Project Package 3 - Wage Determination - Construction Type

117 KB Posted

Attached to
DMAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4877-12-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Project Package 3 - Wage Determination - Construction Type (Building)

Text of this file

General Decision Number: AZ120001 01/06/2012 AZ1 Superseded General Decision Number: AZ20100001 State: Arizona

Construction Type: Building

Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma Counties in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 01/06/2012

BRAZ0003-003 11/23/2009

COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the

San Francisco River to the Gila River), & YUMA COUNTIES

Rates Fringes

Bricklayer - Cement Block

Layer............................$ 24.62 4.57

BRAZ0003-008 11/23/2009

PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES

Rates Fringes

Bricklayer - Cement Block

Layer............................$ 18.00 4.49

CARP0408-001 07/01/2011

Rates Fringes

CARPENTER........................$ 23.00 8.49

CARP1327-001 07/01/2011

Rates Fringes

DRYWALL HANGER...................$ 19.25 6.46

* ELEC0570-003 12/01/2011

PIMA, PINAL (Southern Part), AND YUMA COUNTIES

Electrician/Wireman..............$ 23.75 18%+4.70

ZONE DEFINITIONS-

Zone A: the area within a twenty-nine (29) mile radius from a basing point at the Tucson Town Hall.

Zone B: 29 to 46 mile radius from the town hall in Tucson- an additional $ 1.25 per hour Zone C: 47 mile radius from the town hall in Tucson to the outer limits of the geographic jurisdiction-an additional $ 3.75 per hour

ELEC0640-005 06/21/2011

COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then North to the Maricopa-Pinal County Lines) COUNTIES

Rates Fringes

Electrician/Wireman..............$ 25.01 3%+7.50

ENGI0428-003 06/01/2010

Rates Fringes

Power Equipment Operator

(2) Crane under 15 tons.....$ 25.22 9.79

(3) Crane,15 tons to 100 tons........................$ 26.30 9.79

(4) Crane, 100 tons and over........................$ 27.33 9.79

IRON0075-002 08/01/2011

IRONWORKER, STRUCTURAL...........$ 26.52 19.35

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO0383-005 06/01/2009

Rates Fringes

LABORER (Brick/Block Tender).....$ 16.72 4.35

PAIN0086-003 04/01/2010

Rates Fringes

PAINTER..........................$ 17.85 4.70

PAIN0086-005 06/01/2011

Rates Fringes

GLAZIER..........................$ 26.50 6.98

PLUM0469-002 07/01/2011

ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES

ZONE B: PIMA AND PINAL COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER

Zone A......................$ 32.50 15.15

Zone B......................$ 29.15 14.25

SFAZ0669-001 04/01/2011

SPRINKLER FITTER (Fire

Sprinklers)......................$ 29.85 17.45

SHEE0359-002 08/01/2011

PIMA and PINAL (South of the 33rd Parallel) COUNTIES

Rates Fringes

Sheet Metal Worker (Including

HVAC)

Zone 1......................$ 29.55 14.05

SHEE0359-003 08/01/2011

COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES

Rates Fringes

Sheet Metal Worker (Including

HVAC)............................$ 29.55 14.05

SUAZ2004-001 01/14/2004

Rates Fringes

Cement Mason/Finisher............$ 15.25 5.01

Laborers

Concrete Worker.............$ 8.88 0.00

Form Setter.................$ 9.63 0.00

General/Cleanup.............$ 11.37 2.91

Waterproofing...............$ 12.59 0.00

PLASTERER........................$ 15.00 0.00

Power Equipment Operator

Backhoe.....................$ 14.78 0.00

TILE FINISHER....................$ 11.00 0.00

TILE SETTER......................$ 14.98 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in theexample, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files for this federal contract opportunity

Other files attached to DMAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA4877-12-R-0008-0002 MACC Amendment 2.pdf PDF
Appendix D - —
Appendix D - —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings - Facility 4101.zip ZIP file
Project Package 2 - Electrical-Comm Site Plan.pdf PDF
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 1 - Bldgs 4101 and 4455 Various Asb Reports.xlsx XLSX spreadsheet
Appendix D - Davis-Monthan AFB CIP Data Contour Data.zip ZIP file
Appendix E - DoD Minimum Antiterrorism Standards for Buildings - UFC 4-010-01.pdf PDF
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt PPT presentation
FA4877-12-R-0008-0001 MACC Amendment 1.pdf PDF
Special Event EAL - Your Companys Name.xls XLS spreadsheet
MACC Site Visit Clarifications and Instructions - 17 May 12 at 0900 - Swan Gate.pdf PDF
ID2 - Davis Monthan - Jan11.pdf PDF
Project Package 4 - Wage Determination - Construction Type —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 4 - MACC Bid Schedule Seed Project 4.xlsx XLSX spreadsheet
Appendix A- Design Compatibility guidelines —
Project Package 3 - Section 01010 - Summary of Work —
Project Package 4 - Section 01011 - Design Requirements —
Project Package 3 - MACC Bid Schedule Seed Project 3.xlsx XLSX spreadsheet
Project Package 3 - Project Drawings —
Project Package 4 - Project Drawings.pdf PDF
FA4877-12-R-0008 MACC.pdf PDF
Project Package 3 - Project Drawings —
Wage Determination 05-2025 —
Project Package 3 - Project Drawings —
MACC Statement of Work.pdf PDF
Project Package 2 - Section 01010 - Summary of Work —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 2 - Project Drawings - Temporary Maintenance Bay At Facility 1750.pdf PDF
Project Package 2 - MACC Bid Schedule Seed Project 2.xlsx XLSX spreadsheet
Project Package 3 - Project Drawings —
Project Package 3 - Project Drawings —
MACC Wage Determinations —
Project Package 2 - Section 01011 - Design Requirements —
Project Package 2 - Section 01011 - Design Requirements —
Show all 50

DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .