Solicitation.doc
DOC document 1 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4887-11-R-0005
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 11-R-0005-P0002.doc | DOC document | |
| Questions Asked.docx | DOCX document | |
| Avante lights cut sheet.pdf | ||
| revised shop drawings bldg 978.pdf | ||
| Post Sign-in Sheet.xls | XLS spreadsheet | |
| 11-R-0005-0001.doc | DOC document | |
| B978 mail shop sketches.pdf | ||
| Attch 7 PP Questionairre.docx | DOCX document | |
| Attch 3 AFOSHSTD91-66.pdf | ||
| Attch 6 PP Information.rtf | RTF text file | |
| Attch 5 MIL-HDBK-419Apdf.pdf | ||
| Attch 4 AFOSHSTD91-501.pdf | ||
| Attch 1 Base Specs.docx | DOCX document | |
| Attch 2 AFI32-1065.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lump Sum |
SABER:
FFP
FFP-Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, Gila Bend AFAF (to include the Barry M. Goldwater Range) and Fort Tuthill, AZ. Work will be completed in strict accordance with the General Specifications, Statement of Work, schedule, and subject to terms and conditions of the contract.
FOB: Destination
NSN: Z199-50-SAB-ER
SIGNAL CODE: A
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lump Sum |
| OPTION |
| SABER: |
FFP
FFP-Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, Gila Bend AFAF (to include the Barry M. Goldwater Range) and Fort Tuthill, AZ. Work will be completed in strict accordance with the General Specifications, Statement of Work, schedule, and subject to terms and conditions of the contract.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lump Sum |
| OPTION |
| SABER: |
FFP
FFP-Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, Gila Bend AFAF (to include the Barry M. Goldwater Range) and Fort Tuthill, AZ. Work will be completed in strict accordance with the General Specifications, Statement of Work, schedule, and subject to terms and conditions of the contract.
FOB: Destination
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Lump Sum |
| OPTION |
| SABER: |
FFP
FFP-Contractor shall furnish all plant, labor, equipment, supervision and materials to perform all operations in connection with the Simplified Acquisition Base Engineering Requirements (SABER) Program for Luke AFB, Gila Bend AFAF (to include the Barry M. Goldwater Range) and Fort Tuthill, AZ. Work will be completed in strict accordance with the General Specifications, Statement of Work, schedule, and subject to terms and conditions of the contract.
FOB: Destination
MAX
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 1.00 |
| $5,000.00 |
| 1,000.00 |
| $10,000,000.00 |
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 1.00 |
| $2,000.00 |
| 100.00 |
| $750,000.00 |
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
| CLIN |
| MINIMUM |
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 0001 |
| 1.00 |
| $5,000.00 |
| 1,000.00 |
| $10,000,000.00 |
| 1001 |
| 1.00 |
| $5,000.00 |
| 1,000.00 |
| $10,000,000.00 |
| 2001 |
| 1.00 |
| $5,000.00 |
| 1,000.00 |
| $10,000,000.00 |
| 3001 |
| 1.00 |
| $5,000.00 |
| 1,000.00 |
| $10,000,000.00 |
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
| CLIN |
| MINIMUM |
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 0001 |
| 1.00 |
$2,000.00
100.00
$750,000.00
| 1001 |
| 1.00 |
$2,000.00
100.00
$750,000.00
| 2001 |
| 1.00 |
$2,000.00
100.00
$750,000.00
| 3001 |
| 1.00 |
$2,000.00
100.00
$750,000.00
Section C - Descriptions and Specifications
WAGE DETERMINATION
General Decision Number: AZ100001 12/03/2010 AZ1
Superseded General Decision Number: AZ20080001
State: Arizona
Construction Type: Building
Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma
Counties in Arizona.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
1 06/04/2010
2 07/02/2010
3 07/09/2010
4 07/23/2010
5 08/06/2010
6 08/27/2010
7 09/10/2010
8 10/15/2010
9 11/05/2010
10 11/19/2010
11 12/03/2010
BRAZ0003-003 11/23/2009
COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the
San Francisco River to the Gila River), & YUMA COUNTIES
Rates Fringes
Bricklayer - Cement Block
Layer............................$ 24.62 4.57
BRAZ0003-008 11/23/2009
PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES
Rates Fringes
Bricklayer - Cement Block
Layer............................$ 24.62 4.57
CARP0408-001 07/01/2009
Rates Fringes
CARPENTER........................$ 23.00 7.24
CARP1327-001 01/01/2010
Rates Fringes
DRYWALL HANGER...................$ 19.25 6.61
* ELEC0570-003 12/01/2010
PIMA, PINAL (Southern Part), AND YUMA COUNTIES
Rates Fringes
Electrician/Wireman..............$ 22.90 18%+4.70
Zone Definitions
(b) ZONE PAY -Workmen employed in Zones B and C shall be paid
Zone Pay as follows:
Zone B............an additional $ 1.25 per hour
Zone C............an additional $ 3.75 per hour
SECTION 3.05 ZONES
(a) Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto
(Section 1.03). Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement.
