Attch 5 MIL-HDBK-419Apdf.pdf
PDF 10 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4887-11-R-0005
About this file
Attch 5 MIL HDBK 419A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11-R-0005-P0002.doc | DOC document | |
| Post Sign-in Sheet.xls | XLS spreadsheet | |
| Avante lights cut sheet.pdf | ||
| revised shop drawings bldg 978.pdf | ||
| Questions Asked.docx | DOCX document | |
| 11-R-0005-0001.doc | DOC document | |
| B978 mail shop sketches.pdf | ||
| Attch 6 PP Information.rtf | RTF text file | |
| Attch 4 AFOSHSTD91-501.pdf | ||
| Attch 3 AFOSHSTD91-66.pdf | ||
| Solicitation.doc | DOC document | |
| Attch 7 PP Questionairre.docx | DOCX document | |
| Attch 1 Base Specs.docx | DOCX document | |
| Attch 2 AFI32-1065.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIL-HDBK-419A
29 DECEMBER 1987
SUPERSEDING
MIL-HDBK-419
21 JANUARY 1982
MILITARY HANDBOOK
GROUNDING, BONDING, AND SHIELDING
FOR
ELECTRONIC EQUIPMENTS AND FACILITIES
VOLUME II OF 2 VOLUMES
APPLICATIONS
AMSC N/A EMCS/SLHC/TCTS
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited
DEPARTMENT OF DEFENSE
WASHINGTON DC 20301
MIL-HDBK-419A
GROUNDING, BONDING, AND SHIELDING FOR ELECTRONIC EQUIPMENTS AND FACILITIES
1. This standardization handbook was developed by the Department of Defense in accordance with established procedure.
2. This publication was approved on 29 December 1987 for printing and inclusion in the military standardization handbook series. Vertical lines and asterisks are not used in this revision to identify changes with respect to the previous issue due to the extensiveness of the changes.
3. This document provides basic and application information on grounding, bonding, and shielding practices recommended for electronic equipment. It will provide valuable information and guidance to personnel concerned with the preparation of specifications and the procurement of electrical and electronic equipment for the Defense Communications System. The handbook is not intended to be referenced in purchase specifications except for informational purposes, nor shall it supersede any specification requirements.
4. Every effort has been made to reflect the latest information on the interrelation of considerations of electrochemistry, metallurgy, electromagnetic, and atmospheric physics. It is the intent to review this handbook periodically to insure its completeness and currency. Users of this document are encouraged to report any errors discovered and any recommendations for changes or inclusions to: Commander, 1842 EEG/EEITE, Scott AFB IL 62225-6348.
5. Copies of Federal and Military Standards, Specifications and associated documents (including this handbook) listed in the Department of Defense Index of Specifications and Standards (DODISS) should be obtained from the DOD Single Stock Point: Commanding Officer, Naval Publications and Forms Center, 5801
Tabor Avenue, Philadelphia PA 19120. Single copies may be obtained on an emergency basis by calling
(AUTOVON) 442-3321 or Area Code (215)-697-3321. Copies of industry association documents should be obtained from the sponsor. Copies of all other listed documents should be obtained from the contracting activity or as directed by the contracting officer.
PREFACE
This volume is one of a two-volume series which sets forth the grounding, bonding, and shielding applications for communications electronics (C-E) equipments and facilities. Grounding, bonding, and shielding are complex subjects about which in the past there has existed a good deal of misunderstanding. The subjects themselves are interrelated and involve considerations of a wide range of topics from electrochemistry and metallurgy to electromagnetic field theory and atmospheric physics. These two volumes reduce these varied considerations into a usable set of principles and practices which can be used by all concerned with, and responsible for, the safety and effective operation of complex C-E systems. Where possible, the principles are reduced to specific steps. Because of the large number of interrelated factors, specific steps cannot be set forth for every possible situation. However, once the requirements and constraints of a given situation are defined, the appropriate steps for solution of the problem can be formulated utilizing the principles set forth.
Both volumes (Volume I, Basic Theory and Volume II, Applications) implement the Grounding, Bonding, and
Shielding requirements of MIL-STD-188-124A which is mandatory for use within the Department of Defense.
The purpose of this standard equipment by reducing noise strikes.
This handbook emphasizes the is to ensure the optimum performance of ground-based telecommunications and providing adequate protection against power system faults and lightning necessity for including considerations of grounding, bonding, and shielding in all phases of design, construction, operation, and maintenance of electronic equipment and facilities. Volume I, Basic Theory, develops the principles of personnel protection, fault protection, lightning protection, interference reduction, and EMP protection for C-E facilities. In addition, the basic theories of earth connections, signal grounding, electromagnetic shielding, and electrical bonding are presented. The subjects are not covered independently, rather they are considered from the standpoint of how they influence the design of the earth electrode subsystem of a facility, the selection of ground reference networks for equipments and structures, shielding requirements, facility and equipment bonding practices, etc. Volume I also provides the basic background of theory and principles that explain the technical basis for the recoin m ended practices and procedures, illustrates the necessity for care and thoroughness in implementation of grounding, bonding, and shielding; and provides supplemental information to assist in the solution of those problems and situations not specifically addressed.
In Volume II, Applications, the principles and theories, including RED/BLACK protection, are reduced to the practical steps and procedures which are to be followed in structural and facility development, electronic engineering, and in equipment development. These applications should assure personnel, equipment and structural safety, minimize electromagnetic interference (EMI) problems in the final operating system; and minimize susceptibility to and generation of undesirable emanations. The emphasis in Volume II goes beyond development to assembly and construction, to installation and checkout, and to maintenance for long term use.
Four appendices are provided as common elements in both volumes. Appendix A is a glossary of selected words and terms as they are used herein. If not defined in the glossary, usage is in accordance with Federal Standard
1037, Glossary of Telecommunication Terms. Appendix B is a supplemental bibliography containing selected references intended to supply the user with additional material. Appendix C contains the table of contents for the other volume. Appendix D contains the index for the two-volume set.
Paragraph
1.1
1.2
1.2.1
1.2.1.1
1.2.1.2
1.2.1.3
1.2.1.4
1.2.2
1.2.2.1
1.2.2.2
1.2.2.3
1.2.3
1.2.4
1.3
1.3.1
1.3.2
1.3.2.1
1.3.2.1.1
1.3.2.1.2
1.3.2.2
1.3.2.2.1
1.3.2.2.2
1.3.2.3
1.3.3
1.3.3.1
1.3.3.2
1.3.3.3
1.3.3.4
1.3.3.5
1.3.3.5.1
1.3.3.5.2
1.3.3.5.3
1.3.3.5.4
1.3.3.5.5
1.3.3.5.6
1.3.3.5.7
1.3.3.5.8
MIL-HDBK-419A
TABLE OF CONTENTS
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
INTRODUCTION
EARTH ELECTRODE SUBSYSTEM
Determination of Site Parameters
Soil Resistivity
Geological Effects
Physical Features
Local Climate
Design Procedure
Selection of Electrode Configuration
Calculation of Earth Resistance
Alternate Configurations
Design Guidelines
Installation Practices
LIGHTNING PROTECTION FOR STRUCTURES
Principles of Protection
Integral Protection System
Air Terminals
Size and Materials
Location
Grounding Conductors
Roof Conductors
Down Conductors
Fasteners
Separately Mounted Protection Systems
Mast Type
Overhead Ground Wire Type
Waveguide Installation and Grounding
Cable Installation and Grounding
Lightning-Generated Transient Surge Protection
Transient Source and Equipment Damage
Minimizing Damage
Susceptible Components
Frequency of Transient Occurrence
Transient Definition, AC Service Conductors
Methods for Transient Protection on AC Service Conductors
Use of Ferrous Metal Conduit
Use of Overhead Guard Wires
Page
1-1
1-2
1-2
1-2
1-5
1-5
1-5
1-6
1-6
1-9
1-9
1-14
1-22
1-23
1-23
1-23
1-24
1-24
1-24
1-33
1-33
1-37
1-39
1-40
1-40
1-41
1-42
1-49
1-49
1-49
1-50
1-50
1-51
1-51
1-56
1-56
1-56 i
1.3.3.5.9
1.3.3.5.10
1.3.3.5.11
1.3.3.5.12
1.3.3.5.13
1.3.3.5.14
1.3.3.5.15
1.3.3.5.16
1.3.3.5.17
1.3.3.5.18
1.3.3.5.19
1.3.3.5.20
1.3.3.5.21
1.3.3.5.22
1.3.3.5.23
1.3.3.5.24
1.3.3.5.25
1.3.3.5.26
1.3.3.5.27
1.3.3.5.28
1.3.3.5.29
1.3.3.6
1.3.3.7
1.3.3.7.1
1.3.3.7.2
1.3.3.7.3
1.3.3.7.4
1.3.3.7.5
1.3.3.7.6
1.3.3.7.7
1.3.3.7.8
1.3.3.8
1.3.3.9
1.3.3.10
MIL-HDBK-419A
TABLE OF CONTENTS (Continued)
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
Protection of Underground Cables
Buried Guard Wire
Secondary AC Surge Arrester
Surge Arrester Installation
Operating Characteristics of Surge Arresters
Desirable Operating Characteristics for Transient Suppressors
Characteristics of Different Types of Surge Arresters
Transient Protection for Externally Exposed Equipment Lines
Frequency of Transient Occurrence
Amplitudes and Waveforms of Occurring Transients
Equipment Withstand Levels
Protection Methods Against Transients
Enclosing Cable Runs in Ferrous Metal Conduit
Transient Suppression
Types of Available Transient Suppression
Operating Characteristics of Transient Suppressors
Transient Suppressor Packaging Design
Coaxial Cable Shield Connection Through an Entrance Plate
Grounding of Unused Wires
Transient Suppression for RF Coaxial Lines
Equipment-Level Transient Suppression
Lightning Generated Transient Protection Evaluation
Transient Protection
Protection Requirement
Transient Defini t ion
Determination of Equipment Damage (Withstand) Levels
Determination of Need for Transient Protection
Minimizing Transient Damage
AC Power Input
Power Supply Transient Suppression
Landline Transient Suppression
C o r r o s i o n C o n t r o l
J o i n t s
Physical Protection
1.4 FAULT PROTECTIVE SUBSYSTEM
1.4.1 Purpose
1.4.2 Equipment Fault Protection Subsystem Composition
ii
Page
1-57
1-57
1-59
1-59
1-60
1-67
1-67
1-73
1-73
1-73
1-74
1-74
1-74
1-75
1-77
1-77
1-78
1-78
1-78
1-79
1-79
1-79
1-80
1-80
1-81
1-82
1-83
1-83
1-84
1-89
1-89
1-98
1-99
1-99
1-99
1-99
1-100
TABLE OF CONTENTS (Continued)
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
Paragraph
1.4.3
1.4.4
1.4.5
1.4.5.1
1.4.5.2
1.4.5.3
1.4.5.4
1.4.5.5
1.4.6
1.4.7
1.4.8
1.4.9
1.4.9.1
1.4.9.2
1.4.9.3
1.5
1.5.1
1.5.1.1
Configuration of the Equipment Fault Protection Subsystem
P i p e s a n d T u b e s
Electrical Supporting Structures
Metal Conduit
C a b l e T r a y s
Enclosures
C a b l e A r m o r
Rotating Machinery
Power Distribution Systems
Standby AC Generators
Equipment Fault Protection Subsystems for Transportable Equipment
MIL-STD-188-124A and NEC Compliance Evaluation
Measurements
MIL-STD-188-124A and NEC Compliance Inspection
Correction of Deficiencies
SIGNAL REFERENCE SUBSYSTEM FOR NEW FACILITIES
Higher Frequency Network
Multipoint Ground System
1.5.1.1.1 Types of Equipotential Planes
1.5.1 .1.1.1 Copper Grid Embedded in Concrete
1.5.1.1.1.2 Equipotential Plane Under Floor Tile or Carpet
1.5.1.1.1.3 Overhead Equipotential Plane
1.5.1.1.1.4 Raised (Computer) Flooring
1.5.1.1.1.4.1 Bolted-Grid (Stringer) or Rigid Grid System
1.5.1.1.1.4.2 Drop-In or Removable Grid System
1.5.1.1.1.4.3 Free-Standing, Pedestal-Only or Stringerless System
1.5.1.1.1.5 Ground Risers
1.5.1.1.1.6 Equipment Cabinet Grounding
1.5.2 Lower Frequency Signal Reference Network
1.6 GROUNDING PHILOSOPHY FOR EQUIPMENTS PROCESSING NATIONAL SECURITY
RELATED INFORMATION (RED/BLACK EQUIPMENTS)
1.7 BONDING PRACTICES
1.7.1 Application Guidelines
1.7.2 Surface Preparation
1.7.3 Bond Protection Code
1.7.3.1 Jumper Fasteners
1.7.4 Typical Bonds
iii
Page
1-100
1-102
1-102
1-103
1-103
1-103
1-103
1-103
1-104
1-104
1-104
1-105
1-105
1-105
1-111
1-113
1-113
1-118
1-120
1-120
1-120
1-120
1-120
1-125
1-131
1-131
1-131
1-131
1-131
1-134
1-140
1-140
1-142
1-143
1-147
1-148
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
Paragraph
1.7.4.1
1.7.4.2
1.7.4.3
1.8
1.8.1
1.8.2
1.83
1.8.4
1.9
1.9.1
1.9.2
1.10
1.10.1
1.10.2
1.10.3
1.10.4
1.11 l.11.1
Cable Trays . . .
Tubing and Conduit
Other Examples . .
SHIELDING
Establishing Requirements
D e s i g n G u i d e l i n e s
Select ion of Mater ia ls
Construction Guidelines
COMMON-MODE NOISE AND INSTRUMENTATION
Design Practices
Instrumentation Considerations
EMP PROTECTION
Earth Connection
EMP Shield Applications
EMP Bonding Practices
Construction Guidelines
MILITARY MOBILE FACILITIES
General Tactical Grounding Requirements
1.11.l.l
1.11.1.1.1
1.11.1.1.1.1
1.11.1.1.1.2
1.11.1.1.1.3
1.11.1.1.1.4
1.11.1.1.1.5
1.11.l.l.2
1.11.1.1.2.1
1.11.1.1.2.2
1.11.1.1.2.3
1.11.1.1.3
1.11.1.1.3.1
1.11.1.1.3.2
1.11.1.1.4
1.11.1.1.5
1.11.1.2
1.11.1.3
1.11.1.3.1
Facility Ground System
Earth Ground
General Earth Electrode Subsystem Requirements
Earth Electrode Subsystem Types
Soil Resistance
Ground Rod Resistance
Ground Resistance She's
Power Ground
Three-Phase Power Distribution System
Single-Phase Power Distribution System
DC Power System (2-Wire)
Lightning/EMP Protection Subsystem
Air Terminals
Terminal Protection Devices
Signal Reference Subsystem
Fault Protection Subsystem
Measuring Ground Resistance in Tactical Environments
Reducing Ground Resistance in Tactical Environments
Existing Facilities iv
Page
1-148
1-149
1-149
1-154
1-154
1-159
1-160
1-162
1-164
1-171
1-172
1-172
1-172
1-173
1-173
1-176
1-177
1-177
1-177
1-177
1-177
1-177
1-178
1-178
1-178
1-178
1-178
1-179
1-179
1-179
1-179
1-182
1-182
1-182
1-182
1-182
1-182
1.11.1.3.2
1.11.1.3.3
1.11.1.3.4
1.11.2
1.11.2.1
1.11.2.1.1
1.11.2.1.2
1.11.2.2
1.11.2.2.1
1.11.2.2.2
MIL-HDBK-419A
TABLE OF CONTENTS (Continued)
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
1.11.2.2.2.1
1.11.2.2.2.1.1
1.11.2.2.2.1.2
1.11.2.2.2.1.3
1.11.2.3
1.11.2.3.1
1.11.2.3.2
1.11.2.4
1.11.2.4.1
1.11.2.4.2
1.11.2.5
1.11.2.5.1
1.11.2.5.2
1.11.2.5.2.1
1.11.2.5.2.2
1.11.2.5.2.3
1.11.2.5.2.4
1.11.2.5.2.5
1.11.2.5.2.5.1
1.11.2.5.2.5.2
1.11.2.5.2.5.3
Multiple Electrode System
Earth Electrode Subsystem
Chemical Treatment
Detailed Tactical Grounding Requirements
Introduction
Training
Testing
Stand-Alone Equipment
General Description
Grounding Procedure
Low Resistance Grounds
Existing Facilities
Earth Electrode Subsystem, Single Ground Rod
Earth Electrode Subsystem, Multiple Ground Rods
Stand-Alone Shelter
General Description
Interconnection of Subsystems
Collocated Military Mobile Equipments
General Description
Grounding Procedure
Collocated Shelters
General Description
Grounding Procedure
Power Ground
Signal Ground
Fault Protection Subsystem
Lightning/EMP Protection
Collocated Shelters Greater than 8 Meters Apart
Ground Resistance Difference of Less than 150 Ohms
Ground Resistance Difference of Greater than 150 Ohms
Earth Electrode Subsystem
1.11.2.5.2.5.3.1 Power Ground
1.11.2.5.2.5.3.2 Signal Ground
1.11.2.5.2.5.3.3 Safety/Equipment Ground (Green Wire)
1.11.2.5.2.5.3.4 Lightning/EMP Protection
1.11.2.6 Fixed Prefabricated Shelters
1.11.2.6.1 General Description
Page
1-185
1-185
1-185
1-185
1-185
1-186
1-186
1-186
1-186
1-186
1-186
1-186
1-187
1-187
1-187
1-187
1-187
1-187
1-187
1-188
1-188
1-188
1-188
1-188
1-188
1-188
1-189
1-189
1-189
1-189
1-190
1-190
1-190
1-190
1-190
1-190
1-190 v
1.11.2.6.2 Electrical
1.12
1.12.1
1.12.2
1.12.3
1.13
1.13.1
1.13.2
1.13.3
1.13.4
1.13.5
1.14
2.1
2.2
2.2.1
2.2.2
2.2.2.1
2.2.2.2
2.2.2.2.1
2.2.2.2.2
2.2.2.2.3
2.2.2.2.4
2.2.2.2.5
2.2.2.2.6
2.2.2.2.7
2.2.2.3
2.2.2.3.1
2.2.2.3.2
2.2.2.3.3
2.2.2.4
FENCES. . .
Introduction .
Grounding . .
Installation . .
MIL-HDBK-419A
TABLE OF CONTENTS (Continued)
CHAPTER 1- NEW FACILITIES DESIGN CRITERIA
Connection
INSPECTION AND TEST PROCEDURES FOR A NEW FACILITY
Earth Electrode Subsystem
Lightning Protection Network
Signal Reference and Fault Protection Subsystems
Bonds and Bonding
Facility Checkout Form
Part I Earth Electrode Subsystem
Part II Lightning Protection Network
Part III Facility Ground System
Part IV Bonding
R E F E R E N C E S
CHAPTER 2 - EXISTING FACILITIES
INTRODUCTION
U P G R A D I N G
Drawings
Facility Survey
Survey Steps
Inspection Procedure
Earth Electrode Subsystem
B o n d s a n d B o n d i n g
Lightning Protection Network
S a f e t y G r o u n d i n g
Signal Grounding Practices
Ground System Noise Survey
Shielding
Test Procedures
B o n d R e s i s t a n c e
Ground System Noise Current
Differential Noise Voltage
Survey Form
Page
1-190
1-191
1-191
1-191
1-191
1-193
1-193
1-194
1-194
1-195
1-196
1-196
1-197
1-198
1-199
1-200
2-1
2-1
2-4
2-4
2-4
2-5
2-5
2-10
2-13
2-16
2-17
2-17
2-19
2-19
2-19
2-20
2-22
2-24 vi
CHAPTER 2- EXISTING FACILITIES
Paragraph
2.2.3
2.2.4
2.2.5
2.3
2.3.1
2.3.2
2.3.2.1
2.3.2.2
2.3.2.3
2.3.2.4
2.3.2.5
2.3.2.6
2.3.3
2.3.4
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
3.1
3.2
3.2.1
3.2.1.1
3.2.1.1.1
3.2.1.1.2
3.2.1.1.3
3.2.1.1.4
3.2.1.1.5
3.2.1.1.6
3.2.1.1.7
3.2.1.2
Guidelines for Upgrading
Expansion of Existing Facilities
Expansion of Existing Facilities for Higher-Frequency Grounds
MAINTENANCE
Schedules and Records
Maintenance Procedures
Earth Electrode Subsystem
Lightning Protection Subsystem
Bonding
Fault Protection Subsystem (Safety Ground)
Signal Reference Subsystem (Signal Grounding)
Shielding
Facility Maintenance Report
Performance Evaluation Program
GROUNDING CONSIDERATIONS FOR CLASSIFIED INFORMATION PROCESSORS
(RED/BLACK EQUIPMENTS) INSTALLED PRIOR TO THIS HANDBOOK
Introduction
Existing Facilities
Protection Grounds
Signal Reference Subsystem
Signal Filter Ground
Grounding Precautions
CHAPTER 3 - EQUIPMENT DESIGN CRITERIA
INTRODUCTION
GROUNDING PROCEDURES
Signal Grounds
Lower Frequency Equipment
Signal Ground Network Configuration
Signal Ground Terminals
Color Code
Cabinet Bus Bar
Isolation
Signal Interfacing
Signal Grounding
Higher Frequency Equipment
Page
2-33
2-35
2-35
2-36
2-36
2-36
2-39
2-41
2-42
2-43
2-44
2-45
2-46
2-54
2-59
2-59
2-59
2-59
2-60
2-61
2-61
3-1
3-1
3-1
3-2
3-2
3-2
3-3
3-3
3-4
3-4
3-6
3-12 vii
3.2.1.2.1
3.2.1.2.2
3.2.1.3
3.2.2
3.2.3
3.3
3.4
3.4.1
3.4.2
3.4.3
3.4.3.1
3.4.3.2
3.5
3.5.1
3.5.2
3.5.2.1
3.5.2.1.1
3.5.2.1.2
3.5.2.1.3
3.5.2.2
3.5.2.3
3.5.2.3.1
3.5.2.3.2
3.5.2.3.3
3.6
3.7
3.7.1
3.7.2
3.7.3
3.7.4
3.7.5
3.7.6
3.7.7
3.7.8
3.7.9
3.7.10
3.7.11
3.8
MIL-HDBK-419A
TABLE OF CONTENTS (Continued)
CHAPTER 3 - EQUIPMENT DESIGN CRITERIA
Signal Interfaces
Cable Connectors
Equipments Containing Both Lower and Higher Frequency Circuits .
Fault Protection
Cabinet Grounding
BONDING PRACTICES
SHIELDING GUIDELINES
Parts Selection
Layout and Construction
Equipment Enclosures
Seams
Penetrations and Apertures
COMMON-MODE NOISE CONTROL AND INSTRUMENTATION GROUNDING
Common-Mode Noise Control
Instrumentation Grounding
Analog Systems
Grounded Transducers . .
Ungrounded Transducers .
Amplifiers
Digital Data Systems . . .
Recording Devices
Magnetic Tape Recorders
Strip Chart Recorders . .
X-Y Plotters
EMP CONSIDERATIONS
EQUIPMENT INSPECTION AND TEST PROCEDURES
Lower Frequency Equipments
Higher Frequency Equipments
Hybrid Equipments
Installed Equipments
Fault Protection Subsystem
Bonding
Shielding
Instrumentation System
EMP Design
Other Observations
Inspection Form
REFERENCES
Page
3-13
3-13
3-14
3-14
3-16
3-18
3-25
3-25
3-25
3-27
3-27
3-28
3-34
3-34
3-34
3-35
3-35
3-38
3-38
3-40
3-40
3-40
3-42
3-42
3-42
3-43
3-43
3-47
3-47
3-47
3-47
3-49
3-49
3-50
3-50
3-50
3-50
3-54 viii
CHAPTER 4 - NOTES
Paragraph Page
4.1 SUBJECT TERM (KEY WORD) LISTING . . . . . . . . . . . . . . . . . . . . . . . 4-1
APPENDICES
A GLOSSARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
B SUPPLEMENTAL BIBLIOGRAPHY . . . . . . . . . . . . . . . . . . . . . . . . . B-1
BI SUBJECT CROSS REFERENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
BII LISTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-2
C TABLE OF CONTENTS FOR VOLUME I . . . . . . . . . . . . . . . . . . . . . . . C-1
D INDEX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-1 ix
LIST OF FIGURES
Figure
1-1
1-2
1-3
1-4
1-5
1-6
1-7
1-8
1-9
1-10
1-11
1-12
1-13
1-14
1-15
1-16
1-17
1-18
1-19
1-20
1-21
1-22
1-23
1-24
1-25
1-26
1-27
1-28A
1-28B
1-29
1-30
1-31
1-32
1-33
1-34
1-35
1-36
1-37
Measurement of Soil Resistivity
Resistivity Determination of a Small Site
Minimum Earth Electrode Subsystem Configuration for Rectangular Shaped Facility
Nomograph for Determining the Resistance to Earth of a Single Ground Rod
Effective Resistance of Ground Rods When Arranged in a Straight Line or a Large Circle
Graph of Multiple-Rod Resistance Ratio
Electrode Configuration for Irregular Shaped Facility
Electrode Configuration for Adjacent Structures
Electrode Configuration for Closely Spaced Structures
Grounding System for Typical Radar Installation
Details of Ground Rod/Earth Electrode Subsystem Installation
Concrete Grounding Well
Typical Grounding Well Installation
Connections to Earth Electrode Subsystem
Grounding Practices for Lightning Protection
Location of Air Terminals for Common Roof Types
Location of Air Terminals on Gently Sloping Roofs
Air Terminal Placement on Flat-Roofed Structures
Graphical Method for Determining Need for Additional Air Terminals
Field Expedient Technique for Determining the Protection of Prominent Dormers
Illustration of Method for Determining the Protection of Flat Surfaces as Provided by Air Terminals
Criteria for Dead End Coverage
Recommended Construction Practices for Integral Lightning Protection Systems
The Protected Zone Provided by Two Vertical Masts
Overhead Ground Wire Lightning Protection System
Waveguide Entry Plate Detail
Grounding Detail for Elliptical Waveguide (Front View)
Grounding Detail for Elliptical Waveguide (Side View)
Heat Shrink Grounding
Ground Strap Detail for Elliptical Waveguide
Strap Cutting Detail for Elliptical Waveguide
Typical Communication Cable Entry Installation
Ground Strap Detail
Grounding Steps for Cables
Mean Number of Thunderstorm Days per Year for the United States
Lightning Protection for Underground Service
Secondary AC Surge Arrester Installation, Grounded Service
Secondary AC Surge Arrester Installation, Ungrounded Service
Page
1-3
1-4
1-10
1-11
1-12
1-13
1-16
1-17
1-17
1-18
1-19
1-20
1-20
1-21
1-25
1-26
1-27
1-29
1-30
1-31
1-32
1-37
1-38
1-40
1-41
1-43
1-44
1-45
1-46
1-46
1-46
1-47
1-48
1-48
1-53
1-58
1-61
1-62 x
LIST OF FIGURES (Continued)
Figure Page
1-38
1-39
1-40
1-41
1-42
1-43
1-44
1-45
1-46
1-47
1-48
1-49
1-50
1-51
1-52
1-53
1-54
1-55
1-56
1-57
1-58
1-59
1-60
1-61
1-62
1-63
1-64
1-65
1-66
1-67
1-68
1-69
1-70
1-71
Typical Operating Curve for Two Series of Gas-filled Spark Gap Arresters
With Nonlinear Series Resistor
Typical Arrester Operating Curves, ZNR and SAS
Typical Transient Suppressor Installation, Facility and Equipment Level
Typical Configuration for Protection of Equipment from Conducted Powerline Surges and Transients (Neutral Grounded)
Typical Configuration for Protection of Equipment from Conducted Powerline Surges and Transients (Ungrounded)
Typical Configuration for Protection of Equipment from Conducted
Landline Transients
Transient Suppression for Coaxial Lines (DC to 3 MHz)
Transient Suppression for Twinaxial Lines (DC to 3 MHz)
Typical Equipment Fault Protection Subsystem
Method for Determining the Existence of Improper Neutral Ground Connections
(Deleted)
Typical Equipotential Ground Plane for Multi-Deck Building
Typical Building Floor Plan (Top View)
Typical Multi-Deck Building Plan (Side View)
Elements of the Facility Ground System (With Grid)
Typical Equipotential Ground Plane for New Construction Higher or Hybrid
Frequencies Facilities Installation
Ground Connector for Equipotential Plane in Concrete
Typical Ground Connectors
Example of Cable to Bar Ground Connectors
(Deleted)
Rigid Grid Floor System Details
Example of Rigid Grid to Pedestal Bolted Connection
Example of Rigid-Grid to Pedestal Clamped Connection
Example of Unacceptable Grid to Pedestal Bonding
Example of Drop-In Grid Floor Construction
Example of Pedestal Only Floor Construction
Typical Equipment Cabinet Grounding Detail
Typical RED/BLACK Signal Reference Subsystem
Typical RED Signal, Shield Ground, Bus Distribution System
Typical Intermediate Distribution Frame (Shield Ground Bus in Distribution Frames)
Typical Intermediate Distribution Frame (Data Concentrator Frame Installation)
Facility Power and AC Ground Distribution
Order of Assembly for Bolted Connection
Bonding of Cable Trays
1-69
1-72
1-76
1-86
1-87
1-92
1-95
1-96
1-101
1-112
1-115
1-116
1-117
1-121
1-122
1-123
1-123
1-124
1-127
1-128
1-129
1-130
1-131
1-132
1-133
1-135
1-136
1-137
1-138
1-139
1-142
1-148 xi
Figure P a g e
5-12
5-13
5-14
5-15
5-16
5-17
5-18
5-19
6-1
6-2
6-3
6-4
6-5
6-6
6-7
6-8
6-9
6-10
6-11
6-12
6-13
6-14
6-15
7-1
7-2
7-3
7-4
7-5
7-6
7-7
7-8
7-9
7-10
7-11
7-12
7-13
Single-Point Signal Ground (for Lower Frequencies)
Single-Point Ground Bus System Using Separate Risers (Lower Frequency) . . .
Single-Point Ground Bus System Using a Common Bus
Use of Single-Point Ground Configuration to Minimize Effect of Facility Ground
Currents
Multipoint Ground Configuration
Use of Structural Steel in Multiple-Point Grounding
Recommended Signal Coupling Practice for Lower Frequency Equipment
Ground Network Used as Signal Return (Practice Not Generally Recommended) .
Idealized Energy Transfer Loop
Energy Transfer Loop With Noise Sources in Ground System
Equivalent Circuit of Non-Ideal Energy Transfer Loop
Practical Combinations of Source-Load Pairs
Coupling Between Circuits Caused by Common Return Path Impedance
Conductive Coupling of Extraneous Noise into Equipment Interconnecting Cables
Magnetic Field Surrounding a Current-Carrying Conductor
Illustration of Inductive Coupling
Illustration of Capacitive Coupling
Equivalent Circuit of Network in Figure 6-9
Characteristic Voltage Transfer Curve for Capacitive Coupling
Electric Field Patterns in the Vicinity of a Radiating Dipole
Illustration of Conductively-Coupled Corn men-Mode Noise
Common-Mode Noise in Unbalanced Systems
Common-Mode Noise in Balanced Systems
Effects of Poor Bonding on the Performance of a Power Line Filter
Current Flow Through Direct Bonds
Nature of Contact Between Bond Members
Resistance of a Test Bond as a Function of Fastener Torque
Typical Exothermic Connections
Typical Bond Configuration Which Can be Implemented With the Exothermic Process
Nomograph for Torque on Bolts
Bonding Path Established by Rivets
An Improperly Riveted Seam
Inductive Reactance of Wire and Strap Bond Jumpers
Relative Inductive Reactance Versus Length-to-Width Ratio of Flat Straps
Frequency Variation of the Impedance of Simple Conductors
Equivalent Circuit for Bonding Strap
5-20
5-21
5-22
5-23
5-24
5-25
5-29
5-30
6-2
6-3
6-3
6-4
6-7
6-7
6-8
6-9
6-11
6-13
6-15
6-16
6-18
6-20
6-22
7-2
7-5
7-6
7-9
7-12
7-13
7-15
7-17
7-17
7-22
7-23
7-24
7-24 xii
Figure Page
2-6
2-7
2-8
2-9
2-10
2-11
2-12
2-13
2-14
2-15
2-16
2-17
2-18
2-19
2-20
3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
3-9
3-10
3-11
3-12
3-13
3-14
3-15
3-16
3-17
3-18
3-19
3-20
Typical Bonding Deficiencies
Typical Bonding Deficiencies
Severely Damaged Down Conductor
Method for Determining the Existence of Improper Neutral Ground Connections
Measurement of Stray Current Level in Safety Ground Conductor
Typical Bond Resistance and Stray Current Measurement Locations in an Electronic Facility
Bond Resistance Measurement Technique
Test Setup for Stray Current Measurements
Oscilloscope Connections for Measuring Voltage Levels on Ground Systems
Example of Equipotential or Multipoint Grounding
Major Discrepancy Report Form
Typical Multiple Area Ground Distribution
Typical Signal, Shield Ground, Bus Distribution System for Single-Point Ground
Crypto Equipment Grounds
Typical Facility Ground System
Grounding in Lower Frequency Equipment
Lower Frequency Signal Ground Bus Bar Installation in Rack or Cabinet
Use of Balanced Lines to Avoid Ground Loops
Effect of an Unbalanced Cable on the Single-Point Ground
Effect of Arbitrarily Grounding the Source End of Unbalanced Equipment
Interconnecting Cables
Method of Grounding the Individual Shields on Long Lower Frequency Shield Cables
Grounding of Overall Cable Shields to Connectors
Grounding of Overall Cable Shields to Penetrated Walls
Establishment of Shield Continuity Between Higher Frequency Equipments
Grounding Practices in Equipments Containing Both Higher Frequency and
Lower Frequency Circuits
Typical Equipment Cabinet Grounding Detail
Acceptable and Unacceptable Uses of Bonding Jumpers . . . , Bonding of Subassemblies to Equipment Chassis
Bonding of Equipment to Mounting Surface
Typical Method of Bonding Equipment Flanges to Frame or Rack
Bonding of Rack-Mounted Equipments Employing Dagger Pins. . . . . . , Recommended Practices for Effective Bonding in Cabinets
Method of Bonding Across Hinges
Bonding of Connector to Mounting Surface
Method of Making Permanent Seam Using a Gasket
2-11
2-12
2-14
2-15
2-16
2-18
2-21
2-22
2-23
2-37
2-38
2-62
2-63
2-64
2-65
3-3
3-5
3-7
3-8
3-9
3-10
3-11
3-12
3-13
3-15
3-17
3-19
3-21
3-21
3-22
3-22
3-23
3-24
3-24
3-29 xiii
Figure
3-21
3-22
3-23
3-24
3-25
3-26
3-27
3-28
3-29
3-30
3-31
3-32
3-33
3-34
3-35
Mounting of Gasket on Hinged Side of Equipment Doors and Panels
Illustration of Proper and Improper Shield Penetration
Use of Cylindrical Waveguide - Below-Cutoff for Control Shaft Shield Penetration
Method of Mounting Wire Screen Over a Large Aperture
Acceptable Methods of Shielding Panel - Mounted Meters
Grounding Practices for Single-Ended Amplifiers
Grounding Practices for Differential Amplifiers
Method of Grounding Bridge Transducers
Use of Isolated Differential Amplifier With Balanced Bridge Transducer
Recommended Grounding Practices for Floating Traducers
Grounding for Single Channel Strip Chart Recorder
Resistive Isolation of Data Channels
Single Ground Terminal Isolation Resistance Test for an Individual Equipment
Signal Ground Terminal Isolation Resistance Test for an Equipment Assembly
Measurement of Connector Bonding Resistance
Page
3-29
3-31
3-32
3-33
3-33
3-36
3-36
3-37
3-37
3-39
3-41
3-41
3-45
3-46
3-48 xiv
LIST OF TABLES
Table Page
1-1
1-2
1-3
1-4
1-5
1-6
1-7
1-8
1-9
1-10
1-11
1-12
1-13
1-14
1-15
1-16
1-17
1-18
1-19
1-20
1-21
1-22
1-23
1-24
1-25
1-26
1-27
1-28
1-29
1-30
3-1
Relative Advantages and Disadvantages of the Principal Types of Earth Electrodes
Minimum Requirements for Roof and Down Conductors on Structures Not Greater than
75 Feet (23 Meters) in Height
Minimum Requirements for Roof and Down Conductors on Structures Greater than
75 Feet (23 Meters) in Height
Solid Copper Wire - Weight, Breaking Strength, DC Resistance
Frequency of Transient Occurrences
Parameter for Direct Lightning Strike Current
Peak Currents from Direct Lightning Strikes
Transient Surge Amplitudes
Transient Occurrence, High-Incident Lightning Areas
Transient Occurrence, Low-Incident Lightning Areas
Generalized Characteristics for Surge Arresters by Type
Typical Maximum Clamp Voltage for Gap Arresters
ZNR Type Devices (Molded Case Type) Typical Characteristics
High Energy ZNR Surge Arrester Typical Characteristics
Test Results for Parallel-Connected ZNR
Transients Projected to Occur on Externally Exposed Line in High-Lightning
Incident Area Over 10-Year Period
Transient Surges, Line-to-Ground
Transient Surges, Line-to-Line
Transient Surges Projected to Occur in 10-Year Period on Externally-Exposed
Landlines
Grounding Electrode Conductor Size
Equipment Grounding Conductor Size Requirement
Size of Equipment Ground Cables
Minimum Torque Requirements for Bolted Bonds
Compatible Groups of Common Metals
Bond Protection Requirements
Protective Finishes for Bond Members
Metal Connections for Aluminum and Copper Jumpers
Attenuation Correction Factors for Reinforcing Steel
Relative Conductivity and Relative Permeability of Common Metals
Soil Resisitivity (Ohm-m)
1-8
1-34
1-34
1-35
1-51
1-54
1-55
1-55
1-63
1-63
1-65
1-68
1-70
1-70
1-71
1-73
1-81
1-82
1-83
1-107
1-110
1-119
1-141
1-143
1-144
1-145
1-147
1-157
1-163
1-179
Frequency Properties of Standard Sizes of Honeycomb . . . . . . . . . . . . . . . . . 3-30 xv/xvi
CHAPTER 1
NEW FACILITIES DESIGN CRITERIA
1.1 INTRODUCTION.
This chapter presents the design, installation practices, test and acceptance procedures associated with the incorporation of effective grounding, bonding, and shielding for a new facility.* The major elements of the facility covered are the (1) earth electrode subsystem, (2) fault protection subsystem, (3) lightning protection subsystem, (4) signal reference subsystem, (5) bonding, and (6) shielding. Design and construction steps for these six elements are contained in the following sections:
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
Earth Electrode Subsystem
Lightning Protection for Structures
Fault Protection Subsystem
Signal Reference Subsystem for New Facilities
Grounding, Philosophy for Equipments Processing National Security Related Information
Bonding Practices
Shielding
Common-Mode Noise and Instrumentation
EMP Protection
Military Mobile Facilities
Fences
Inspection and Test Procedures for a New Facility
Secure transmission facility requirements are covered in Section 1.6. Supplemental measures which are needed to be incorporated in a facility to help reduce common-mode and instrumentation noise problems are presented in Section 1.9, Common-Mode Noise and Instrumentation. The special construction practices recommended to reduce facility vulnerability to the electromagnetic pulse (EMP) threat are contained in Section 1.10, EMP
Protection. Tactical grounding requirements are presented in Section 1.11, Military Mobile Facilities.
Inspection and Test Procedures for a New Facility, provided in Section 1.13, should be utilized in verifying that recommended practices and procedures are properly implemented and to help establish a perform ante baseline against which future measurements can be compared.
To obtain optimum performance of electronic equipment and personnel safety while providing adequate protection against power system faults, EMP, and lightning strikes, thorough consideration must be given to the grounding system for the building; to the bonds needed and the method of their implementation and to the shielding needed throughout the building for personnel safety and equipment interference control. For a new facility, the requirements in each of these areas are defined and appropriate design steps set forth to assure that the necessary measures are incorporated into the final structure and equipment installation.
*A new facility is considered to be one of new construction or an existing one that will undergo major renovation or major equipment reconfiguration. The project engineer shall determine the grounding requirements whenever minor equipment reconfigurations are accomplished in existing facilities. Refer to
Chapter 2 for additional information.
1-1
1.2 EARTH ELECTRODE SUBSYSTEM. The earth electrode subsystem establishes the electrical connection between the facility and earth. This connection is necessary for lightning protection, useful in power fault protection, and and in the minimization of noise. The system should be tailored to reflect the characteristics of the site and the requirements of the facility.* It must be properly installed and steps must be taken to assure that it continues to provide a low resistance connection throughout the life of the structure. To achieve these objectives, first determine the electrical and physical properties of the site, design an earth electrode subsystem appropriate for the site, install the subsystem in accordance with the recommended procedures, and finally, measure the earth resistance of the subsystem to verify that it meets the recoin mended goals or design specifications.
1.2.1 Determination of Site Parameters (Site Survey). Before beginning the design, conduct a survey of the site where the earth electrode subsystem is to be installed. Through this survey, determine the resistivity of the soil, identify significant geological features, gather information on architectural and landscape features which may influence the design of the subsystem, and review local climate effects. (If possible, conduct this survey in advance of the final site selection in order to avoid particularly troublesome e locations.)
1.2.1.1 Soil Resistivity. As the first step of the site survey, measure the resistivity of the soil at several points over the area of the planned facility. For even the smallest facility, the effective facility area in so far as the electrode subsystem is concerned is assumed to be at least 15 meters by 15 meters (50 feet by 50 feet).
For larger facilities, the facility areas are assumed to extend at least 6 meters (20 feet) beyond the basic building or structural outline, i.e., the ground floor plan, substation grid, tower footing, transformer housing, etc. It is necessary that the soil resistivity be known over the area encircled or covered by the earth electrode subsystem.
a. A single soil resistivity measurement is made using the four-probe method (see Volume I, Section
2.4) in the following manner:
(1) At a location near the center of the site, insert the four short probes supplied with the earth resistance test set into the soil in a straight line as illustrated in Figure 1-1. A convenient probe spacing of 6 to 9 meters (20 to 30 feet) is recommended as a start. If probes are not supplied with the test set or if they have been lost or misplaced, four metal (steel, copper, or aluminum) rods, 1/4 to 3/8 inch in diameter and 12 to
18 inches in length, may be used. Drill and tap No. 6-32, 8-32, or 10-24 screws, according to rod size and securely fasten the test set leads to the rods. Clamps may also be used for connecting the leads to the probes.
*The relationship between the performance of an electronic system and the resistance of the earth ground is unclear. The value of 10 ohms earth electrode resistance recommended in Section 1.2.2.la represents a carefully considered compromise between overall fault and lightning protection requirements and the estimated relative cost of achieving the resistance in typical situations. In locations characterized by high soil resistivities, to achieve 10 ohms could be very expensive. In such locations, examine all elements of the site, consider the requirements of the planned facility, and then choose the best compromise based on soil conditions, relative costs, etc.
1-2
(2) Following the manufacturer's instruction, obtain a resistance reading, R, with the test set.
(3) Convert the probe spacing, A, to centimeters. (See Page xvi for metric conversion factors.)
(4) Compute resistivity from
= 6.28AR (in ohm-cm)
EXAMPLE: Assume that a resistance of 2 ohms is measured with probe spacings of 20 feet.
Convert 20 feet to centimeters: 20 ft x 30.5 cm/ft = 610 cm
Calculate resistivity = 6.28 x 610 x 2 = 7662 ohm -cm
A = ELECTRODE SPACING
B = DEPTH OF PENETRATION < A/20
D = DEPTH AT WHICH RESISTIVITY IS DETERMINED = A
(l -1)
Figure 1-1. Measurement of Soil Resistivity
1-3
b. The reading obtained indicates the average resistivity of the soil in the immediate vicinity of the test area. A resistivity profile of the site requires that the above procedure be repeated at many sample locations over the region being mapped. For small sites up to 2500 square feet (232 square meters), make at least one measurement at the center of the site and at each of the four corners of a 50-foot square as shown in
Figure 1-2. Drive a stake or marker at the locations shown. Position the potential and current probes in a straight line with the stake or marker centered between the probes. Make a resistance measurement at each location and calculate the resistivity as in step a-4 above. Take the average of the five readings as the resistivity for the soil at the site. If possible, soil measurements should be made during average/normal weather conditions. Measurements should never be made immediately after a rain or storm.
c. For larger sites, make measurements every 100 to 150 feet (30 to 45 meters) over the site area.
Include in the site area the locations of support elements such as transformer banks, towers, engine-generator buildings, etc. Choose a sufficient number of test points to give an indication of the relative uniformity of the soil composition throughout the area. Be particularly alert for the presence of localized areas of very high or very low resistivity soils.
NOTE: NOT DRAWN TO SCALE.
Figure 1-2. Resistivity Determination of a Small Site
1-4
1.2.1.2 Geological Effects.
a. Identify the significant geological features of the site. Specifically, attempt to establish:
(1) the distribution of major soil types (see Volume l, Section 2.3.2 ) to include the locations of sand and gravel deposits,
(2) major rock formations,
(3) the presence of water sources to include underground streams, and
(4) the depth of the water table.
Utilize test borings, on site inspections, studies of local maps, and interviews companies, well drillers, and other local personnel to obtain the desired information.
with local construction
b. Evaluate the information provided by these sources for indications of particularly troublesome (or particularly helpful) characteristics that may influence the design or installation of the earth electrode subsystem of the facility.
1.2.1.3 Physical Features. Locate and identify those other physical features that will influence the general placement of the earth electrode subsystem, the location of test and access points, physical protection requirements, and the cost of materials and installation. For example, indicate on the general site plan:
a.
b.
c.
d.
the planned physical layout of the building or structure, locations of paved roads and parking lots, drainage, both natural and man-made, and the location of buried metal objects such as pipes and tanks.
1.2.1.4 Local Climate.
a. Review local climatic conditions and determine the annual amount and seasonal distribution of rainfall, the relative incidence of lightning, and the depth of freezing (frost line) typical of the area. Obtain the rainfall and frost line information from the local weather service; project the relative lightning incidence from the isokeraunic maps given in Volume I, Section 3.4, Figures 3-2 and 3-3.
b. Record the data and make it a part of the facility files for the site. Immediately, however, use this information to aid in the design of the earth electrode subsystem for the facility to be constructed at the site.
1-5
1.2.2 Design Procedure.
1.2.2.1 Selection of Electrode Configuration. Determine what type of earth electrode subsystem is most appropriate for the facility (complex, building, structure, transformer bank, substation, etc). The directed configuration is a ring ground outlined in paragraph 5.1.1.1.3 of MIL-STD-188-124A. If this configuration cannot be employed, alternate configurations meeting these requirements are described in Section 1.2.2.3 of this volume.
a. Establish the primary functional requirements to be met by the earth electrode subsystem. For example.
Lightning. For a facility located in an area of high lightning incidence or a high degree of exposure to lightning, or both, (see Volume 1, Section 3.4) the earth electrode subsystem must safely dissipate the lightning energy without melting conductors or overheating the soil (see Volume I, Section 2.8.2.2). Also, the subsystem must minimize step voltages in areas where personnel are present.
Impulse Properties and RF Impedance Characteristics. If the antenna counterpoise must serve as an earth electrode subsystem, it must have low rf impedance properties.
Mobility. Mobile facilities or temporary transportable facilities will generally not justify the installation of an extensive fixed electrode subsystem. For such facilities, install only a basic system capable of providing the minimum acceptable lightning and personnel fault protection (see Section 1.11).
Resistance. At fixed C-E facilities, the earth electrode subsystem should exhibit a resistance to earth of 10 ohms or less. If 10 ohms is not economically feasible by the ring ground, alternate methods should be considered. Paragraph 5.1.1.1.3.2 of MIL-STD-188-124A refers. Resistance measurements using the fall-of-potential method shall be accomplished in 3-month increments for 12 months following installation.
Measurements shall be conducted in 21-month intervals after the first year.
b. Evaluate local conditions.
Soil resistivity. Is soil resistivity low (< 5000 ohm-cm), average (5000 to 20,000 ohm -cm), or high
(> 20,000 ohm-cm)? The higher the soil resistivity, the more complex (and expensive) will be the electrode subsystem necessary to achieve 10 ohms resistance.
Moisture content. Is the water table near the surface or far below grade, and is it subject to large seasonal variations? Design the earth electrode subsystem so that it makes and maintains contact with soil that stays damp or moist year round if at all possible. Penetration of the permanent water table is highly desirable.
Frost line. How deeply does the frost line extend, even during coldest periods? The resistivity of soil rises greatly (see Volume I, Section 2.3.3) as the soil temperature drops below 32° F. Thus for maximum stability of electrode resistance, the subsystem should penetrate far enough into the soil so that contact is always maintained with unfrozen soil. The earthing techniques described in this chapter are not directly applicable to permafrost. In permafrost, fault protection must be provided through the use of metallic returns accompanying the power conductors to insure the existence of a return path to the transformer or generator.
1-6
Personnel protection in permafrost requires an even greater emphasis on the bonding of all metal objects subject to human contact and to the power system neutral and is described in Volume I, Chapter 2. Because of the high resistance of permafrost, stray earth currents can be expected to be minimal with consequently reduced concern with inter-facility power frequency noise problems (see Volume I, Section 2.1.3). In the event that earth-current related noise problems exist, the common-mode rejection techniques described in Volume I, Section 6.4 should be applied.
Rock Formations. Are major rock formations near the surface and are they large enough to influence the design and layout of the earth electrode subsystem? In regions of shallow bedrock, vertical ground rods may not be usable and horizontal grids, wires, or plates must be used. Large rock outcropping or subsurface boulders may force the alternate routing of conductors or the placement of rods. There is no need to incur the expense of drilling holes in rock to insert rods or lay wires because the resistivity of rock is so high that generally the rods or wires would be ineffective.
Architectural layout. Design the earth electrode subsystem so that it will not be materially influenced by the weather shielding effects of parapets and overhangs. Lightning down conductor placement and routing will frequently be influenced by architectural considerations. Design the earth electrode subsystem to accommodate such considerations by providing convenient connection points near the down conductors.
Route the interconnecting cable of the earth electrode subsystem near down conductors to avoid long extensions between the down conductor and the effective grounding point. Configure the earth electrode subsystem such that convenient connections are possible between the earth electrode subsystem and grounding conductors of the power and signal ground systems inside the facility.
Landscape features. Preferably locate ground subsystem conductors under sodded areas or those otherwise covered with vegetation. Locate conductors to take maximum advantage of the wetting effects of runoff or drainage water from the roof, parking lots, etc. Try to avoid placing major portions of this earth electrode subsystem under extensive paved areas such as roads and parking lots.
c. Considering the relative advantages and disadvantages given in Table 1-1, choose a basic type of electrode most appropriate for meeting the functional requirements of the facility at the site under construction.
d. Estimate the relative costs to meet the objectives with the different types of configurations.
Include the cost of materials, installation costs, and relative maintenance and upgrading costs.
1-7
Table 1-1
Relative Advantages and Disadvantages of the Principal Types of Earth Electrodes
Type Advantages Disadvantages
Ring Ground Straightforward design. Easy to install Not useful where large rock
(particularly around an existing facility). formations are near surface.
Hardware readily available. Can be extended to reach water table.
Horizontal Bare Can achieve low resistance where rock
Wires (Radials) formations prevent use of vertical rods.
Low impulse impedance. Good rf counterpoise when laid in star pattern.
Horizontal Grid Minimum surface potential gradient.
(Bare Wire) Straight for ward installation if done before construction. Can achieve low resistance contact in areas where rock formations prevent use of vertical rods.
Can be combined with vertical rods to stabilize resistance fluctuations.
Vertical Rods Straightforward design. Easiest to install (particularly around an existing facility). Hardware readily available.
Can be extended to reach water table.
Plates
Incidental
Electrodes
(Utility pipes, building foundations, buried tanks)
Can achieve low resistance contact in limited area.
Can exhibit very low resistance.
Subject to resistance fluctuations with soil drying.
Subject to resistance fluctuations with soil drying if vertical rods not used.
High impulse impedance. Not useful where large rock formations are near surface. Step voltage on earth surface can be excessive under high fault currents or during direct lightning strike.
Most difficult to install.
Little or no control over future alterations. Must be employed with other made electrodes.
1-8
1.2.2.2 Calculation of Earth Resistance.
Once the most appropriate configuration is chosen for the facility, calculate the resistance to earth for the configuration. If the calculated resistance meets the design goal (or requirement), complete the design to include all necessary interconnections. To illustrate this design procedure, assume that a 100 ft x 160 ft rectangular configuration like that shown in Figure 1-3 is initially chosen. Further, assume that the soil resistivity measurements made during the site survey showed an average resistivity of 10,000 ohm-cm for the area. In addition, the site survey indicated that all rock formations are at depths greater than 10 feet; the water table never drops more than 5 feet below grade; and the frost line extends only to 1 foot below grade.
Therefore, 10-foot ground rods are initially selected for evaluation. (The minimum rod diameter required in
MIL-STD-188-124A, para 5.1.1.1.4 is 3/4 inch.)
a. Determine the resistance of one of the ground rods from Figure 1-4. First, place a straight edge between the point marked 3/4 on line “d” and the point marked 10 on line Indicate on line “q” where the straightedge crosses. Next , p lace the s t ra ightedge be tween the poin t jus t marked on “q” and the
10,000 ohm-cm point on the vertical line labeled “Resistivity.” Read the resistance as 32 ohms at the point where the straightedge crosses the vertical line labeled “Resistance.”
b. Assume an initial spacing of 20 feet or twice the rod length (see Volume I, Section 2.6.2) between rods. Figure 1-3 shows that 26 rods are required to encircle the structure. Use Figure 1-5 to determine the relative lowering of the resistance of one rod that is produced by 26 rods in parallel. (The answer is about 5.5 percent.) Thus the resistance of the 26 rods in 10,000 ohm-cm soil is
R = 32 x 0.055 = 1.76 ohms.
Figure 1-5 primarily applies to ground rods laid out in a straight line or around the perimeter…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .