03200-002-033 mech schedules.pdf
PDF 8 MB Posted
- Solicitation number
- FA487725R0001
About this file
This mechanical schedule drawing shows detailed specifications for HVAC and related building systems for a Consolidated Base Personnel Office project. The drawing includes multiple technical schedules: Air Handling Unit Schedule with cooling coil and heating coil specifications, Exhaust Fan Schedule, Heating Boiler Schedule, Sound Trap Schedule, Water Chiller Schedule, Piping Symbol Schedule, Circulating Pump Schedule, Grilles/Registers/Diffusers Schedule, and Cooling Tower Schedule.
The document appears to be a technical specification sheet that would be used during construction or renovation work, providing detailed mechanical systems information for contractors. The drawing includes specific performance requirements, dimensions, and technical specifications for each system component. A comprehensive piping symbol legend is included to assist in interpreting the mechanical systems layout. The drawing is marked as "SAFETY PAYS" at the bottom and appears to be prepared by professional engineers/architects as indicated by the title block.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .