Project Package 2 - MACC Bid Schedule Seed Project 2.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
DMAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4877-12-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Project Package 2 - MACC Bid Schedule Seed Project 2

View the file

Other files for this federal contract opportunity

Other files attached to DMAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Appendix D - —
Project Package 1 - Section 01011 - Design Requirements - Revised.pdf PDF
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 3 - As-Built Drawings - Facility 145.zip ZIP file
Project Package 3 - As-Built Drawings - Facility 81.zip ZIP file
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4101.zip ZIP file
Project Package 2 - Electrical-Comm Site Plan.pdf PDF
Project Package 3 - Project Drawings —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 1 - Section 01011 - Design Requirements —
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt PPT presentation
Appendix D - Davis-Monthan AFB CIP Data Contour Data.zip ZIP file
Appendix E - DoD Minimum Antiterrorism Standards for Buildings - UFC 4-010-01.pdf PDF
Arizona Transaction Privilege Tax Ruling - TPR 99-1.pdf PDF
ID2 - Davis Monthan - Jan11.pdf PDF
Project Package 3 - Project Drawings —
Project Package 4 - Project Drawings.pdf PDF
FA4877-12-R-0008 MACC.pdf PDF
Project Package 3 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Wage Determination 05-2025 —
Project Package 3 - Project Drawings —
MACC Statement of Work.pdf PDF
Project Package 4 - Wage Determination - Construction Type —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 4 - MACC Bid Schedule Seed Project 4.xlsx XLSX spreadsheet
Appendix A- Design Compatibility guidelines —
Project Package 3 - Section 01010 - Summary of Work —
Project Package 4 - Section 01011 - Design Requirements —
Project Package 3 - MACC Bid Schedule Seed Project 3.xlsx XLSX spreadsheet
Project Package 1 - MACC Bid Schedule Seed Project 1.xlsx XLSX spreadsheet
Project Package 1 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Project Package 1 - Airman Leadership School Design Guide.pdf PDF
Project Package 3 - Project Drawings —
Project Package 1 - Project Drawings.pdf PDF
Past Performance Questionnaire MACC.doc DOC document
Project Package 4 - Section 01010 - Summary of Work —
Project Package 3 - Project Drawings —
Project Package 2 - Wage Determination - Construction Type —
Appendix C- 355 CES EMO Civ Contractor Environmental Guide.pdf PDF
Show all 50

DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seed #2

MACC BID SCHEDULE - SEED PROJECT #2

DMAFB Project Number:FBNV 11-0043ANEWB-08-S-2452NEWB-08-S-2452
Project Name:CONS (DEMO/CONSOL) CE SHOPS (FAC 5131)Basewide Facility Repairs, 2008Basewide Facility Repairs, 2008
Contractor:
A) TOTALS, PER THE STATEMENT OF WORK
Base Bid
Clin #1: DESIGN (Demo/Consol) CE Shops (Fac 5131) at Davis-Monthan AFB, AZ$_____________

Clin #2: CONSTRUCT Contractor shall furnish all labor, equipment, appliances, and materials and perform all operations necessary in connection with Cons (Demo/Consol) CE Shops (Fac 5131) at Davis-Monthan AFB, AZ in strict accordance with Project FBNV 11-0043A, subject to the terms and conditions of the contract documents. $_____________

TOTAL CLINS 0001 & 0002 $__________________

Fill out the boxes below based on the total bid price.
B) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0
DMAFB Project Number:FBNV 11-0043DNEWB-08-S-2452NEWB-08-S-2452
Project Name:Demo (Demo/Consol) CE Shops (Fac 5122)
Contractor:
A) TOTALS, PER THE STATEMENT OF WORK
Base Bid
Clin #3: DESIGN Demo (Demo/Consol) CE Shops (Fac 5122) at Davis-Monthan AFB, AZ$________________

Clin #4: CONSTRUCT Contractor shall furnish all labor, equipment, appliances, and materials and perform all operations necessary in connection with Demo (Demo/Consol) CE Shops (Fac 5122)at Davis-Monthan AFB, AZ in strict accordance with Project FBNV 11-0043D, subject to the terms and conditions of the contract documents. $________________

TOTAL CLINS 0003 & 0004 $____________________

SEED #2 PROJECT TOTAL (CLINS 0001 THROUGH 0004) $_________________________
Fill out the boxes below based on the total bid price.
B) SCHEDULE
Input Projected Start Date:
Input Projected End Date:
Total Calendar Days:0DAYS0

File details come from the government source that posted it. Updated .