DRAFT_AOC_Trip_Report.pdf

PDF 150 KB Posted

Attached to
AOC NAF/SME Federal contract opportunity
Solicitation number
FA4890-13-R-0112
Issued by
Department of the Air Force Air Combat Command

About this file

DRAFT AOC Trip Report

View the file

Other files for this federal contract opportunity

Other files attached to AOC NAF/SME, newest first.
File Type Posted
AOC_NAF_SME_Questions_and_Answers_from_Sources.pdf PDF
DRAFT_AOC_NAF_SME_PWS_09_May_2013.pdf PDF
DRAFT_AOC_Monthly_Progress_Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD MMM YYYY

MEMORANDUM FOR ACC/A3CT

FROM: Name and title

SUBJECT: FA4890-XX-X-00XX - Trip Report – Trip # OY4-014

1. PURPOSE. Complete User Validation Tests on the newest release of the Strategic Worldwide

Integration Capability (SWIC) 1.5.4 software.

2. TRAVELER(S).

3. ITINERARY. ISS Facility, Colorado Springs, CO, 17-22 March 2013

4. DISCUSSION. Initially there were five users making the trip but sequester cut the number to two users and myself. This not only increased the workload but the need for training in additional areas. As a group we found 20+ issues with the thick client and requested numerous changes and additions to the new web app. ISS was able to fix every issue we found. Most fixes were accomplished immediately. The few not fixed immediately were done by the time we came in the next morning.

Most of my time was spent working with John Doe and Jon Doe on permission issues. The roles need to be reworked to fit the unique circumstances we have at the 608th AOC. We do not have traditional ATO replanners and executors. The lines between these roles are blurred. Luckily there are tools within SWIC to help me quickly determine what permissions are needed for a specific action. My goal now is to sit with our users and lock down the roles before SWIC 1.5.4 is installed. I will send these new roles to ISS to be included in the SWIC build software.

5. CONCLUSIONS/RECOMMENDATIONS. Despite having less than half of the users initially scheduled for the trip, the test was still a complete success. I feel we have a product that will meet our both our current and future needs at the 608th AOC. The knowledge and experience I took away from the test will help me better support the AOC.

NAME

608 AOC/C2 Systems Administrator

File details come from the government source that posted it. Updated .