RFI log - Fence 1 Sept 2020.xlsx

XLSX spreadsheet 218 KB Posted

Attached to
Perimeter fence extension and EOD fences Federal contract opportunity
Solicitation number
FA488720Q0059
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Perimeter fence extension and EOD fences, newest first.
File Type Posted
RFI log - Fence 2 Sept 2020.xlsx XLSX spreadsheet
Solicitation Amendment FA488720Q00590002 SF 30.pdf PDF
Solicitation Amendment FA488720Q00590001 SF 30.pdf PDF
Attachment 4 - Wage determination 08212020.txt TXT text file
RFI Log.xlsx XLSX spreadsheet
Attachment 1 - SOW-FENCE EXTENSION v2.docx DOCX document
Solicitation - FA488720Q0059.pdf PDF
Attachment 4 - wage determination 06052020.pdf PDF
Attachment 7 - Fencing for pro range.jpg JPG image
Attachment 6 - EOD FENCE Plan B951.pdf PDF
Attachment 3 - SOW-EOD FENCE v2.docx DOCX document
Attachment 2 - SOW-EOD PERIMETER FENCE v2.docx DOCX document
Attachment 8 - SPRS color legend.docx DOCX document
Attachment 5 - South EOR Detailed Fence Aug 2020 v2.jpg JPG image
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REQUEST FOR INFORMATION LOG
CONTRACT #:PROJECT # / TITLE:OP1065032 Gila Bend ADP
TO BE COMPLETED BY CONTRACTORTO BE COMPLETED BY GOVERNMENT
RFI #DATEDOCUMENTSHEET / PAGE / PARADISCIPLINEQUESTION / ISSUERESPONSE DATERESPONSEPOC
OFFICE SYMNAME
00131-Aug-20Each of the attachments describes most of the requirements for the fences 7 gates for each particular area, however, is there a particular Standard Fence & Gate Specs we need to adhere to on top of the stated requirements, like it is usually the case on military fencing?No specific standard or specs to follow. Only height requirements per each SOW.56 CONSJensen
00231-Aug-20Confirm no landscaping is required for this contract.Yes landcaping is required where the trench from electrical panel56 CESLandford
00331-Aug-20Will 100% grading to even elevation required or will rough grade by bucket be acceptable?rough grading will be ok.56 CESLandford
00431-Aug-20Will any signs need to be installed on the fence as part of this project?All signs will be installed by 56 CES56 CESLandford
00531-Aug-20Will all new fencing receive single or double security cabling as detailed in MILHDBK-1013?single56 CESLandford
00631-Aug-20Will cable reinforcing be required on the new chain link fence?YES cable reinforcing will be required56 CESLandford
00731-Aug-20Is cable reinforcing required on the gates?No
00831-Aug-20Is grounding required on the new chain link fence? If cable is required on the fence, there is no grounding detail for the cable. Please provide.No grounding necessary56 CESLandford
00931-Aug-20Are there are security/access requirements for this project?Only security requirements is passes to be able to work on base56 CESLandford
01031-Aug-20Are there any specific permits/coordination needed with Security Forces for this project?no56 CESLandford
01131-Aug-20Does the chain link need to be galvanized?yes56 CESLandford
01231-Aug-20Will 50-lb test be required on new fence?No56 CESLandford
01331-Aug-20Will the base handle the blue staking if an AF-103 dig permit is submitted?yes the state will handle the AF-103 and blue stake56 CESLandford
01431-Aug-20Is temp fence or barricading required for this project?No for 951 Pro Range will need a temp fence of fence constructed inside or outside of fence already there so range is 100% secured at all times
01531-Aug-20Is a project sign required for this project?No sign required56 CESLandford
01631-Aug-20EOD Fence Plan drawing shows boulders. Are contractors to supply and install boulders as part of this project?No the fence will be behind the boulders56 CESLandford
01731-Aug-20In the removal of the fencing/gates, should the concrete encasements also be removed and disposed of?yes all fence/poles removed will need to be disposed of56 CESLandford
01831-Aug-20Is a SWPPP needed for this project?No SWPPP needed56 CESLandford
01931-Aug-20Are there any specific permits/coordination needed with the City of Glendale for traffic control or with SF when removing and replacing gates?No permits will be needed56 CESLandford
02031-Aug-20SOW states to install 44’ of 12X12X12 V-Track Pad with #4 rebar 4000PSI and 24”X24” gate operator pad. Please confirm unit of measure on V-track pad (ft, inches, etc.).Still waiting on answer. Will be posted as soon as we get answer56 CONSJensen
02131-Aug-20Solicitation evaluation factors for award list Factor II Past Performance will be evaluated using the Supplier Performance Risk System (SPRS) rating. Please confirm offerors do not have to submit anything for this Factor and all we are submitting is a price proposal.Contractor does not have to submit any documentation for the past performance evaluation.56 CONSJensen
02231-Aug-20Please extend proposal due date to allow for sufficient review of RFI responses.Dead line will be extended through 4 Sept.56 CONSJensen
023Per the SOW for EOD perimeter fence B951, please confirm/specify as to the type of fencing that is to be installed? I believe the SOW should have stated "slatted fence" and not slated. Furthermore, is this fence to be wood or another material?The SOW should state that it should be slatted fence. The fence will be chain link with plastic slates.56 CESLandford
024
025
026
027
032
035
037
040
044
048
054
060
063
066
068
071
074
076
080
083
085
087
090
092
099
105
112
117
119
123
126
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203

Requested Information (See below)

Sheet2

Sheet3 image1.JPG

File details come from the government source that posted it. Updated .