In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall.
Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total).
Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction.
If any owner's contiguous property falls within more than one
Zone, it shall all be considered to be within the closer
Zone.
ELEC0640-005 06/21/2010
COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian
Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with
Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then
North to the Maricopa-Pinal County Lines) COUNTIES
Rates Fringes
Electrician/Wireman..............$ 24.80 3%+7.14
ENGI0428-003 06/01/2010
Rates Fringes
Power Equipment Operator
(2) Crane under 15 tons.....$ 25.22 9.79
(3) Crane,15 tons to 100 tons........................$ 26.30 9.79
(4) Crane, 100 tons and over........................$ 27.33 9.79
IRON0075-002 08/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL
Zone 1:.....................$ 26.52 17.59
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson
Zone 2: 050 to 100 miles - Add $4.00
Zone 3: 100 to 150 miles - Add $5.00
Zone 4: 150 miles & over - Add $6.50
LABO0383-005 06/01/2009
Rates Fringes
LABORER (Brick/Block Tender).....$ 16.72 4.35
* PAIN0086-003 04/01/2010
Rates Fringes
PAINTER..........................$ 17.85 4.70
PAIN0086-005 07/01/2009
Rates Fringes
GLAZIER..........................$ 25.75 6.39
PLUM0469-002 07/01/2010
ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES
ZONE B: PIMA AND PINAL COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER
Zone A......................$ 31.65 14.90
Zone B......................$ 28.55 14.65
SFAZ0669-001 04/01/2010
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.85 16.85
SHEE0359-002 08/01/2010
PIMA and PINAL (South of the 33rd Parallel) COUNTIES
Rates Fringes
Sheet Metal Worker (Including
HVAC)
Zone 1......................$ 25.20 13.82
SHEE0359-003 08/01/2010
COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES
Rates Fringes
Sheet Metal Worker (Including
HVAC)............................$ 25.20 13.82
SUAZ2004-001 01/14/2004
Rates Fringes
Cement Mason/Finisher............$ 15.25 5.01
Laborers
Concrete Worker.............$ 8.88 0.00
Form Setter.................$ 9.63 0.00
General/Cleanup.............$ 11.37 2.91
Waterproofing...............$ 12.59 0.00
PLASTERER........................$ 15.00 0.00
Power Equipment Operator
Backhoe.....................$ 14.78 0.00
TILE FINISHER....................$ 11.00 0.00
TILE SETTER......................$ 14.98 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
STATEMENT OF WORK
SABER
56th CIVIL ENGINEER SQUADRON
LUKE AFB, AZ
STATEMENT OF WORK
December 2010
Table of Contents
161.
Project Description:
172.
General Information:
173.
Work by the Government:
174.
Technical Design Support:
185.
Performance Capabilities:
196.
Construction Requirements:
207.
Quality Control:
218.
Provisions on Contracting Officer’s Authority:
219.
RS MEANS (National) Total Bare Cost:
2310.
Developing the Contractor’s Coefficient:
2411.
RS MEANS City Cost Index (CCI):
2512.
Non-Priced Line Items (NPI):
2613.
How the Total Project Cost is computed
2614.
Task Order Procedures:
2815.
Finishes IDIQ Economic Price Adjustment Supplement Line Items:
2816.
Computer and Software Requirements:
2917.
Pre-Performance Conference:
3018.
Construction Start up Period:
3019.
Commencement, Execution, Completion and Payment for Work:
3020.
Weather Days:
3121.
Welding Permit:
3122.
Excavation Permit (dig permit):
3223.
Pre-Final and Final Inspection:
3224.
Warranty:
3325.
Government Furnished Equipment:
3326.
Work in Occupied Areas:
3427.
Coordination with Government Activities:
3428.
Noise Control:
3529.
Construction Site Maintenance:
3630.
Contractor Parking:
3631.
Environmental Laws and Regulations:
3732.
Environmental Protection:
4033.
Security Requirements:
4234.
Work In Special Areas:
4235.
Unauthorized Reconnaissance:
4336.
Airfield Requirements:
4337.
Flight Line Access:
4338.
Safety Assurance:
4539.
Safety and Health:
4640.
Explosive Operated Tools:
4741.
Completion of Contract:
4742.
Applicability of Complete Wage Rate Decision:
4743.
Contractors As-Built Drawings:
4844.
Government Furnished Drawings:
4945.
Hours of Work:
4946.
Contractor On-Base Facility:
5047.
Material Submittals:
5148.
Government Liability:
5149.
Toilet Facilities:
5150.
Contractors Use of Electromagnetic Emission Devices:
5151.
Availability of Utilities and Services:
5152.
Severe Weather Warning:
5253.
Transportation of Construction Equipment:
5254.
Indoor Outdoor Barricades:
5255.
Removal and Replacement Responsibility:
5256.
Utility Outages:
1. Project Description:
A. This is a firm fixed-price, indefinite-delivery, indefinite-quantity (IDIQ)contract for Multiple construction trade work at Luke AFB, Gila Bend AF Auxiliary Field (to include the Barry M. Goldwater Range), and Fort Tuthill Recreation Area, Flagstaff, Arizona (SABER). Each construction project will be awarded by issuing individual Task Orders (TO) against the basic contract on an as needed basis. The contractor will be required to furnish all materials, equipment, and personnel necessary to design, manage, and accomplish the project. Projects will be in support of real property maintenance, repair, alteration, and new construction
B. The Contractor will be required to furnish all materials, equipment, and personnel necessary to design, manage, and accomplish the job. There is NO REQUIREMENT for the contractor to establish and maintain a management office on Luke AFB, AZ in order to receive Requests For Proposal's and provide other management services related to accomplishing individual task orders, but if the contractor would like to establish and maintain an on-base management office, lot space will be provided if available. Individual jobs will vary in size from $2,000 to $750,000 with the majority expected to be small to medium size $5,000 to $100,000. The jobs will include tasks in a variety of trades, but not limited to: carpentry, excavation, electrical, steam fitting, plumbing, sheet metal, painting, demolition, concrete, masonry, welding, HVAC, asbestos removal, etc.
C. The contractor must provide sufficient technical support and project management to assure quality and completeness of designs and drawings when applicable, accuracy of estimates; accommodate a number of concurrent "active" projects; provide flexibility of staff and subcontractor pool to handle rapid increases in work volume, perform according to schedule, on time completion, process submittals in a timely manner; and present a professional demeanor and positive attitude of personnel.
D. Commencement of the contract will be within 10 days of Notice To Proceed (NTP) and the duration will be twelve (12) months basic year period with two twelve (12) month option periods, which may be awarded at the option of the Government. The minimum amount for the life of the contract (basic year plus option) is $5,000.00 and the "maximum" amount for the life of the contract is estimated at $10,000,000.00 E. If the Government's requirements for services set forth in the solicitation does not result in orders totaling the amount described as "maximum" this shall not constitute the basis for an equitable price adjustment under this contract.
2. General Information:
The following documents will be used in the execution of projects under this contract.
A. SABER Statement of Work
B. SABER Base Specifications
C. Luke AFB, Master Specifications
D. All ‘Section 6 Construction Requirement’ documents
E. SABER Cost Estimating System
a. The “e4Clicks Professional Project Estimator” or “e4Clicks Premier Project Estimator" software in conjunction with the current year “RS MEANS Master Composite Bare Cost” Database will constitute the Unit Price Book (UPB) for this contract. This UPB will be used by both the Government and Contractor to develop estimates and proposals for each task order including modifications.
b. Quantities calculated for preparing estimates for Task Orders shall be “net”. Additional quantities/items for waste, lap, damages due to delivery, protection of Government property, license, certifications, additional Engineering design support etc. will not be allowed in the estimates or Task Order. These costs shall be accounted for in the contractor’s price coefficient.
3. Work by the Government:
The Government is not obligated to issue any particular type of work under this contract and reserves the right to accomplish work using government workforces or by other contracts, as the government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
4. Technical Design Support:
A. The contractor's design capabilities are of utmost importance. The Contractor's staff shall have multidiscipline experience. Areas of required technical design competence shall include engineering and drafting capabilities. The contractor's design must comply with the requirements of all building codes listed in Section 6 "Construction Requirements".
B. The government will only provide basic concept design information for a specific work requirement. The contractor, using the concept design information, as well as all governing codes and Luke AFB Specifications, will be required to complete the design and provide construction drawings. Construction drawings must be complete to a point where the drawings clearly indicate the proposed method of accomplishing the work. The Contractor is expected to use recognized industry standard practice in determining his proposed design materials and methods, unless the government specifies otherwise.
C. If specifically required by the Contracting Officer, on a particular Task Order, the contractor may be required to furnish documents/drawings bearing the stamp and signature of a registered architect or professional engineer.
5. Performance Capabilities:
A. Throughout the life of this contract, whenever there are active TO's, the Contractors Project Manger (CPM) shall be available during normal business hours to meet with the Contracting Office or his/her representative, at the location specified, within one (1) hour after notification by telephone. The CPM shall be available to meet with the CO or his/her representative within 24 hours when there are no active TO's. The CO must be able to contact the CPM at all times by dialing a local telephone number. The Contractor’s Project Manager (CPM) shall provide overall contract management, including full authority to develop TO proposals, negotiate, sign award/modification paperwork, supervise individual project superintendents, provide subcontract purchasing and administration, review material submittals and shop drawings, and shall attend all weekly status meetings, site visits and final inspections. The CPM should have a minimum of 5 years previous experience as primary manager of a Government contract or general contracting firm engaged in similar multiple discipline commercial construction projects. In addition the CPM must be experience with managing multiple subcontractors.
B. Whenever there are active TO's, contractor personnel with the following management/technical support capabilities must be available to properly manage/superintend all TO proposals being developed and/or work under construction
a. Contractor's Project Superintendent (CPS) - Provides on-site supervision of active TO's. The CPS shall visit each active project site daily, submit detailed weekly progress reports (AF Form 3065) for each Task Order, schedule and coordinate subcontractors and material suppliers, and attend all weekly status meetings, site visit, and pre-final/final inspections. Superintendents should have a minimum of 5 years previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects.
b. Contractor's Quality Control Manager (QCM) - Provide quality control management for all active TO's and executes the contractors QC plan. The QCM shall visit each active project site daily to ensure full compliance with all safety requirements, and verify that the materials and workmanship are in accordance with approved construction drawings, shop drawings, material submittals and technical specifications. The QCM shall prepare and coordinate material submittal sheets and shop drawing submittals, prepare QC reports, schedule and coordinate testing procedures and attend all weekly status meetings, site visits, and pre-final/final inspections. The QCM shall be someone other than the CPM or CPS. QCM shall have a minimum of five years experience in Quality Control Management of multidiscipline construction projects.
c. The contractor must provide contact information for all key personnel to include phone number and email address.
C. The Contractor shall also provide and maintain the following capabilities, at a local or remote office, to support the SABER contract:
a. Cost estimator - Provide estimating support, capable of producing accurate quantity take-offs and cost proposals. The estimator should have previous experience in development of detailed quantity take-off and line item cost estimates for multi-discipline SABER or commercial construction projects. Estimator can be CPM.
D. Percentage of work to be completed by contractor in house according to FAR 52.219-14.
a. Specialty construction. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
6. Construction Requirements:
A. All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction start-up.
a. Uniform Building Code
b. Current National Electrical Code
c. NFPA 70
d. NFPA 780
e. Life Support Code – 101
f. UFC 3-560-01
g. AFI 32-1065
h. AFOSH 91-501 and 91-66
i. Mil HDBK 419A
j. National Fire Code
k. Master Base Specifications
l. Uniform Mechanical Code
m. National Plumbing Code B. The contractor shall maintain or have access to these documents during the term of this contract.
C. If there is a conflict between these codes, regulations and Master Base Specifications the most stringent requirements shall apply at all times.
7. Quality Control:
A. The Contractor shall submit a Quality Control Plan that clearly describes the contractor's quality control program/process. This plan should address all aspects of quality control, including responsibility for surveillance of work by both subcontractors and in-house quality control inspectors, process for acceptance, rejection, documentation and resolution of deficiencies, trend analysis, and any other areas that specifically and exclusively relates to the acceptable completion of work and subsequent government inspections and approval. The Quality Control Plan shall be approved by the Government prior to commencement of work. This Quality Control Plan shall include all phases of the construction process from design through project completion. The plan should ensure that all components of construction meet industry standards. This plan will remain in effect for the life of the contract. The Contractor shall maintain adequate Quality Control capabilities regardless of the volume of workload. The Government reserves the right to request any necessary changes to the QC plan during the life of the contract. Individual Quality Control Plans will not be required for each TO.
B. The contractor will be required to institute a comprehensive Quality Control Program in order to assure himself and the Government that all materials and workmanship are in strict accordance with the SABER specifications, Base Regulations, Federal, State and Local Codes. It is the Contractor's responsibility to provide, inspect, and document the level of quality that has been established by the minimum standards of the Statement of Work and the SABER Specifications.
C. Quality Control Manager: The Quality Control Manager shall direct the execution of the Contractor's approved Quality Control Plan with exclusive responsibility for administration of the plan and inspection of work. The Quality Control Manager shall be available during normal duty hours to investigate and resolve all problems related to Quality Control when notified by the Government Inspector and/or Contracting Officer that a problem exists. The Quality Control Manager shall be a separate individual from the Project Manager or Project Superintendent.
