Plus Fixed Fee Level of Effort
Cost Plus Fixed Fee Level of Effort (CPFF LOE) – See CPFF LOE Guide
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Firm-Fixed Price (FFP) |
FFP
Firm-Fixed Price (FFP) - See FAR 16.202
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Firm-Fixed Price Level-of-Effort |
FFP-LOE
Firm Fixed Price Level of Effort (FFP LOE) Term – See FAR 16.207
NET AMT
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Fixed-Price Incentive (FPI) Firm |
FPI
Fixed Price Incentive (FPI) Firm – See FAR 16.403-1
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Fixed Price Incentive (FPI) Successive |
FPI
Fixed Price Incentive (FPI) Successive – See FAR 16.403-2
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| QTY X UNIT PRICE AMOUNT |
Months
| OPTION |
| Firm Fixed Price Award Fee |
FPAF
Firm Fixed Price Award Fee – See FAR 16.404
MAX AWARD FEE
TOTAL AMOUNT
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Reimbursement (CR) |
COST
Cost Reimbursement (CR) – See FAR 16.3
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Incentive Fee (CPIF) |
CPIF
Cost Plus Incentive Fee (CPIF) – See FAR 16.304 and 16.405-1
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Award Fee (CPAF) |
CPAF
Cost Plus Award Fee (CPAF) – See FAR 16.305 and 16.405-2
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Fixed Fee (CPFF) Term |
CPFF
Cost Plus Fixed Fee (CPFF) Term – See FAR 16.306
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Fixed Fee (CPFF) Completion |
CPFF
Cost Plus Fixed Fee (CPFF) Completion – See FAR 16.306
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Cost Plus Fixed Fee Level of Effort |
CPFF
Cost Plus Fixed Fee Level of Effort (CPFF LOE) – See CPFF LOE Guide
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Firm-Fixed Price (FFP) |
FFP
Firm-Fixed Price (FFP) - See FAR 16.202
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Firm-Fixed Price Level-of-Effort |
FFP-LOE
Firm Fixed Price Level of Effort (FFP LOE) Term – See FAR 16.207
NET AMT
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Fixed-Price Incentive (FPI) Firm |
FPI
Fixed Price Incentive (FPI) Firm – See FAR 16.403-1
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Months
| OPTION |
| Fixed Price Incentive (FPI) Successive |
FPI
Fixed Price Incentive (FPI) Successive – See FAR 16.403-2
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| QTY X UNIT PRICE AMOUNT |
Months
| OPTION |
| Firm Fixed Price Award Fee |
FPAF
Firm Fixed Price Award Fee – See FAR 16.404
MAX AWARD FEE
TOTAL AMOUNT
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Reimbursement (CR) |
COST
Cost Reimbursement (CR) – See FAR 16.3
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Incentive Fee (CPIF) |
CPIF
Cost Plus Incentive Fee (CPIF) – See FAR 16.304 and 16.405-1
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Award Fee (CPAF) |
CPAF
Cost Plus Award Fee (CPAF) – See FAR 16.305 and 16.405-2
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Fixed Fee (CPFF) Term |
CPFF
Cost Plus Fixed Fee (CPFF) Term – See FAR 16.306
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Cost Plus Fixed Fee (CPFF) Completion |
CPFF
Cost Plus Fixed Fee (CPFF) Completion – See FAR 16.306
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Hours
| OPTION |
| Cost Plus Fixed Fee Level of Effort |
CPFF
Cost Plus Fixed Fee Level of Effort (CPFF LOE) – See CPFF LOE Guide
MIN / MAX ID/IQ CONTRACT VALUE
The minimum contract value for each ID/IQ contract issued shall not be less than $50,000.00. An award will be made upon execution of this contract by means of a task order (see PWS Table 2 and paragraph 3.5.4.1 for details regarding minimum guarantee ($50,000) awards resulting from ID/IQ source selection). The maximum contract value for the entire Training Support Services Contract shall not exceed $650 Million.
MIN / MAX TASK ORDER VALUE
The minimum task order value shall not be less than $3,00.00. The value for each task order issued against this contract shall not exceed $80,000,000.00.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0101 |
| Destination |
| Government |
| Destination |
| Government |
| 0102 |
| Destination |
| Government |
| Destination |
| Government |
| 0103 |
| Destination |
| Government |
| Destination |
| Government |
| 0104 |
| Destination |
| Government |
| Destination |
| Government |
| 0105 |
| Destination |
| Government |
| Destination |
| Government |
| 0106 |
| Destination |
| Government |
| Destination |
| Government |
| 0107 |
| Destination |
| Government |
| Destination |
| Government |
| 0108 |
| Destination |
| Government |
| Destination |
| Government |
| 0109 |
| Destination |
| Government |
| Destination |
| Government |
| 0110 |
| Destination |
| Government |
| Destination |
| Government |
| 0111 |
| Destination |
| Government |
| Destination |
| Government |
| 0201 |
| Destination |
| Government |
| Destination |
| Government |
| 0202 |
| Destination |
| Government |
| Destination |
| Government |
| 0203 |
| Destination |
| Government |
| Destination |
| Government |
| 0204 |
| Destination |
| Government |
| Destination |
| Government |
| 0205 |
| Destination |
| Government |
| Destination |
| Government |
| 0206 |
| Destination |
| Government |
| Destination |
| Government |
| 0207 |
| Destination |
| Government |
| Destination |
| Government |
| 0208 |
| Destination |
| Government |
| Destination |
| Government |
| 0209 |
| Destination |
| Government |
| Destination |
| Government |
| 0210 |
| Destination |
| Government |
| Destination |
| Government |
| 0211 |
| Destination |
| Government |
| Destination |
| Government |
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-2 Alt I |
| Inspection Of Supplies Fixed Price (Aug 1996) - Alternate I |
| JUL 1985 |
| 52.246-3 |
| Inspection Of Supplies Cost-Reimbursement |
| MAY 2001 |
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
| 52.246-5 |
| Inspection Of Services Cost-Reimbursement |
| APR 1984 |
| 52.246-11 |
| Higher-Level Contract Quality Requirement |
| FEB 1999 |
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
| 52.246-13 |
| Inspection--Dismantling, Demolition, or Removal of Improvements |
| AUG 1996 |
| 52.246-14 |
| Inspection of Transportation |
| APR 1984 |
| 52.246-15 |
| Certificate of Conformance |
| APR 1984 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
22-DEC-2018
ACC AMIC/DRT
11817 CANON BLVD, STE 306
NEWPORT NEWS VA 23606-4516
(757) 225-3458
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
22-DEC-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2QF04
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-15 Alt I |
| Stop-Work Order (Aug 1989) - Alternate I |
| APR 1984 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-29 |
| F.O.B. Origin |
| FEB 2006 |
| 52.247-30 |
| F.O.B. Origin, Contractor's Facility |
| FEB 2006 |
| 52.247-31 |
| F.O.B. Origin, Freight Allowed |
| FEB 2006 |
| 52.247-32 |
| F.O.B. Origin, Freight Prepaid |
| FEB 2006 |
| 52.247-33 |
| F.O.B. Origin, with Differentials |
| FEB 2006 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.247-35 |
| F.O.B. Destination, Within Consignee's Premises |
| APR 1984 |
| 52.247-36 |
| F.A.S. Vessel, Port of Shipment |
| APR 1984 |
| 52.247-37 |
| F.o.b. Vessel, Port of Shipment |
| APR 1984 |
| 52.247-38 |
| F.o.b. Inland Carrier, Point of Exportation |
| FEB 2006 |
| 52.247-39 |
| F.O.B. Inland Point, Country Of Importation |
| APR 1984 |
| 52.247-40 |
| Ex Dock, Pier, or Warehouse, Point of Importation |
| APR 1984 |
| 52.247-41 |
| C. & F. Destination |
| APR 1984 |
| 52.247-42 |
| C.I.F. Destination |
| APR 1984 |
| 52.247-43 |
| F.o.b. Designated Air Carrier's Terminal, Point of Exportation |
| FEB 2006 |
| 52.247-44 |
| F.o.b. Designated Air Carrier's Terminal, Point of Importation |
| APR 1984 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
| 52.247-59 |
| F.O.B. Origin--Carload and Truckload Shipments |
| APR 1984 |
| 52.247-62 |
| Specific Quantities Unknown |
| APR 1984 |
| 52.247-65 |
| F.O.B. Origin, Prepaid Freight--Small Package Shipments |
| JAN 1991 |
CLAUSES INCORPORATED BY FULL TEXT
52.247-60 GUARANTEED SHIPPING CHARACTERISTICS (DEC 1989)
(a) The offeror is requested to complete subparagraph (a)(1) of this clause, for each part or component which is packed or packaged separately. This information will be used to determine transportation costs for evaluation purposes. If the offeror does not furnish sufficient data in subparagraph (a)(1) of this clause, to permit determination by the Government of the item shipping costs, evaluation will be based on the shipping characteristics submitted by the offeror whose offer produces the highest transportation costs or in the absence thereof, by the Contracting Officer's best estimate of the actual transportation costs. If the item shipping costs, based on the actual shipping characteristics, exceed the item shipping costs used for evaluation purposes, the Contractor agrees that the contract price shall be reduced by an amount equal to the difference between the transportation costs actually incurred, and the costs which would have been incurred if the evaluated shipping characteristics had been accurate.
(1) To be completed by the offeror:
(i) Type of container: Wood Box ___, Fiber Box ___, Barrel ___, Reel ___, Drum ___, Other (Specify)_________
(ii) Shipping configuration: Knocked-down ___, Set-up ___, Nested ___, Other (specify) _________
(iii) Size of container: _________(Length), x _________(Width), x _________(Height) = _________ Cubic FT;
(iv) Number of items per container _________ Each;
(v) Gross weight of container and contents _________ LBS
(vi) Palletized/skidded _________ Yes _________ No;
(vii) Number of containers per pallet/skid _________;
(viii) Weight of empty pallet bottom/skid and sides _________ LBS;
(ix) Size of pallet/skid and contents _________ LBS
Cube _________;
(x) Number of containers or pallets/skids per rail car _________
Size of rail car _________
Type of rail car _________
(xi) Number of containers or pallets/skids per trailer _________
Size of trailer _________ FT
Type of trailer _________
*Number of complete units (contract line item) to be shipped in carrier's equipment.
(2) To be completed by the Government after evaluation but before contract award:
(i) Rate used in evaluation _________;
(ii) Tender/Tariff _________;
(iii) Item _________;
(b) The guaranteed shipping characteristics requested in subparagraph (a)(1) of this clause do not establish actual transportation requirements, which are specified elsewhere in this solicitation. The guaranteed shipping characteristics will be used only for the purpose of evaluating offers and establishing any liability of the successful offeror for increased transportation costs resulting from actual shipping characteristics which differ from those used for evaluation in accordance with paragraph (a) of this clause.
(End of clause)
Section G - Contract Administration Data
PAYMENT INSTRUCTIONS
PAYMENT INSTRUCTIONS
Invoicing will occur IAW PGI clause 252.204-0012 (204.7108(d)(12)) “PAYMENT INSTRUCTIONS (reference DFARS 252.204-0012 and DFARS PGI 204.7108(d)(12)) 252.204-0012 Contract Wide: Other (SEP 2009): The payment office shall make payment “as invoiced” within each line item.”
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1
CROSS-TEAMING
Cross-teaming is a teaming arrangement in which Prime Contractors participate as a subcontractor/team member with another prime or team member/subcontractor and/or subcontracts/teams with more than one Prime Contractor. Any Contractor may, for example, compete to be the prime for one team and a subcontractor for another team. It is the Government’s policy to recognize the integrity and validity of Contractor team arrangements and to not restrict the market, provided the arrangements are identified and company relationships are fully disclosed in an offer or, for arrangements entered into after submission of an offer, before the arrangement becomes effective. The Government will not normally require or encourage the dissolution of Contractor team arrangements.
H-2
ORGANIZATIONAL CONFLICTS OF INTEREST
OCI violations are a significant contract performance issue. Lack of adherence to the OCI Plan or this clause may have serious consequences that may include contract termination, suspension and debarment, or other appropriate remedies or administrative actions. This clause applies to all CN> Operations and Logistics Support task orders.
PROHIBITION: Contractors awarded as Primes under the Program and Programmatic Support ID/IQ contract solicited under W9113M-12-R-0006 by the Department of the Army, US Army Contracting Command-Redstone, US Army Space and Missile Defense Command/Army Forces Strategic Command, Contracting and Acquisition Management Office, are not eligible to propose or perform under this CN> Training Support Services Contract.
The Contractor shall maintain an Organizational Conflict of Interest (OCI) Plan to reduce the likelihood of an actual or perceived OCI. In order to prevent OCI under this contract or any orders issued under this contract, guidance in this clause will apply to eliminate:
a) Conflicting roles which might bias a Contractor's judgment or objectivity
b) An unfair competitive advantage to a Contractor
c) The appearance of an unfair competitive advantage
Parties recognize Contractors will play a very visible and responsible role in fulfilling a broad spectrum of requirements. In that capacity, Contractors may have access to information that is not available to the public, which:
a) may give a Contractor an unfair competitive advantage; and/or
b) Creates an appearance that a Contractor has an unfair competitive advantage even if no such advantage actually exists.
The technical judgment of a Contractor will often influence the systems, training, services, policy or guidance adopted by the Air Force, and a Contractor may play a key technical review role over other Contractors' work. Both the Government and all Contractors must have the utmost confidence that acquisitions are fair and that a Contractor's judgment and recommendations are objective, impartial, and independent. To avoid, neutralize, or mitigate a potential conflict of interest, the Contractor shall not, during performance of the contract, engage (as a Prime Contractor, subcontractor, supplier, or consultant) in any task order that would design, develop, implement, operate, or sustain any system or deliverable that is based on a recommended solution provided under a task order without an OCI Plan that has been approved by the Procurement Contracting Officer.
Contractors who manufacture Air Force systems or subsystems shall not be allowed to submit proposals on any task orders that involve, impact, or relate to those systems or related subsystems.
If a Contractor performing on a CN> Training Support Services task order assists in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be ineligible to participate in any competition for CN> Training Support Services task orders described within those requirements documents.
When performing work under this contract requires or involves access to competition sensitive information as well as possible access to proprietary technical data of other companies disclosed to the Contractor in confidence, the Contractor is required to protect such data from unauthorized use or disclosure so long as it remains proprietary. The Contractor shall be cognizant of disclosure of other Contractors' and/or Government proprietary information, including procurement sensitive information; and of restrictions on participating in development of, and then bidding on resultant requirement. For example, the Contractor may be required to perform studies that directly impact future Government requirements. In support of these studies, the Contractor may have access to certain proprietary information and data. As a result, the Contractor is precluded from working on any CN> Training Support Services task order as a Prime or subcontractor or from acting as a consultant to other Contractors for those programs resulting from the recommendations of these studies. The Contractor further agrees to: (1) protect all proprietary information; and (2) refrain from using the information for any purpose other than that to which it was furnished. The Contractor shall immediately disclose to the Contracting Officer knowledge of any prohibited or attempted use of proprietary information. The Government shall not be liable for any cost/loss resulting from the unauthorized use or disclosure of third party data by the Contractor, its employees, subcontractors, or agents.
The Contractor must thoroughly and formally educate employees on the philosophy of FAR Subpart 9.5 so that employees are disciplined in the absolute necessity of refraining from divulging proprietary data, trade secrets, confidential information or restricted data from other companies received in connection with work under this contract to any unauthorized person.
