Project Package 3 - MACC Bid Schedule Seed Project 3.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
DMAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4877-12-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Project Package 3 - MACC Bid Schedule Seed Project 3

View the file

Other files for this federal contract opportunity

Other files attached to DMAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Clarifications and Corrections to Site Visit Meeting Minutes.pdf PDF
Appendix D - —
Project Package 1 - Section 01011 - Design Requirements - Revised.pdf PDF
Project Package 1 - As-Built Drawings —
Project Package 3 - As-Built Drawings - Facility 145.zip ZIP file
Project Package 3 - As-Built Drawings - Facility 81.zip ZIP file
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 3 - Project Drawings —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 1 - Section 01011 - Design Requirements —
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt PPT presentation
Arizona Transaction Privilege Tax Ruling - TPR 99-1.pdf PDF
MACC Statement of Work - Revised.pdf PDF
Pre-Proposal Conference Site Visit Meeting Minutes - MACC.pdf PDF
Project Package 3 - Project Drawings —
Project Package 4 - Project Drawings.pdf PDF
FA4877-12-R-0008 MACC.pdf PDF
Project Package 3 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Wage Determination 05-2025 —
Project Package 3 - Project Drawings —
MACC Statement of Work.pdf PDF
Project Package 1 - MACC Bid Schedule Seed Project 1.xlsx XLSX spreadsheet
Project Package 1 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Project Package 1 - Airman Leadership School Design Guide.pdf PDF
Project Package 3 - Project Drawings —
Project Package 1 - Project Drawings.pdf PDF
Past Performance Questionnaire MACC.doc DOC document
Project Package 4 - Section 01010 - Summary of Work —
Project Package 3 - Project Drawings —
Project Package 2 - Wage Determination - Construction Type —
Appendix C- 355 CES EMO Civ Contractor Environmental Guide.pdf PDF
Project Package 1 - Section 01010 - Summary of Work —
Project Package 3 - Project Drawings —
MACC Bid Sheets —
Project Package 3 - Project Drawings —
Project Package 3 - Project Drawings —
Project Package 2 - Section 01010 - Summary of Work —
Show all 50

DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seed #3

MACC BID SCHEDULE - SEED PROJECT #3

DMAFB Project Number:FBNV 12-0038NEWB-08-S-2452NEWB-08-S-2452
Project Name:CONSOLIDATION EC-130 PARTS STORE
Contractor:
A) TOTALS, PER THE STATEMENT OF WORK
Base Bid
Clin #1: DESIGN Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ$_____________

Clin #2: CONSTRUCT Contractor shall furnish all labor, equipment, appliances, and materials and perform all operations necessary in connection with the construction of the new addition for the Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ in strict accordance with Project FBNV 12-0038, subject to the terms and conditions of the contract documents. $_____________

TOTAL CLINS 0001 & 0002 $_________________

Fill out the boxes below based on the total bid price.
B) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0
DMAFB Project Number:FBNV 12-0038NEWB-08-S-2452NEWB-08-S-2452
Project Name:RPR TO FAC 81 FOR CONSOLIDATION EC-130 PARTS STORE
Contractor:
A) TOTALS, PER THE STATEMENT OF WORK
Base Bid
Clin #3: DESIGN Rpr to Facility 81 for the Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ$_____________

Clin #4: Contractor shall furnish all labor, equipment, appliances, and materials and perform all operations necessary in connection with the repair to facility 81 for the Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ in strict accordance with Project FBNV 12-0038, subject to the terms and conditions of the contract documents. $_____________

TOTAL CLINS 0003 & 0004 $______________

Fill out the boxes below based on the total bid price.
B) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0
DMAFB Project Number:FBNV 12-0038NEWB-08-S-2452NEWB-08-S-2452
Project Name:DEMOLITION OF FAC. 145 FOR CONSOLIDATION EC-130 PARTS STORE
Contractor:
A) TOTALS, PER THE STATEMENT OF WORK
Base Bid
Clin #5: DESIGN Demolition of facility 145 for the Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ$_____________

Clin #6: Contractor shall furnish all labor, equipment, appliances, and materials and perform all operations necessary in connection with the demolition of facility 145 for the Consolidation EC-130 Parts Store at Davis-Monthan AFB, AZ in strict accordance with Project FBNV 12-0038, subject to the terms and conditions of the contract documents. $_____________

TOTAL CLINS 0005 & 0006 $______________

SEED #3 PROJECT TOTAL (CLINS 0001 THROUGH 0006) $____________________
Fill out the boxes below based on the total bid price.
B) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0

File details come from the government source that posted it. Updated .