Attachment 1 - SOW-FENCE EXTENSION v2.docx

DOCX document 41 KB Posted

Attached to
Perimeter fence extension and EOD fences Federal contract opportunity
Solicitation number
FA488720Q0059
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Perimeter fence extension and EOD fences, newest first.
File Type Posted
RFI log - Fence 2 Sept 2020.xlsx XLSX spreadsheet
Solicitation Amendment FA488720Q00590002 SF 30.pdf PDF
Solicitation Amendment FA488720Q00590001 SF 30.pdf PDF
RFI log - Fence 1 Sept 2020.xlsx XLSX spreadsheet
Attachment 4 - Wage determination 08212020.txt TXT text file
RFI Log.xlsx XLSX spreadsheet
Solicitation - FA488720Q0059.pdf PDF
Attachment 3 - SOW-EOD FENCE v2.docx DOCX document
Attachment 4 - wage determination 06052020.pdf PDF
Attachment 7 - Fencing for pro range.jpg JPG image
Attachment 6 - EOD FENCE Plan B951.pdf PDF
Attachment 2 - SOW-EOD PERIMETER FENCE v2.docx DOCX document
Attachment 8 - SPRS color legend.docx DOCX document
Attachment 5 - South EOR Detailed Fence Aug 2020 v2.jpg JPG image
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

56TH CIVIL ENGINEERING SQUADRON (AETC)

LUKE AIR FORCE BASE, ARIZONA

June 30, 2020

MEMORANDUM FOR 56 CONS/LGCB,

Attn: Mr. Josh Wolery

FROM: 56 CES/CEOER

SUBJECT: RFP for Project – Extended perimeter fence 865 LF ft.

Please advertise and request a cost proposal for subject project.

a. Work Request Number: 7825890

b. Location: Luke AFB

c. Drawings and technical descriptions required: No

d. Material submittals required: Yes

e. Performance period: 30 calendar days

f. CE Project Manager: TSgt Daniel Landford

RICHARD MOUSEL, CIV, USAF
Chief, Requirements and Optimization

Attachments:

1. Statement of Work

2. AF Form 9, Request for Purchase

3. AF IMT 332, Base Civil Engineer Work Request

STATEMENT OF WORK

Extended perimeter fence – WO-7825890 Luke Air Force Base, Arizona 14 August, 2020

1. OVERVIEW

The purpose of this project is to safely extended perimeter fence 865 linear ft. to prevent unwanted dumping on LUKE AFB land.

2. DESCRIPTION OF WORK

2.1. This project includes all necessary demolition, construction and testing to perform work as listed in description of work below.

2.2. Performance Period: all work shall be completed within 30 calendar days after the Notice to Proceed is issued.

2.3. General Construction

2.3.1. The contractor shall safely drill into the earth a minimum 2’x2’x2’ for each Terminal posts with post caps.

2.3.2. The contractor will safely drill down 1’x1’x1x for each line post with post caps

2.3.3. The contractor will install 9 gauge 6’ height chain link fencing and secure to the poles

2.3.4. The contractor will install tension wire along the bottom of the fence and top rail along the top secured at every pole.

2.3.5. Contractor will install a 12’ double swing gate to allow personnel into the area for maintenance.

3. GOVERNMENT FURNISHED INFORMATION, PROPERTY, OR SERVICES

3.1. Upon the Contractor’s request, the Government will provide electronic and/or hard copies of available documents and correspondences pertinent to the work.

4. GENERAL INFORMATION

4.1. GENERAL

The contractor shall furnish all materials, equipment, and personnel necessary to design, manage, and accomplish the project. The Contractor shall thoroughly review the request for proposals for constructability and advise the contracting officer of potential problem areas prior to submitting a cost proposal. No alterations, additions or deletions shall be made unless prior written approval is given by the contracting officer. Under no circumstances is the Contractor to begin any work on the project until a Notice to Proceed is issued by the Contracting Officer.

4.2. SITE VISIT

The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor’s need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award.

4.3. REQUIRED SUBMITTALS

4.3.1. Submittals are required for this project and are listed along with their due dates on the AF Form 66, Schedule of Material Submittals.

4.3.2. Contractor Quality Control Reports shall be drafted in accordance with Luke Master Specifications, Section 014500. Provide such reports to the government project manager by COB of the first work day of the following week.

4.3.3. A written safety program shall be submitted prior to work start in accordance with Luke Master Specification, Section 010700.

4.3.4. When required per Schedule of Submittals, Contractor shall submit on an AF Form 3000 all product, material, shop drawing and designs to include Safety Data Sheets (SDS) to the Contracting Officer for approval before any and all items are brought to or installed on project sites at Luke AFB.

4.3.5. Contractor shall submit on Luke AFB Form 317 Contractor’s Reporting Environmental Entry Form all products used on this project. These items will be tracked monthly and reports will be turned into Mr. Oscar Mabry or Ms. Teri Wesley at the Hazmat office phone number (623) 856-4748 or 4749.

4.3.6. Demolition List: the Government reserves the right to salvage any/all equipment or materials prior to construction start. The Contractor shall submit a list of equipment to be demolished for Government review. A list of all items with delivery instructions will be provided in return to identify items for Government salvage. All other items will be the Contractor’s responsibility to dispose.

4.3.7. Provide Operation and Maintenance manual in accordance with Luke Master Specification, Section 017000.

4.3.8. The government reserves the right to request submittals on any product or service for duration of the contract.

END STATEMENT OF WORK