The Contractor shall require each employee engaged in any effort connected with this contract to sign a written agreement prohibiting proprietary information disclosure. This written agreement shall demonstrate that the employee will not, during their employment by the Contractor or thereafter, disclose to others or use for their own behalf, proprietary or company private information, trade secrets, confidential information, or restricted data received in connection with the work under this contract. The agreement will acknowledge the employee is trained regarding handling proprietary information and discuss penalties for violations. In addition, the agreement shall include that employees agree to prevent disclosure of such information to other Contractor employees who have no need to know the information in performance of this contract. Each employee must also agree not to accept any gratuity from any potential Government Contractors. The Contractor also agrees to adhere, as an entity, to these requirements.
The Contractor agrees to accept, and pursue to completion, all tasks identified hereunder and to ensure that its parents, subsidiaries, and affiliates do not enter into contractual agreements as Prime Contractors or first tier subcontractors which would create a conflict within the meaning of this clause, except as follows: If performance of a task could cause a conflict of interest within the meaning of this clause with a contract or subcontract held by the Contractor, its parent, subsidiaries or affiliates, which pre-existed the identification of the task to the Contractor, the Contractor must disclose the conflict of interest to the Contracting Officer. If the Contracting Officer confirms that the conflict exists, the parties will consider the alternatives available to eliminate the conflict and mutually resolve it considering the relative burdens created by the prospective solutions.
The Contractor agrees that organizations merely cooperating with the Contractor (e.g., providing information) to enable the Contractor or its agents to perform shall not be deemed as merely "participating" but shall be bound as though they are the "Contractor". This provision shall be incorporated in a manner to insure that such organizations, and their parents, subsidiaries, and affiliates, shall also be bound in all subcontracts, teaming arrangements, and other agreements calling for performance of any requirements under this contract.
If the Contractor discovers an actual or potential organizational conflict of interest not previously considered and adequately mitigated under this clause and the Government-approved OCI Plan, the Contractor shall make a prompt and full disclosure in writing to the Contracting Officer. This report shall include a description of the violation and the actions the Contractor has taken or proposes to take to mitigate and avoid repetition of the violation. The Contractor shall routinely monitor its proposed business development and shall discuss any real or perceived OCI issues with the Contracting Officer and affected customers to proactively resolve and/or mitigate those potential OCI issues. After full analysis, the Contracting Officer and the Contractor will agree on appropriate corrective action, if any, or the Contracting Officer will direct such action, subject to the terms of this contract.
H-3
CONTRACTING OFFICER AUTHORITY
Procurement Contracting Officer (PCO) responsibilities for this contract shall reside at Headquarters Air Combat Command Acquisition Management and Integration Center, currently at 11817 Canon Blvd, Newport News, VA. The PCO is the only person authorized to approve changes in any of the requirements under this contract and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the PCO. The PCO may delegate limited Contracting Officer authority to other personnel designated as Administrative Contracting Officers (ACO) to streamline the process of contract administration and administration of T/Os under this MA ID/IQ contract. In these cases, the authority of the ACO will be clearly delineated in a delegation of authority letter. A copy of the letter will be forwarded to the Contractor.
H-4 INCORPORATION OF PROPOSAL
Proposals submitted in response to the ID/IQ and/or T/O solicitations will be evaluated on individual merit and the overall benefit to the Government. The Offeror’s proposal is a representation of its ability to perform the duties outlined in the solicitation. If the Government identifies a significant aspect of a successful Offeror’s proposal at the T/O level, the Government reserves the right to incorporate those unique areas deemed beneficial to the Government into the T/O contract.
H-5 ACCOUNTING SYSTEM
The Contractor shall maintain an accounting system that is adequate for determining and segregating costs applicable to this contract, when necessary. In support of those reporting requirements, the Contractor must maintain and utilize an accounting system capable of tracking workload as indicated in Sections B and G. Failure to maintain an adequate accounting system or approved purchasing system may negatively impact a Contractor’s ability to propose on T/O requirements and the Contractor performance ratings, and may serve as justification for removal from the CN> Training Support Services ID/IQ contract. NOTE: An approved purchasing system may be required for task orders based on the complexity, dollar value and subcontracting involvement of the task order requirement in accordance with FAR Part 44.
H-6
ASSOCIATE CONTRACTOR AGREEMENTS
The Contractor shall enter into Associate Contractor Agreements (ACA) for any portion of the contract requiring joint participation in accomplishment of a Government requirement as specified in individual T/Os or between a T/O and another contract / contract vehicle. ACAs shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to interaction of the CN> Training Support Services program, which shall ensure the greatest degree of cooperation to meet the terms of the contract. Associate Contractor information identified below shall be provided for individual T/Os, as required.
· Identify Associate Contractors and their relationships
· Identify program(s) involved and relevant Government contracts of any Associate Contractor(s)
· Describe Associate Contractor interfaces by general subject matter
· Specify categories of information to be exchanged / support to be provided
· Include ACA expiration date / event)
· Identify potential conflicts between relevant Government contracts and the ACA; include agreements on protection of proprietary data and restrictions on employees
The cooperating Contactors shall provide a copy of such agreement to the Contracting Officer for review before execution of the document.
The Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an Associate Contractor. However, the Government may assist the Contractor in the event of non-responsiveness from an Associate Contractor.
Liability for improper disclosure of any proprietary data contained in or referenced by any ACA shall rest with the parties to the agreement, and not the Government.
All costs associated with an ACA are included in the negotiated cost of this contract. Agreements may be amended as required by the Government during the performance of this contract.
The following Contractors are associate Contractors with whom agreements are required:
CONTRACTOR
ADDRESS
PROGRAM/CONTRACT
To be specified based on relationships that exist after award of the CN> Training Support Services contract.
H-7
OTHER TERMS AND CONDITIONS CONCERNING TASK ORDERS
(a) Contract Clauses: All contract clauses in the ID/IQ contract will apply at the T/O level, as applicable. Any unique clauses that may apply to an individual T/O may be included as determined by the local ordering office.
(b) Contract Provisions: The following provisions may apply at the T/O level, as required:
52.215-22 Limitations on Pass-Through Charges—Identification of Subcontract Effort (Oct 2009).
52.219-14 Limitations on Subcontracting (Dec 1996)
(c) Task Order Cost/Price Factor: The Government may ask for a breakout of cost elements for each T/O solicitation, regardless of contract type. The level of detail will be prescribed in each T/O solicitation.
(d) Task Order Pool of Offerors Eligible for Evaluation: For efficiency purposes at the T/O level, the Government may reduce the pool of Offerors eligible for evaluation. For instance, the Government may only evaluate the three lowest priced proposals for the applicable requirement, in addition to any proposals within 10% of the average of the three lowest priced proposals. The specifics will be addressed in each T/O RFP.
(e) Option to Extend Services: T/Os may contain FAR Clause 52.217-8, entitled “Option to Extend Services.” This clause allows for up to an additional 6 month continued T/O performance if required. At the T/O level, 50% of each T/O’s last option period may be used for pricing if clause 52.217-8 is utilized. When that is the case, Offerors shall not propose pricing for this clause unless otherwise specified in the T/O RFP.
(f) Close-outs:
1. General Close-out Conditions. The Government will make every attempt to close out contracts in a timely manner. To expedite this process the Government will work with Contractors to ‘close out’ each contract year after the end of each contract year period of performance.
2. Cost Type Contract Close-out. T/Os will be closed out on an individual basis, upon agreement of final indirect rates for the period of performance of the T/O. The Contractor shall forward the final voucher directly to the cognizant DCAA for final audit. DCAA will forward the voucher and the final audit to the cognizant Contracting Office, which will process it for final payment and submit it to the paying office.
(g) Remedies for Breach by the Government: Contractor's sole and exclusive remedy for breach by the Government shall be termination for convenience damages, T/O proposal preparation costs, T/O award and/or reinstatement, if deemed feasible by the Government in its sole discretion. In no event shall the Government be liable to the Contractor for expectancy damages, including but not limited to lost profits, or consequential damages resulting from breach of this contract.
| 52.234-4 |
| Earned Value Management System |
| MAY 2014 |
Section I - Contract Clauses
AFGHANISTAN CLAUSES (TBC)
LOCAL INSTRUCTIONS
5152.222-5900 - PROHIBITION AGAINST HUMAN TRAFFICKING, INHUMANE LIVING CONDITIONS, AND WITHHOLDING OF EMPLOYEE PASSPORTS (AUG 2011)
5152.223-5900 - REPORTING KIDNAPPINGS, SERIOUS INJURIES AND DEATHS (AUG 2011)
5152.225-5900 - ARMING REQUIREMENTS AND PROCEDURES FOR PERSONAL SECURITY SERVICES CONTRACTORS AND FOR REQUESTS FOR PERSONAL PROTECTION
5152.225-5901 - ARMED PERSONNEL INCIDENT REPORTS
5152.225-5902 - FITNESS FOR DUTY AND MEDICAL/DENTAL CARE LIMITATIONS (DEC 2011)
5152.225-5903 - COMPLIANCE WITH LAWS AND REGULATIONS (DEC 2011)
5152.225-5904 - MONTHLY CONTRACTOR CENSUS REPORTING 48 (DEC 2011)
5152.225-5905 - CONTRACT DELIVERY REQUIREMENTS (AUG 2011)
5152.225-5906 - SHIPPING INSTRUCTION FOR WEAPONS (AUG 2011)
5152.225-5907 - MEDICAL SCREENING AND VACCINATION REQUIREMENTS FOR CONTRACTOR EMPLOYEES OPERATING IN THE CENTCOM AREA OF RESPONSIBILITY (AOR) (DEC 2011)
5152.225-5908 - GOVERNMENT FURNISHED CONTRACTOR SUPPORT (MAY 2012)
5152.225-5910 - CONTRACTOR HEALTH AND SAFETY (DEC 2011)
252.225-7998 - CONTRACTOR DEMOBILIZATION (DEVIATION 2013-O0017) (AUGUST 2013)
5152.225-5914 - COMMODITY SHIPPING INSTRUCTIONS (AUG 2011)
5152.225-5915 - CONTRACTOR ACCOUNTABILITY AND PERSONNEL RECOVERY (AUG 2011)
5152.247-5900 - INBOUND/OUTBOUND CARGO AND CONTRACTOR EQUIPMENT CENSUS
252-232-7999 - NOTIFICATION OF PAYMENT IN LOCAL CURRENCY (AFGHANISTAN) (APR 2013) (DEVIATION 2013-O0011)
5152.232-5900 - PAYMENT IN LOCAL CURRENCY (DEC 2011)
5152.236-5900 - ELECTRICAL AND STRUCTURAL BUILDING STANDARDS FOR CONSTRUCTION PROJECTS (DEC 2011)
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| APR 2010 |
| 52.203-15 |
| Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 |
| JUN 2010 |
| 52.203-16 |
| Preventing Personal Conflicts of Interest |
| DEC 2011 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-7 |
| System for Award Management |
| JUL 2013 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| JUL 2013 |
| 52.204-13 |
| System for Award Management Maintenance |
| JUL 2013 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| AUG 2013 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| MAY 2012 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-10 |
| Price Reduction for Defective Certified Cost or Pricing Data |
| AUG 2011 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-12 |
| Subcontractor Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-16 |
| Facilities Capital Cost of Money |
| JUN 2003 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions |
| JUL 2005 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-20 |
| Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-22 |
| Limitations on Pass-Through Charges--Identification of Subcontract Effort |
| OCT 2009 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.216-7 Alt II |
| Allowable Cost and Payment (Jun 2013) - Alternate II |
| AUG 2012 |
| 52.216-8 |
| Fixed Fee |
| JUN 2011 |
| 52.216-10 |
| Incentive Fee |
| JUN 2011 |
| 52.216-16 |
| Incentive Price Revision-Firm Target |
| OCT 1997 |
| 52.216-17 |
| Incentive Price Revision-Successive Targets |
| OCT 1997 |
| 52.216-27 |
| Single or Multiple Awards |
| OCT 1995 |
| 52.217-4 |
| Evaluation Of Options Exercised At The Time Of Contract Award |
| JUN 1988 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2014 |
| 52.219-9 |
| Small Business Subcontracting Plan |
| OCT 2014 |
| 52.219-9 (Dev) |
| Small Business Subcontracting Plan (Deviation 2013-O0014) |
| OCT 2014 |
| 52.219-14 |
| Limitations On Subcontracting |
| NOV 2011 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-2 |
| Payment For Overtime Premiums |
| JUL 1990 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-29 |
| Notification Of Visa Denial |
| JUN 2003 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| JUL 2014 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| JUL 2014 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-43 |
| Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (Multiple Year And Option Contracts) |
| MAY 2014 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.222-50 Alt I |
| Combating Trafficking in Persons (Aug 2007) Alternate I |
| AUG 2007 |
| 52.222-54 |
| Employment Eligibility Verification |
| AUG 2013 |
| 52.223-3 |
| Hazardous Material Identification And Material Safety Data |
| JAN 1997 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-10 |
| Waste Reduction Program |
| MAY 2011 |
| 52.223-12 |
| Refrigeration Equipment and Air Conditioners |
| MAY 1995 |
| 52.223-15 |
| Energy Efficiency in Energy-Consuming Products |
| DEC 2007 |
| 52.223-16 |
| Acquisition of EPEAT -Registered Personal Computer Products |
| JUN 2014 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.223-19 |
| Compliance with Environmental Management Systems |
| MAY 2011 |
| 52.224-1 |
| Privacy Act Notification |
| APR 1984 |
| 52.224-2 |
| Privacy Act |
| APR 1984 |
| 52.225-4 Alt I |
| Buy American--Free Trade Agreement--Israeli Trade Act Certificate (MAY 2014) Alternate I |
| MAY 2014 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-14 |
| Inconsistency Between English Version And Translation Of Contract |
| FEB 2000 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications. |
| DEC 2012 |
| 52.228-3 |
| Worker's Compensation Insurance (Defense Base Act) |
| JUL 2014 |
| 52.228-4 |
| Workers' Compensation and War-Hazard Insurance Overseas |
| APR 1984 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.228-7 |
| Insurance--Liability To Third Persons |
| MAR 1996 |
| 52.228-9 |
| Cargo Insurance |
| MAY 1999 |
| 52.229-1 |
| State and Local Taxes |
| APR 1984 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.229-6 |
| Taxes--Foreign Fixed-Price Contracts |
| FEB 2013 |
| 52.229-8 |
| Taxes--Foreign Cost-Reimbursement Contracts |
| MAR 1990 |
| 52.230-2 |
| Cost Accounting Standards |
| MAY 2014 |
| 52.230-3 |
| Disclosure And Consistency Of Cost Accounting Practices |
| MAY 2014 |
| 52.230-4 |
| Disclosure and Consistency of Cost Accounting Practices -- Foreign Concerns |
| MAY 2014 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-3 |
| Payments under Personal Services Contracts |
| APR 1984 |
| 52.232-4 |
| Payments Under Transportation Contracts and Transportation-Related Services Contracts |
| APR 1984 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| MAY 2014 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-10 |
| Payments under Fixed-Price Architect-Engineer Contracts |
| APR 2010 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
| 52.232-20 |
| Limitation Of Cost |
| APR 1984 |
| 52.232-22 |
| Limitation Of Funds |
| APR 1984 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 |
| Prompt Payment |
| JUL 2013 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| JUL 2013 |
| 52.232-34 |
| Payment By Electronic Funds Transfer--Other Than System for Award Management |
| JUL 2013 |
| 52.232-35 |
| Designation of Office for Government Receipt of Electronic Funds Transfer Information |
| JUL 2013 |
| 52.232-36 |
| Payment by Third Party |
| MAY 2014 |
| 52.232-37 |
| Multiple Payment Arrangements |
| MAY 1999 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-3 |
| Continuity Of Services |
| JAN 1991 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-2 |
| Production Progress Reports |
| APR 1991 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| MAY 2014 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.243-1 Alt I |
| Changes--Fixed Price (Aug 1987) - Alternate I |
| APR 1984 |
| 52.243-1 Alt II |
| Changes--Fixed-Price (Aug 1987) - Alternate II |
| APR 1984 |
| 52.243-2 |
| Changes--Cost-Reimbursement |
| AUG 1987 |
| 52.243-2 Alt I |
| Changes--Cost-Reimbursement (Aug 1987) - Alternate I |
| APR 1984 |
| 52.243-2 Alt II |
| Changes--Cost Reimbursement (Aug 1987) - Alternate II |
| APR 1984 |
| 52.244-2 |
| Subcontracts |
| OCT 2010 |
| 52.244-2 Alt I |
| Subcontracts (Oct 2010) - Alternate I |
| JUN 2007 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| OCT 2014 |
| 52.245-1 |
| Government Property |
| APR 2012 |
| 52.245-1 Alt I |
| Government Property (Apr 2012) Alternate I |
| APR 2012 |
| 52.245-2 |
| Government Property Installation Operation Services |
| APR 2012 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 52.249-1 |
| Termination For Convenience Of The Government (Fixed Price) (Short Form) |
| APR 1984 |
| 52.249-1 Alt I |
| Termination for Convenience of the Government (Fixed-price) (Short Form) (Apr 1984) - Alternate I |
| APR 1984 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-4 |
| Termination For Convenience Of The Government (Services) (Short Form) |
| APR 1984 |
| 52.249-5 |
| Termination For Convenience Of The Government (Educational And Other Nonprofit Institutions) |
| SEP 1996 |
| 52.249-6 |
| Termination (Cost Reimbursement) |
| MAY 2004 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.249-12 |
| Termination (Personal Services) |
| APR 1984 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.250-1 |
| Indemnification Under Public Law 85-804 |
| APR 1984 |
| 52.250-1 Alt I |
| Indemnification Under Public Law 85-804 (Apr 1984) - Alternate I |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| DEC 2012 |
| 252.203-7004 |
| Display of Fraud Hotline Poster(s) |
| DEC 2012 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7005 |
| Oral Attestation of Security Responsibilities |
| NOV 2001 |
| 252.204-7012 |
| Safeguarding of Unclassified Controlled Technical Information |
| NOV 2013 |
| 252.204-7013 |
| Limitations on the Use or Disclosure of Information by Litigation Support Solicitation Offerors |
| FEB 2014 |
| 252.204-7014 |
| Limitations on the Use or Disclosure of Information by Litigation Support Contractors |
| FEB 2014 |
| 252.204-7015 |
| Disclosure of Information to Litigation Support Contractors |
| FEB 2014 |
| 252.209-7001 |
| Disclosure of Ownership or Control by the Government of a Terrorist Country |
| JAN 2009 |
| 252.209-7002 |
| Disclosure Of Ownership Or Control By A Foreign Government |
| JUN 2010 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country |
| MAR 2014 |
| 252.209-7008 |
| Notice of Prohibition Relating to Organizational Conflict of Interest--Major Defense Acquisition Program |
| DEC 2010 |
| 252.209-7009 |
| Organizational Conflict of Interest--Major Defense Acquisition Program |
| DEC 2012 |
| 252.209-7010 |
| Critical Safety Items |
| AUG 2011 |
| 252.209-7993 (Dev) |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law -- Fiscal Year 2014 Appropriations (Deviation) |
| FEB 2014 |
| 252.209-7994 |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law -- Fiscal Year 2014 Appropriations (Deviation) |
| OCT 2013 |
| 252.209-7995 (Dev) |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or Felony Conviction under Federal Law- Fiscal Year 2013 Appropriations |
| APR 2013 |
| 252.209-7996 (Dev) |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law - DoD Military Construction Appropriations. |
| JAN 2013 |
| 252.209-7997 (Dev) |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law - DoD Appropriations |
| JAN 2013 |
| 252.209-7998 (Dev) |
| Representation Regarding Conviction of a Felony Criminal Violation under any Federal or State Law |
| MAR 2012 |
| 252.209-7999 (Dev) |
| Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law (Deviation) |
| JAN 2012 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 2012 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.216-7003 |
| Economic Price Adjustment - Wage Rates or Material Prices Controlled by a Foreign Government |
| MAR 2012 |
| 252.216-7006 |
| Ordering |
| MAY 2011 |
| 252.216-7008 |
| Economic price adjustment--wage rates or material prices controlled by a foreign government--representation |
| MAR 2012 |
| 252.216-7010 |
| Requirements -- Basic |
| APR 2014 |
| 252.217-7003 |
| Changes |
| DEC 1991 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts) |
| OCT 2014 |
| 252.219-7003 (Dev) |
| Small Business Subcontracting Plan (DOD Contracts) (Deviation 2013-O0014) |
| OCT 2014 |
| 252.222-7002 |
| Compliance With Local Labor Laws (Overseas) |
| JUN 1997 |
| 252.223-7001 |
| Hazard Warning Labels |
| DEC 1991 |
| 252.223-7002 |
| Safety Precautions For Ammunition And Explosives |
| MAY 1994 |
| 252.223-7003 |
| Changes In Place Of Performance--Ammunition And Explosives |
| DEC 1991 |
| 252.223-7004 |
| Drug Free Work Force |
| SEP 1988 |
| 252.223-7007 |
| Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives |
| SEP 1999 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2012 |
| 252.225-7003 |
| Report of Intended Performance Outside the United States and Canada--Submission with Offer |
| OCT 2010 |
| 252.225-7004 |
| Report of Intended Performance Outside the United States and Canada--Submission after Award |
| OCT 2010 |
| 252.225-7005 |
| Identification Of Expenditures In The United States |
| JUN 2005 |
| 252.225-7006 |
| Quarterly Reporting of Actual Contract Performance Outside the United States |
| OCT 2010 |
| 252.225-7007 |
| Prohibition on Acquisition of United States Munitions List Items from Communist Chinese Military Companies |
| SEP 2006 |
| 252.225-7008 |
| Restriction on Acquisition of Specialty Metals |
| MAR 2013 |
| 252.225-7009 |
| Restriction on Acquisition of Certain Articles Containing Specialty Metals |
| OCT 2014 |
| 252.225-7031 |
| Secondary Arab Boycott Of Israel |
| JUN 2005 |
| 252.225-7040 |
| Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United States |
| MAY 2014 |
| 252.225-7041 |
| Correspondence in English |
| JUN 1997 |
| 252.225-7042 |
| Authorization to Perform |
| APR 2003 |
| 252.225-7043 |
| Antiterrorism/Force Protection Policy for Defense Contractors Outside the United States |
| MAR 2006 |
| 252.225-7044 |
| Balance of Payments Program--Construction Material--Basic (Nov 2014) |
| NOV 2014 |
| 252.225-7045 |
| Balance of Payments Program--Construction Material Under Trade Agreements--Basic (Nov 2014) |
| NOV 2014 |
252.225-7045 Alt I 252.225-7048 Balance of Payments Program--Construction Material Under Trade Agreements--Alternate I (Nov 2014) Export Controlled Items
NOV 2014
JUN 2013
| 252.225-7986 (Dev) |
| Medical Care and Evacuation of Contractor Personnel in the Designated Operational Area for Operation United Assistance (DEVIATION 2015-O0002) |
| NOV 2014 |
| 252.225-7988 (Dev) |
| Acquisition of the American Flag (Deviation) |
| FEB 2014 |
| 252.225-7993 (Dev) |
| Prohibition on Contracting with the Enemy (Deviation) |
| SEP 2014 |
| 252.225-7994 (Dev) |
| Additional Access to Contractor and Subcontractor Records in the United States Central Command Theater of Operations (Deviation) |
| SEP 2014 |
| 252.225-7995 (Dev) |
| Contractor Personnel Performing in the United States Central Command Area of Responsibility (Deviation) |
| JUL 2014 |
| 252.225-7999 (Dev) |
| Requirement for Products or Services from Central Asia, Pakistan, the South Caucasus, or Afghanistan (Deviation) |
| APR 2014 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7006 |
| Wide Area WorkFlow Payment Instructions |
| MAY 2013 |
| 252.232-7007 |
| Limitation Of Government's Obligation |
| APR 2014 |
| 252.232-7008 |
| Assignment of Claims (Overseas) |
| JUN 1997 |
| 252.233-7001 |
| Choice of Law (Overseas) |
| JUN 1997 |
| 252.234-7001 |
| Notice of Earned Value Management System |
| APR 2008 |
| 252.234-7002 |
| Earned Value Management System |
| MAY 2011 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7001 |
| Contract Drawings, and Specifications |
| AUG 2000 |
| 252.236-7002 |
| Obstruction of Navigable Waterways |
| DEC 1991 |
| 252.236-7003 |
| Payment for Mobilization and Preparatory Work |
| JAN 1997 |
| 252.236-7004 |
| Payment for Mobilization and Demobilization |
| DEC 1991 |
| 252.236-7005 |
| Airfield Safety Precautions |
| DEC 1991 |
| 252.236-7006 |
| Cost Limitation |
| JAN 1997 |
| 252.236-7007 |
| Additive or Deductive Items |
| DEC 1991 |
| 252.236-7008 |
| Contract Prices-Bidding Schedules |
| DEC 1991 |
| 252.236-7009 |
| Option for Supervision and Inspection Services |
| DEC 1991 |
| 252.236-7010 |
| Overseas Military Construction--Preference for United States Firms |
| JAN 1997 |
| 252.236-7011 |
| Overseas Architect-Engineer Services--Restriction to United States Firms |
| JAN 1997 |
| 252.236-7012 |
| Military Construction on Kwajalein Atoll--Evaluation Preference |
| MAR 1998 |
| 252.236-7013 |
| Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers |
| JUN 2013 |
| 252.242-7004 |
| Material Management And Accounting System |
| MAY 2011 |
| 252.242-7005 |
| Contractor Business Systems |
| FEB 2012 |
| 252.242-7006 |
| Accounting System Administration |
| FEB 2012 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
This is the start of the file's text. The full file is on GovTribe.