D. Government Inspection: When the Contractor considers that the work is acceptable to the Government and is complete to include final clean-up, he shall inform the Contracting Officer that the work is complete and ready for inspection. The Contracting Officer and his representative may inspect the work on site. In the event that the work is not acceptable, the Contractor shall record a list of items noted by the Government to be corrected. A subsequent inspection may take place in order to review the corrected items. The Government is not required to inspect all work. Disclaimer; The government inspection does not negate the need for regular contractor quality control nor does it indicate either expressed or implied that all codes, safety regulations or any other criteria have been followed properly.
E. Government Approval of Work: The Government will notify the Contractor that work for a specific Task Order is or is not acceptable. Invoices for a specific Task Order shall not be permitted until the Government has accepted the work.
8. Provisions on Contracting Officer’s Authority:
No person other than a Contracting Officer shall have authority to modify the terms of this agreement. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this agreement and not withstanding any provisions contained elsewhere in this agreement, the said authority remains solely with the Contracting Officer. The contractor will not take direction from anyone other than the Contracting Officer. In the event the contractor effects any such changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. The Contracting Officer is the only person who can obligate the government; input taken an acted on that changes the contract (other than health/life safety concerns) in any way received from the user, Civil Engineering or anyone else besides the contracting officer is done so at the sole financial and legal responsibility of the contractor.
9. RS MEANS (National) Total Bare Cost:
A. Line items for each delivery order will be derived from the RS MEANS unit pricing book. The National Total Bare Cost (which excludes RS Means overhead and profit) is derived by adding RS MEANS bare cost of material, labor and equipment as shown in Figure 1 and Figure 2 below. Depending on the specific line item from the RS MEANS unit pricing book any combination of material, labor and equipment may be added Figure 1: RS MEANS (National) Total Bare Cost Example shows how the (National) total bare cost is calculated when there are no equipment costs.
Figure 2: RS MEANS (National) Total Bare Cost Example shows (National) total bare cost when material labor and equipment are added.
10. Developing the Contractor’s Coefficient:
A. There shall be one price percentage factor (coefficient) for work at Luke AFB, AZ and one for each off-site locations covering Standard Hours (work during normal duty hours) and Non-Standard Hours (any authorized work outside normal duty hours).
B. Coefficient is defined as a numerical factor that compensates the Contractor for any and all costs (generally indirect costs) and profit not included in the unit pricing book line item for National Total Bare Cost. Coefficients shall include but not be limited to overhead, profit, labor burden, bond premiums, insurance, taxes, administrative and technical support, costs associated with procurement of required tools, dumpsters and other equipment. No allowance will be considered later for these costs.
C. The Contractor shall consider the following factors which affect the calculation of the coefficients:
a. The coefficients are fixed for the term of the contract, as proposed for each contract year.
b. The UPB prices are for “in-place” quantities. There shall be no allowances added for waste, compaction, storage, shipping, staging, handling, etc.
c. The coefficient shall cover all items including all general conditions, profit, overhead, administrative/technical support and labor burden for the prime Contractor’s office staff and workforce.
d. All vehicles, office supplies/setup, administrative requirements, dumpsters, and equipment/tools which are customary to the trade shall be part of overhead, and therefore included in the coefficients. Under normal circumstances, no equipment/tool rental will be allowed as a direct cost to any Task Order. For example, the Contractor shall provide and maintain equipment/tools such as a generator, gasoline powered pump with hoses, laser level, flatbed trailer, etc. The cost of maintaining, operating, mobilizing, demobilizing and transporting the contractor’s equipment shall be included in the coefficient.
e. Daily clean-up shall be performed at all active project sites. It shall NOT be a direct Task Order cost but shall be paid from the coefficient.
f. Equipment rental shall NOT be allowed as a direct cost to any Task Order, except under special circumstances such as performing work which is not normal for a given trade.
g. Tarpaulins, temporary controls, safety rails, safety nets, tethers, face and clothing protection, Traffic and work site signs, barriers, flag persons, site security, required permits, licenses, submittals, drawings, and other risks to doing business shall be included in the coefficient.
D. Separate coefficients shall be proposed by the contractor for each of the following bid items:
a. Standard hour work at Luke AFB, AZ
b. Non-standard hour work at Luke AFB, AZ
c. Standard hour work at Gila Bend AF Auxiliary Field (to include the Barry M. Goldwater Range).
d. Non-standard hour work at Gila Bend AF Auxiliary Field (to include the Barry M. Goldwater Range).
e. Standard hour work at Fort Tuthill Recreation Center, Flagstaff, AZ.
f. Non-standard hour work at Fort Tuthill Recreation Center, Flagstaff, AZ.
E. The Contractor shall propose a coefficient for each year in the contract. Coefficients WILL NOT be adjusted after the initial proposal is accepted. In certain rare cases, economic price adjustment for commodities can be considered.
11. RS MEANS City Cost Index (CCI):
A. The RS MEANS City Cost Index is a tool used to compare costs from city to city. The city cost index is a percentage ratio of a specific city’s cost as it compares to the national average, the RS MEANS national total bare cost.
B. For work on Luke, AFB the Phoenix CCI will be used and is updated by RS MEANS quarterly. Please refer to Figure 3 for more information on the city cost index.
Figure 3: Example of past City Cost index. In this case, work in Phoenix, AZ is 88.7% of the national average, as defined by RS MEANS (National) Total bare cost.
12. Non-Priced Line Items (NPI):
A. Any item of work not found in the Unit Price Book (UPB) but required under an individual Task Order may be negotiated by the Contracting Officer or his/her designated representative as a Non-Priced Item. The negotiated price of a Non-Priced Items will be the "in-place" price to include material, equipment, and labor (exclusive of the Contractor's or sub-contractor's indirect expenses such as overhead, profit, labor burden, etc) multiplied by the applicable percentage factor (Coefficient) in effect at the time of submission.
B. Non-priced items once negotiated and used in a Task Order will be added to the Special Luke Item (SLI) Supplement to the UPB. Uses of items previously added to the SLI Supplement in subsequent Task Orders shall be considered pre-priced items in those subsequent Task Orders
C. The total dollar amount of all non-priced items for a individual Task Order cannot exceed 10% of the total cost of the Task Order unless a waiver is obtained from the installation commander. No Task Order will be issued when the total amount of all non-priced items exceeds 25% of the total estimated cost of a specific Task Order. The contractor shall track the total non-priced dollar percentage for each Task Order and shall clearly indicate the percentage on each new Task Order or modification proposal.
D. If the contractor's Task Order proposal includes any non-priced items, the items cost must be negotiated. The burden of justification for the dollar value of the NPI falls on the Contractor, who must provide documentation from three independent sources of the actual installed cost of the item. The following documentation shall be provided at negotiations:
a. A minimum of three (3) independent written price quotes which shall include; material(s) description with unit price and installation cost. The price quotes must be submitted on the contractor’s letterhead and be signed by the owner or authorized representative of the company.
E. Although “non-priced items (NPI)" of work will be negotiated, this shall not be construed to include elements of work which are not separately priced but which are incidental to or are customarily required for performance of a priced item of work.
F. NPI are priced for the local market and therefore are not adjust by the local city cost index. For information regarding how NPI are totaled using the contractors coefficient please refer to the section detailing Task Order Procedures under Non-Priced Line Items.
13. How the Total Project Cost is computed
A. The total project cost is derived using the RS MEANS (National) Total Bare cost for every line item required to complete the project, the corresponding City Cost Index and the Contractors derived coefficient.
B. The RS MEANS (National) Total bare cost line items are multiplied by the contractor’s coefficient and the city cost index as follows.
(RS MEANS (National) Total Bare Cost ) x (City Cost Index) x (Contractors Coefficient)= Total Cost
C. The following is a numerical example for further clarification.
RS MEANS (National) Total Bare Cost = $10,000
Phoenix, AZ City Cost index = 88.7 %
Contractor’s Coefficient = 15%
($10,000) x (.887) x (1.15) = $10,200.50
14. Task Order Procedures:
A. As the need exists for performance under the terms of this contract, the Contracting Officer or his/her authorized representative will notify the contractor of an existing performance requirement and request a price from the Contractor for a "one job, lump sum" Task Order. The Government will provide to the Contractor a Request for Proposal (RFP) with a Statement of Work (SOW) describing the work to be performed, which may include special instructions and conditions, and potentially a Material Submittal Register (AF Form 66). The Contractor WILL NOT be reimbursed for any Pre Task Order costs including proposal preparation and attendance during negotiations or site visits.
B. The contractor shall respond to an RFP within three (3) working days by visiting the proposed work site in the company of the Contracting Officer or his/her authorized representative, the SABER project manager/inspector, and a representative of the using agency. The purpose of this site visit will be to establish a clear understanding between the Contractor and Government as to what work will be required in the Task Order. On-site changes may be made to the SOW or drawings at this time if the contractor or the government identifies items of work that have been left out which needs to be accomplished as part of the task order.
C. Upon establishment of the scope of the individual requirement, the contractor shall then prepare his detailed proposal by identifying tasks, refining quantities, developing cost estimate, preparing construction drawings and or detailed engineering plans/drawings (as the requirements exists) developing performance times, preparing his proposal documents, which includes a detailed statement of proposed work, for submission to the Contracting Officer.
PRICED LINE ITEMS
a. The SABER RS MEANS unit price book shall serve as the basis for establishing the value of the work to be performed on a unit price basis.
b. The contractor's proposal on every Task Order must be supported by necessary documentation as required, to indicate that adequate engineering and planning to accomplish the requirement have been done so as to minimize any delays in the construction process. Examples of documentation that might reasonably be expected would include sketches, construction drawings, calculations, catalog cuts, specifications, architectural renderings, detailed scope of work etc.
c. The contractor's proposal on each Task Order must also be supported by a detailed materials take-off with applicable pricing applied from theSABER Unit Price Book.
d. Cost estimate shall be submitted in the format approved by the Contracting Officer. The contractors coefficient will be applied to the RS MEANS Construction Data Total National Total Bare cost, after the City of Phoenix Cost Index is applied as shown in section 13.
(RS MEANS National Bare Cost ) x (City Cost Index) x (Contractors Coefficient)= Total Cost
e. Time allowed for submittal of the contractor's proposal documents for individual requirements will be ten (10) calendar days from the date of site visit or as agreed upon by the Contracting Officer and the contractor.
NON-PRICED LINE ITEMS
a. All non-priced work to be included in an individual project proposal must be supported with the information called for in Section 12 Non-Priced Line Items
b. Non-Priced Line items are totaled different that Priced line items using only the RS MEANS National Total Bare Cost multiplied by the contractors coefficient. The City Cost Index is NOT used in the calculation of the total cost for non-priced line items. This is because the research used to arrive at the NPI is done in the local market.
(RS MEANS (National) Total Bare Cost) x (Contractors Coefficient) = Total Cost
D. Upon receipt of the contractor's proposal, the Government will review the proposal for completeness. The Government will negotiate with the contractor line items, quantities, for all pre-priced and non-priced items, and performance times within ten (10) calendar days of receipt of the proposal.
E. A Task Order will then be issued by the Contracting Officer using a DD form 1155.
F. If differing site conditions or changes to the scope of work are encountered after Task Order award, a modification to the TO shall be made.
G. The contractor will be required to submit weekly payroll reports for his/her office staff to the Contracting Officer for the total contract period.
a. For each Task Order issued, a weekly payroll report must be submitted to the Contracting Officer in order to ensure compliance with the Davis Bacon wage rate.
H. Normally, the contractor will only be paid monthly for completed Task Orders. If the performance period of a Task Order exceeds 30 days, partial payment(s) may be authorized.
15. SABER Economic Price Adjustment Supplement Line Items:
Unit prices in the SLI supplement shall be adjusted quarterly by a percentage, to be determined by the Construction Cost Index (CCI) for the city of Phoenix AZ as published in the McGraw Hill publication ENR (Engineering News Record) to determine increases or decreases in labor and material. To determine the amount of adjustment, the CO will calculate the change in the index appearing in the issue of the ENR. Once the quarterly percentage of change has been determined, it shall be used to adjust each unit price in the SLI supplement.
16. Computer and Software Requirements:
A. The Contractor shall provide, at his cost, all project estimating software needed to develop cost estimates for Task Order cost proposals. In addition he must provide, install, and maintain all computer hardware for contractors use. The Contractor is not required to provide the Government with any computer hardware, since it has its own.
B. The Government SABER Office shall be provided, at contractor’s expense, with the latest version of "e4Clicks Premier Project Estimating" software and the current version of "R.S. Means Master Composite" database. Two (2) user license will be required. All software provided to the Government SABER Office shall be licensed to the government and shall become the property of the government upon delivery. There is NO SUBSTITUTE for the referenced software. To ensure effective cost estimation procedures for individual SABER Task Orders, the contractor shall use as a minimum "e4Clicks Professional Project Estimator". If the Contractor prefers he can use "e4Clicks Premier Project Estimator" software which provides additional Project Management capabilities.
C. Each Task order proposal shall be prepared using the most current version of "e4Clicks Professional or Premier Project Estimating" software and the current year "RS Means Facilities and RS Means Master composite. Construction Cost" database and submitted in a format approved by the Contracting Officer. All software items are obtainable through 4 Clicks Solutions, P.O. Box 76884, Colorado Springs, CO. 80970, Phone (719) 574-7721. Information and software pricing can be obtained by emailing "sales@4clicks-solutions.com" and referring to the Luke AFB SABER contract.
D. The Contractor shall furnish and install the RS MEANS annual unit price updates on the Contractor’s computer(s) each year at option renewal, or as agreed to by the Contracting Officer, throughout the term of this contract. The contractor will also be responsible for providing the government, at contractor’s expense, a 4Clicks Solutions Maintenance Agreement and the RS Means annual unit price updates at the same time. Two (2) user license will be required. The government and contractor will schedule the annual updating of the RS MEANS Facilities Construction Cost Database so that it occurs at the same time.
E. The contractor shall be responsible for providing initial training (including cost) on the use of the selected estimating system software to Contractor employees and up to 15 Government employees. Training must be complete within the first 15 calendar days of initial start up period or as agreed to by the Contracting Officer.
F. The Contractor shall also install and maintain a copy of the latest version of AutoCad (to be verified by contracting officer) on contractor’s equipment for the development of construction drawings and "As-Built" drawings. In addition if the Contractor elects to establish a Management Office on Luke AFB he/she must be able to get E-Mail on the computer(s) located in this office. All drawings submitted by the Contractor shall be created from Computer-Aided Design and Drafting (CADD) software. Drawing files shall be compatible with AutoCAD, without any need for translation or modification by the government. AutoCAD drawings shall comply with the Tri-Service Center’s A/E/C and Spatial Data Standards. Custom menus, line types and text styles shall NOT be used without prior approval of the Contracting Officer. All external reference drawings if used must be provided with the basic drawing and be modifiable if required. The Contractor shall submit all CADD drawing files on a CD-ROM.
17. Pre-Performance Conference:
Prior to issuance of the first Task Order under this contract, the Contracting Officer may elect to host a pre-performance conference. The purpose of this conference shall be to acquaint the Contractor with Government policies and procedures that are to be observed during the prosecution of this work and to develop mutual understanding relative to the administration of the contract. The Contractor and subcontractors shall be represented at the scheduled conference and be prepared to discuss potential difficulties and obstacles.
18. Construction Start up Period:
A. Construction will start with a SEED project that will be awarded at the same time as the contract.
19. Commencement, Execution, Completion and Payment for Work:
A. The Contractor shall be required to commence work required by a Task Order at the time specified on the Notice To Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction. Provisions for liquidated damages will be determined on each Task Order by the Contracting Officer.
B. The Contractor will be paid monthly upon submission of proper invoices for completed Task Order's. If the performance period for a TO exceeds 30 days and a progress schedule (AF Form 3064) has been submitted and approved partial payment(s) may be authorized. Invoices shall be submitted to the Contracting Officer on a monthly basis for each individual TO that partial payments have been authorized. Final payment on a TO will be withheld until all discrepancies are corrected and as-built drawings are approved by the Government Project Manager.
C. The Contractor acknowledges that the construction undertaken pursuant to this contract or agreement is subject to the provisions of Arizona Revised Statutes, Title 10, Section 32-1101 et. seq., and the jurisdiction of the Arizona Registrar of Contractors.
20. Weather Days:
A. The 56th Operations Support Squadron, Weather Operations Flight (OSW) located in Bldg. 453 (623-856-6837) publishes the historical average number of days that precipitation is expected for each month of the year. The Contractor shall consider this information when estimating Task Order performance times. The Contractor's Task Order proposals shall stipulate the number of weather days and performance days included in the total performance time. For outside work, the published average number of weather days shall be included in any negotiated performance time. Should inclement weather over and above the published average occur, the Contractor may request additional time if the work was affected.
B. Any request for additional weather days must be annotated in the remarks section of the Contractor's weekly progress report (AF Form 3065), and shall include the following information:
a. Each specific day requested.
b. Reason for each day requested, including which trades were affected
C. The Weather Operations Flight publishes a monthly weather report of actual daily temperatures and precipitation at Luke AFB. Any day when only a "trace" of precipitation was recorded will not be considered a rain day.
21. Welding Permit:
No welding, soldering, torch cutting, or open flame torch jobs will be permitted without first obtaining an AF Form 592 “Welding Permit” from the Base Fire Department. A copy of the AF Form 592 "Welding Permit" will be posted at the job site when ever torch work is in progress. All fire and safety regulations are to be stringently followed.
22. Excavation Permit (dig permit):
A. The contractor shall apply for and obtain a properly approved and Coordinated excavation permit(s) (AF Form 103) prior to any excavation. The SABER project manager upon request will provide the contractor with a blank AF Form 103 which is to be filled in by the contractor. The contractor shall attach to the AF Form 103 drawings and/or details showing the exact location and description of the type of excavation to be accomplished. The contractor shall insure that the location of all underground utilities, once located and marked by the government, are adequately maintained to preclude remarking by government personnel. Should any one of the coordination points indicate an additional underground utility or structure over and above those shown on the contract drawing either by sketch on the contractor's drawing, by field pointing, or by flagging, the contractor shall be responsible for protection of each of the items indicated. If the Contractor damages any of the items indicated, he shall be responsible for prompt repair of the damage to return the item to its original workable condition.
B. Excavations for street and existing utility will also include the following requirements unless waived by the Contracting Officer. Prior to the start of work, all valve locations will be identified/located so the utility can be shut off in the event of accidental damage.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .