RFI Response - Average Parts Per Year.pdf
PDF 32 KB Posted
- Attached to
- Hangar and Roll Up Door Maintenance
- Solicitation number
- FA488726Q0021
About this file
This document is a parts and maintenance requirements schedule for door systems maintenance. The schedule outlines the average annual quantity of replacement parts and components required for two door type categories: roll-up doors and hangar doors.
For roll-up doors, the maintenance requirements total 22 parts per year and include operators (2), springs (2), cables and clamps (1), stops (2), chain hoists/sprockets (2), safety edges (3), wire coils (2), push buttons (2), weatherstripping (2), locks (1), and rewired deadman switches (2). For hangar doors, the maintenance requirements total 6 parts per year and include operators (1), rollers (1), strobe lights (1), safety horns (1), weatherstripping (1), and limit switches (1). The combined total maintenance requirement across both door types is 27 parts per year. This schedule appears to support planning for ongoing maintenance and repair services for door systems, likely at a federal facility or installation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
door type parts avg per year roll up doors operator 2 springs 2 cables clamps 1 stops 2 chain hoist/sprocket 2 safety edges 3 wire coils 2 push buttons 2 weatherstripping 2 locks 1 rewire deadmans switch 2
Hangar doors operator 1 rollers 1 strob light 1 safety horn 1 weatherstripping 1 limit switches 1 average parts per year
File details come from the government source that posted it. Updated .