PWS_Atch_2_-_Trip_Report.pdf

PDF 154 KB Posted

Attached to
AOC NAF/SME Federal contract opportunity
Solicitation number
FA4890-13-R-0112
Issued by
Department of the Air Force Air Combat Command

About this file

PWS Attachment 2 - Trip Report

View the file

Other files for this federal contract opportunity

Other files attached to AOC NAF/SME, newest first.
File Type Posted
Award_Synopsis.doc DOC document
Amendment_0004.pdf PDF
PWS_Page_14.pdf PDF
Q A_Part_4_(15Jan14).pdf PDF
PWS_Rev_(8_Jan_14).pdf PDF
Q A_Part_3_(8Jan14).pdf PDF
Atch_3_-Pricing_Schedule.xlsx XLSX spreadsheet
Amendment_0003.pdf PDF
Q A_Part_2_Dec_13.docx DOCX document
Amendment_0002.doc DOC document
AOC_Pre_Proposal_Slides_Final.pptx PPTX presentation
AOC_Pre_Proposal_Sign_In_Sheet.pdf PDF
AOC_QAs_as_of_20_Dec_13.pdf PDF
AFFARS_Policy_Memo_13-C-03.pdf PDF
Amendment_0001.pdf PDF
PWS_Rev_(20Dec13).pdf PDF
FA4890-13-R-0112_(Final).doc DOC document
Atch_1_-_PWS_Final__(26_Oct_13).pdf PDF
PWS_Atch_1_-_Monthly_Progress_Report.pdf PDF
Atch_3_-Pricing_Schedule.xlsx XLSX spreadsheet
Atch_2_-_DD254.pdf PDF
DD254_Draft _5_Nov_13.pdf PDF
Trip_Report.pdf PDF
Monthly_Progress_Report.pdf PDF
Draft_PWS _Rev_3_(26_Sep_13).pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD MMM YYYY

MEMORANDUM FOR ACC/A3CT

FROM: Name and title

SUBJECT: FA4890-XX-X-00XX - Trip Report – Trip # OY4-014

1. PURPOSE. Complete User Validation Tests on the newest release of the Strategic Worldwide

Integration Capability (SWIC) 1.5.4 software.

2. TRAVELER(S).

3. ITINERARY. ISS Facility, Colorado Springs, CO, 17-22 March 2013

4. DISCUSSION. Initially there were five users making the trip but sequester cut the number to two users and myself. This not only increased the workload but the need for training in additional areas. As a group we found 20+ issues with the thick client and requested numerous changes and additions to the new web app. ISS was able to fix every issue we found. Most fixes were accomplished immediately. The few not fixed immediately were done by the time we came in the next morning.

Most of my time was spent working with John Doe and Joan Doe on permission issues. The roles need to be reworked to fit the unique circumstances we have at the 608th AOC. We do not have traditional ATO replanners and executors. The lines between these roles are blurred. Luckily there are tools within SWIC to help me quickly determine what permissions are needed for a specific action. My goal now is to sit with our users and lock down the roles before SWIC 1.5.4 is installed. I will send these new roles to ISS to be included in the SWIC build software.

5. CONCLUSIONS/RECOMMENDATIONS. Despite having less than half of the users initially scheduled for the trip, the test was still a complete success. I feel we have a product that will meet our both our current and future needs at the 608th AOC. The knowledge and experience I took away from the test will help me better support the AOC.

NAME

608 AOC/C2 Systems Administrator

File details come from the government source that posted it. Updated .