03200-002-031 controls.pdf

PDF 6 MB Posted

Attached to
Davis-Monthan AFB, Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ
Solicitation number
FA487725R0001
Issued by

About this file

This is a mechanical control diagram showing HVAC system schematics for a Consolidated Base Personnel Office building. The drawing includes detailed control diagrams for multi-zone air handling units, a chiller system, control air supply, and a unit control panel layout.

The document contains an A/C Control Equipment Schedule listing various control components and their settings, along with a sequence of operation for the multi-zone unit, outside air schedule specifications, and heating/hot water reset details. The drawing appears to be part of a larger set of mechanical engineering plans, with notations for "Value Engineering Pays" and "Safety Pays" at the top and bottom. This technical drawing would be used by contractors to understand the HVAC control requirements for this facility construction or renovation project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .