Asbestos and Lead Paint Tests Bldg 95
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Macrotec Consulting, LLC.
9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677
Demolition Investigation Report Asbestos and Lead Based Paint Survey
Project Information:
Creech Air Force Base Bldg. 82 Work Order #C11120 21243
Report Info:
Macrotec Project # 13580 July 3, 2013
Prepared For:
Vince Bowers 99th Civil Engineering Squadron – CES/CEV Nellis AFB, NV 89191
Prepared By:
Dustin McAllister - Macrotec Consulting, LLC.
Table of Contents:
Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Sample Assessment Recommendations Inspection Limitations
Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Picture Page Appendix D Sample Location Diagram Appendix E Asbestos Laboratory Report Appendix E.1 Lead XRF Results Appendix F Certifications
Asbestos / Lead Survey Macrotec Project # 13580 Creech Air Force Base – Bldg. 95 Page 2
INTRODUCTION
Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint on June 27th 2013. The inspection was conducted for the project defined as: Demolition of building 95 at Creech Air Force Base in Indian Springs, NV.
The intent of this inspection was to identify materials containing asbestos and lead based paint, within the subject site, that may be impacted during planned renovation activities. Macrotec’s inspection services were conducted at the request of Vince Bowers of the 99th Civil Engineering Squadron.
Dustin McAllister, a certified lead inspector, License No. NV-I-16781-1, and a Nevada Asbestos Abatement Consultant, License No.IM0961, and Jason McAllister, a Nevada Asbestos Abatement Consultant, License No. IMP0901, and a certified lead inspector, License No. NV-I-125427-1 conducted these services for Macrotec Consulting.
SCOPE OF SERVICES
Asbestos
Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of:
Nevada OSHA - NAC 618.960 OSHA’s “Criteria to rebut the designation of installed material as PACM
(Presumed Asbestos Containing Material)”, 1926.1101(k)(5).
EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air
Pollutants (NESHAP).
These regulations outline inspection and abatement requirements for materials containing asbestos.
Lead
Macrotec collected X-Ray Fluorescence (XRF) readings to identify the presence and content level of lead above the action level (1.0 mg/cm2). The sampling for this project was collected in compliance with the U.S. Department of Housing and Urban Development (HUD) and the Environmental Protection Agencies (EPA) regulatory requirements.
SITE DESCRIPTION
The subject site is a one story concrete building that was once used for a electric vault but is now a office and storage building.
Creech Air Force Base – Bldg. 95 Page 3
Macrotec’s inspection was limited to this location only.
COLLECTION METHODOLOGY
Asbestos
An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.
Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.
Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos.
Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.
Asbestos samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc. (TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos.
Lead
Painted surfaces were then tested using an X-Ray Fluorescence (XRF) analyzer.
The XRF was a Niton XLp 300A paint analyzer serial #26948. The instrument was calibrated to the manufactures specifications before the inspection, every four hours, and after the inspection was finished, verified against the National Institute of Standards and Testing (NIST) Standard Reference Material (SRM) 2573 lead. The analyzer was in control at all times of the NIST SRM lead standard.
Interior and exterior XRF readings were taken on determined surfaces on each building component in each room equivalent. The HUD definition of lead based paint is lead equal to or greater than 1.0 mg/cm2. All results above this level are considered positive and all results found below this level are considered negative.
Creech Air Force Base – Bldg. 95 Page 4
SAMPLE ANALYSIS METHODOLOGY
Asbestos
Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.
Lead
To determine lead content, the painted surfaces were tested using an X-Ray Fluorescence (XRF) analyzer. The XRF was used in accordance with chapter seven of the Guidelines of the Evaluation and Control of Lead Based Paint Hazards in Housing published by HUD
SAMPLE ASSESSMENT
Asbestos
Macrotec’s inspection of the subject site found Eight (8) separate suspect asbestos building materials, of which a total of Ten (10) samples were collected and submitted for analysis.
The following table summarizes the materials that were found to be asbestos containing, the locations where the material is located, the material’s friability and its NESHAP classification.
Material Number
Material Description
Material Locations
Material Friability
NESHAP
8 Transite Pipe This material is in the wire holes, protruding from the west wall in the
Front Room Bunker and presumed to be in various other locations below the building.
Non- Friable
Category II
See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.
Category II non-friable asbestos-containing material means any material, excluding Category I, containing more than 1 percent asbestos.
Creech Air Force Base – Bldg. 95 Page 5
Lead
Macrotec collected FiftySix (56) XRF paint readings within the subject site.
Some painted surfaces were found to be leaded (painted materials and/or surfaces above the HUD action level of 1.0 mg/cm2). OSHA regulations require the implementation of worker protection if there is a potential that paint with any amount of lead in it will be disturbed during demolition or renovation activities.
See Appendix B for a listing of materials that contain lead above the HUD action level and above the “Limit of Detection” (LOD). See Appendix D.1 for a listing of all the painted surfaces, XRF readings, and XRF reading locations and results for this project.
RECOMMENDATIONS
Asbestos
US EPA and Nevada Department of Industrial Relations regulations require the removal of all regulated asbestos-containing materials (RACM) prior to any renovation or demolition that could impact or disturb RACM. In accordance with these regulations Macrotec recommends:
Hiring a Certified Asbestos Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring a Nevada licensed Asbestos Abatement Contractor to remove all asbestos materials, which are either regulated or may become regulated during the course of renovation and/or demolition activities.
Hiring a Certified Asbestos Consultant to monitor the removal activities and to provide final clearance inspection reports.
Macrotec recommends the removal of all ACM (in the manner described above) whenever feasible.
Lead
US EPA OSHA regulations require the implementation of worker protection if there is a potential that paint with lead in it will be disturbed during renovation activities. In accordance with these regulations Macrotec recommends:
Creech Air Force Base – Bldg. 95 Page 6
Hiring an EPA Licensed Lead Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring an EPA Licensed Lead Abatement Contractor to stabilize and/or remove all regulated lead painted materials.
Hiring an EPA Licensed Lead Consultant to monitor the removal activities and provide final clearance inspection reports.
INSPECTION LIMITATIONS
The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.
Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.
• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.
• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.
• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.
Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.
Appendix A
Appendix A - Asbestos Assessment
Macrotec Job #13580 - WO #C11120 21243 - Creech Bldg. 95
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Built-up roof This material is located on the roof of the building
No Asbestos Detected
AB1 Exterior - Roof - West Side None Detected
AB2 Exterior - Roof - South Side None Detected
AB3 Exterior - Roof - North Side None Detected
2 Gray Roof Mastic on Perimeter This material is located on the penetration on the roof of the building.
No Asbestos Detected
AB4 Exterior - Roof - West Side None Detected
3 Gray Roof Mastic on Pump/Roof This material is located on the penetration on the roof of the building.
No Asbestos Detected
AB5 Exterior - Roof - Center None Detected
4 Window Puddy This material is located on the exterior north window
No Asbestos Detected
AB6 Exterior - North Window None Detected
5 Window Puddy This material is located on the penetration on the roof of the building.
No Asbestos Detected
AB7 Exterior - North Window None Detected
6 Concrete Walls This material is located on the walls of the building
No Asbestos Detected
AB8 Exterior - South West Corner None Detected
7 Gasket on Pump This material is located on the pump on the roof
No Asbestos Detected
AB9 Exterior - Roof - Center None Detected
Asbestos Survey
Creech Bldg. 95
Macrotec Job #13580
Appendix A Macrotec Job #13580 - WO #C11120 21243 - Creech Bldg.
8 Transite Pipe This material is located in the wire holes, protruding from the west wall in the Front Room Bunker and presumed to be in various other locations below the building.
Non-Friable, Category II
AB10 Interior - Front Room Bunker - South Wall 15% Chrysotile
Asbestos Survey
Creech Bldg. 95
Macrotec Job #13580
Dustin Highlight
Appendix B
Appendix B - Lead Assessment
Macrotec Job #13580 - WO #C11120 21243 - Creech Bldg. 95
The following table lists each of the painted surfaces found to contain lead at the subject site, Materials with a result greater than 1.0 mg/cm2 are considered leaded by the EPA and HUD. Note: OSHA requires PPE for materials containing any amount of lead. For each painted surface, the description, material location and result are listed.
Painted Surface Description
Painted Surface Location
XRF Result (mg/cm2)
This material is located on the exterior walls 0.8Beige Concrete Wall
This material is located on the North West exterior walls
1.1Beige Concrete Hole
This material is located on the exterior window frames on the exterior
8.8 - 10Beige Wood Window Frame
This material is located on the exterior window frames on the exterior
8.8 - 10Beige Wood Window Frame
This material is located on the exterior gutter system
9.4White Metal Gutter
This material is located on the Main door of the building
11.85Brown Metal Door Frame
This material is located on the floor of the storage room
0.29Grey Concrete Floor
This material is located on the interior door frames 7White Metal Door Frame
This material is located on the interior doors 6White Metal Door
This material is located on the exterior car stops 4.2Brown Metal Car Stop
Lead Paint Survey
Creech Bldg. 95
Macrotec Job #13580
Appendix C
Asbestos & Lead Based Paint Demolition Survey Macrotec Project # 13580 Creech Air Force Base, Bldg. 95 Appendix A
Picture 1—Beige concrete wall that is elevated for lead and metal gutter system that is leaded
Picture 3—Door frame containing lead based paint.
All exterior and interior door frames are lead con-taining
Picture 5—Car stops that contain lead based paint that are located around the building
Picture 2—Beige wood window frame that contains lead based paint
Picture 4—White interior door and frame that con-tains lead
Picture 6—Asbestos containing transite pipe are found in these holes in the bunker, protruding from the west wall and presumed to be in numerous loca-tions under the building
Appendix D
Asbestos & Lead Survey
Creech AFB— Bldg. 95
Macrotec Project # 13579
Appendix A
* Diagram Not Drawn To Scale
Sample Location Diagram
AB1
The Red Outlined Areas Above Was Tested for Lead Based Paint with a XRF Analyzer. See Results Page for Materials & Locations.
AB2
AB3
Office
Front Rm
Storage
AB7 AB4
AB6
AB5
AB8
AB9
AB10
Bunker
Bunker
Appendix E
Macrotec Consulting
TRIANGLE ENVIRONMENTAL SERVICE CENTER, INC.
13509 East Boundary Road, Suite B, Midlothian, VA 23112
1*.(0-2(+0/+ ^ LI[3 1*.(0-2(+0/-
BULK ASBESTOS SAMPLE ANALYSIS SUMMARY
9724 Mild Weather Ct.
Las Vegas, NV 89148
13580
Bldg 95
130701M
7/1/2013 7/2/2013 7/2/2013
Y. FangJOB SITE:
TESC LOGIN #:
DATE OF RECEIPT:
DATE OF ANALYSIS:
DATE OF REPORT:
ANALYST:
TESC
SAMPLE #
CLIENT SAMPLE ID
& GROSS DESCRIPTION
ESTIMATED
% ASBESTOS
NON ASBESTOS
% FIBERS
NON FIBROUS
% MATERIALS
CLIENT:
CLIENT JOB/ #:
10% Cellulose 90%AB1 / Black tar-like NAD1
10% Cellulose 90%AB2 / Black tar-like NAD2
10% Cellulose 90%AB3 / Black tar-like NAD3
100%AB4 / Gray adhesive NAD4
100%AB5 / Gray adhesive NAD5
100%AB6 / White powder NAD6
100%AB7 / White powder NAD7
100%AB8 / Gray granular NAD8
100%AB9 / Gray powder NAD9
85%AB10 / Gray cement 15% Chrysotile10
Tuesday, July 02, 2013 Page 1 of 2
JQ\_[Ub QaU Q]Q[hiUT Y] QSS^aTQ]SU fYcX jB]cUaY\ EUcX^T V^a cXU =UcUa\Y]QcY^] ^V 9bRUbc^b Y] ;d[Z B]bd[QcY^] JQ\_[Ubk( >H9 2,,+E0)4.),.,( =US* -54.
and "Method for the Determination of Asbestos in Bulk Building Materials", EPA 600/R-93/116, July 1993. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report shall not be reproduced, except in full written approval of Triangle Environmental Service Center, Inc. This report must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. This test report relates only to the item(s) tested.
NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound][
Reviewed By Authorized Signatory:
Feng Jiang, MS Senior Geologist, Laboratory Director Yuedong Fang, Senior Geologist
Macrotec Consulting
TRIANGLE ENVIRONMENTAL SERVICE CENTER, INC.
13509 East Boundary Road, Suite B, Midlothian, VA 23112
1*.(0-2(+0/+ ^ LI[3 1*.(0-2(+0/-
BULK ASBESTOS SAMPLE ANALYSIS SUMMARY
9724 Mild Weather Ct.
Las Vegas, NV 89148
13580
Bldg 95
130701M
7/1/2013 7/2/2013 7/2/2013
Y. FangJOB SITE:
TESC LOGIN #:
DATE OF RECEIPT:
DATE OF ANALYSIS:
DATE OF REPORT:
ANALYST:
TESC
SAMPLE #
CLIENT SAMPLE ID
& GROSS DESCRIPTION
ESTIMATED
% ASBESTOS
NON ASBESTOS
% FIBERS
NON FIBROUS
% MATERIALS
CLIENT:
CLIENT JOB/ #:
Total Samples/Layers Analyzed: 10
Tuesday, July 02, 2013 Page 2 of 2
JQ\_[Ub QaU Q]Q[hiUT Y] QSS^aTQ]SU fYcX jB]cUaY\ EUcX^T V^a cXU =UcUa\Y]QcY^] ^V 9bRUbc^b Y] ;d[Z B]bd[QcY^] JQ\_[Ubk( >H9 2,,+E0)4.),.,( =US* -54.
and "Method for the Determination of Asbestos in Bulk Building Materials", EPA 600/R-93/116, July 1993. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Glass fiber is analyzed for quality control blank. TESC recommends by point count or Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report shall not be reproduced, except in full written approval of Triangle Environmental Service Center, Inc. This report must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. This test report relates only to the item(s) tested.
NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound][
Reviewed By Authorized Signatory:
Feng Jiang, MS Senior Geologist, Laboratory Director Yuedong Fang, Senior Geologist
Appendix E.1
Time Duration Component Substrate Side Color Site Building Room Results Depth PbC PbC Error PbL PbL Error PbK PbK Error
6/27/13 14:25 1.27 Pump Metal Roof Silver Creech 95 Exterior NEG 1.17 < LOD 0.03 < LOD 0.03 < LOD 3.71
6/27/13 14:25 1.27 Pump Metal Roof Silver Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.82
6/27/13 14:25 1.28 Pump Metal Roof Silver Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.75
6/27/13 14:25 0.32 Pump Metal Roof Silver Creech 95 Exterior Null 1 < LOD 0.05 < LOD 0.05 < LOD 13.54
6/27/13 14:28 1.59 Fascia Metal Roof Beige Creech 95 Exterior NEG 7.69 < LOD 0.66 < LOD 0.66 < LOD 3.45
6/27/13 14:28 3.21 Fascia Concrete Roof Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.65
6/27/13 14:29 5.12 Wall Concrete A Beige Creech 95 Exterior NEG 1.97 < LOD 0.03 < LOD 0.03 < LOD 1.35
6/27/13 14:30 20 Wall Concrete B Beige Creech 95 Exterior NEG 3.13 < LOD 0.03 < LOD 0.03 0.7 0.4
6/27/13 14:31 20 Wall Concrete C Beige Creech 95 Exterior Null 8.46 0.8 0.4 < LOD 0.06 0.8 0.4
6/27/13 14:31 3.18 Wall Concrete D Beige Creech 95 Exterior NEG 3.66 < LOD 0.09 < LOD 0.09 < LOD 1.65
6/27/13 14:32 1.26 Window Wood A Beige Creech 95 Exterior POS 10 10 5.8 < LOD 13.8 10 5.8
6/27/13 14:32 1.27 Window Wood A Beige Creech 95 Exterior NEG 2.48 < LOD 0.13 < LOD 0.13 < LOD 4.35
6/27/13 14:33 1.28 Window Wood A Beige Creech 95 Exterior POS 9.35 8.8 5.3 < LOD 8.7 8.8 5.3
6/27/13 14:33 1.28 Window Metal D Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.27
6/27/13 14:34 1.27 Vent Frame Wood D Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.1
6/27/13 14:34 1.27 Vent Frame Wood C Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.95
6/27/13 14:34 1.27 Vent Metal C Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.55
6/27/13 14:35 1.27 Pipe Metal C Beige Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 4.5
6/27/13 14:35 1.6 Pipe Metal C Beige Creech 95 Exterior NEG 6.9 < LOD 0.25 < LOD 0.25 < LOD 4.01
6/27/13 14:35 1.28 Hole Wood C White Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.85
6/27/13 14:35 1.28 Hole Wood C White Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 2.25
6/27/13 14:36 20 Hole Sill Concrete C White Creech 95 Exterior POS 5.58 1.1 0.4 0.16 0.06 1.1 0.4
6/27/13 14:37 0.95 Gutter Metal C White Creech 95 Exterior POS 10 < LOD 12.45 < LOD 14.85 < LOD 12.45
6/27/13 14:37 1.27 Gutter Metal C White Creech 95 Exterior POS 10 9.4 5.3 < LOD 4.05 9.4 5.3
6/27/13 14:38 1.28 Door Metal C Brown Creech 95 Exterior NEG 3.43 < LOD 0.11 < LOD 0.11 < LOD 4.35
6/27/13 14:38 0.64 Doorframe Metal C Beige Creech 95 Exterior POS 2.36 6.1 3.8 6.1 3.8 < LOD 14.55
6/27/13 14:39 20 Threshold Metal C Brown Creech 95 Exterior POS 6.71 1.4 0.4 < LOD 0.05 1.4 0.4
6/27/13 14:40 0.64 Door Metal C Brown Creech 95 Exterior Null 2.57 < LOD 0.19 < LOD 0.19 < LOD 8.57
6/27/13 14:40 1.27 Door Metal C Brown Creech 95 Exterior NEG 1 < LOD 0.03 < LOD 0.03 < LOD 4.18
6/27/13 14:40 0.96 Doorframe Metal C Brown Creech 95 Exterior POS 2.8 11.85 11.85 < LOD 11.85 < LOD 11.85
6/27/13 14:41 8.29 Wall Metal A White Creech 95 Storage NEG 3.24 < LOD 0.04 < LOD 0.04 < LOD 1.05
6/27/13 14:42 20 Wall Metal A White Creech 95 Storage NEG 1.14 < LOD 0.03 < LOD 0.03 0.7 0.4
6/27/13 14:42 20 Wall Metal A White Creech 95 Storage NEG 1.3 < LOD 0.03 < LOD 0.03 0.7 0.4
6/27/13 14:43 4.13 Wall Metal A White Creech 95 Storage NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.35
6/27/13 14:44 10.23 Floor Concrete Gray Creech 95 Storage NEG 2.77 0.29 0.07 0.29 0.07 1.1 0.6
6/27/13 14:44 1.28 Pipe Concrete A Gray Creech 95 Storage NEG 1 < LOD 0.03 < LOD 0.03 < LOD 4.5
6/27/13 14:44 1.27 Pipe Concrete A Gray Creech 95 Storage NEG 1.31 < LOD 0.03 < LOD 0.03 < LOD 4.05
6/27/13 14:44 1.28 Flume Metal A Gray Creech 95 Storage NEG 1.23 < LOD 0.03 < LOD 0.03 < LOD 4.45
6/27/13 14:45 1.27 Pipe Metal A White Creech 95 Storage NEG 1.57 < LOD 0.07 < LOD 0.07 < LOD 3.85
6/27/13 14:47 5.43 Wall Concrete A White Creech 95 Office NEG 1 < LOD 0.03 < LOD 0.03 < LOD 1.2
6/27/13 14:48 20 Wall Concrete A White Creech 95 Office NEG 2.71 < LOD 0.03 < LOD 0.03 0.7 0.4
6/27/13 14:48 20 Wall Concrete A White Creech 95 Office NEG 2.95 < LOD 0.03 < LOD 0.03 0.8 0.4
6/27/13 14:49 7.98 Wall Concrete A White Creech 95 Office NEG 1.28 < LOD 0.03 < LOD 0.03 < LOD 0.96
6/27/13 14:50 6.7 Floor Concrete Gray Creech 95 Office NEG 1.14 0.03 0.02 0.03 0.02 < LOD 1.2
6/27/13 14:51 3.2 Wall Concrete A White Creech 95 Front NEG 1.5 < LOD 0.03 < LOD 0.03 < LOD 1.65
6/27/13 14:51 7.03 Wall Concrete A White Creech 95 Front NEG 2.01 < LOD 0.03 < LOD 0.03 < LOD 1.05
6/27/13 14:52 8.3 Wall Concrete A White Creech 95 Front NEG 1.75 < LOD 0.03 < LOD 0.03 < LOD 1.05
6/27/13 14:52 3.19 Floor Concrete A Gray Creech 95 Front NEG 1.07 < LOD 0.04 < LOD 0.04 < LOD 1.8
6/27/13 14:52 1.28 Door Metal A Brown Creech 95 Front NEG 1 < LOD 0.03 < LOD 0.03 < LOD 3.93
6/27/13 14:53 0.64 Doorframe Metal A White Creech 95 Front POS 2.63 < LOD 10.05 < LOD 10.05 < LOD 15.75
6/27/13 14:53 0.64 Doorframe Metal C White Creech 95 Front POS 2.05 7 4.1 7 4.1 < LOD 15.75
6/27/13 14:53 0.64 Door Metal C White Creech 95 Front POS 2.19 6 3.6 6 3.6 < LOD 13.65
6/27/13 14:54 1.28 Grate Metal C Gray Creech 95 Front NEG 1 < LOD 0.07 < LOD 0.07 < LOD 3.57
6/27/13 14:54 1.28 Grate Metal C Gray Creech 95 Front NEG 1 < LOD 0.03 < LOD 0.03 < LOD 4.5
6/27/13 15:04 1.28 Car Stop Metal A Brown Creech 95 Exterior POS 4.61 4.2 2.1 4.2 2.1 < LOD 6.15
6/27/13 15:04 1.61 Car Stop Metal A Brown Creech 95 Exterior NEG 5.7 < LOD 0.71 < LOD 0.71 < LOD 4.23
6/27/13 15:15 1.27 Cal Green Exterior NEG 1.07 0.3 0.19 0.3 0.19 < LOD 2.48
6/27/13 15:16 1.27 Cal Green Exterior NEG 1.14 0.3 0.19 0.3 0.19 < LOD 2.7
6/27/13 15:16 1.28 Cal Green Exterior NEG 1.17 < LOD 0.31 < LOD 0.31 < LOD 2.66
Appendix F
A s d z <-q-q9;1 99# q F:
=t) Fl :ri2dF"* iE*<:YE.E d r..,e a ) <:.2 = a<\
;ageE€ $:
E ; = |9 r.! sft;3rEE[ $Si=% E $-
< = --!lE3g 349<
EF
F z
Aa F i\
0.l/i 9A =0r
II
,.,1 p E9?
.=:i
!;co E S>P>z !i: d :E-t' Fd ?
R
-alil{
TQ
Fi F L.l ci {\\E *a ^|.'E,{>E g
:.o =\loo dsIG Eqls .=
Ol!* 2!al\ Azt\ h rr,,<o Ss?
!ao +aa ^^ :r nFs ais!a r! !4!-cs,)xFs:ic5r,i zIk>t tr4 h a9 &1z z (\ Eg= d=<z & =uJr
H
3si;9+EET E Eg22 Agc0z- x<E-L v 6O L^yt a::; I EEi g $=-6 EH f < l o
E z az U t-
-i F
W National Voluntary Laboratory Accreditation Program
SCOPE OF ACCREDITATION TO ISOIEC 17025:2005
Triangle Environmental Service Center, Inc.
13509 East Boundary Road, Suite B
Midlothian,YA 231t2 Mr. Feng Jiang
Phone: 804-739-1751 Fax: 804-739-1753 E-Mail : info@tesclab.com
URL: www.tesclab.com
BULK ASBESTOS FIBER ANALYSIS (PLM) NVLAP LAB CODE 200794-O
Designation / D escription
EPA 600/lvl4-82-020: Interim Method for the Determination of Asbestos in Bulk Insulation
Samples
EPA 600/R-93l116: Method for the Determination of Asbestos in Bulk Building Materials
NVItIP Code l8/A0l l8/403
20 13 -04-0 | through 201 4 -03 -3 | Folthe National Institute of Standards and Technology
NV|-AP-o1 S (REV. 2005-05-1 9)Page 1 of 1
Effective dates z Itf+6'c f= $=-o5o.acn
=seF|.
=oooqt] -outa
SE
-F;cL30ro --cL=oo Orh =or-o clo= 5(Dqt-
=o=oo
GI
o o
-FF
=o9' r+,o o_tr oo -o
CL
II
rr+q,s o l+.
o Ia o =111o I {oN s+ Noo (Jr s 6._{
H#g$ 6
$3$ [ ,i$$r $ Fr tSA € F'
*r$F * € g$ifi;s=3r lii ?i$ F3 g i$FEti ,* F g*sfi 3$ ti E s€$DgI d F liflF*€" F o
FilE
$E*#, $ g qsiqF H3X ; P 9oo tgs s
Es n ilo o a.q) o U)
NJ
I s I
0a
N)
I
IJJ
I u)
TIo o
=RT
3*I|.-EI
I
$ Tq$g* ;F il tF-.
f,a$rc Ei o) a o d- Q\
| 1 13580 - Creech 95.pdf |
| Appendix A.pdf |
| 2 13580 - asb asses 2.pdf |
| Appendix B.pdf |
| 3 13580 - pb asses.pdf |
| Appendix C.pdf |
| Picture Page.pdf |
| Appendix D.pdf |
| 4 13580 - Diagram.pdf |
| Appendix E.pdf |
| 5 13580 - asb lab.pdf |
| Appendix E.1.pdf |
| 6 13580 - XRF.pdf |
| Appendix F.pdf |
| Dustin NV '13-'14.PDF |
| Pb Inspector - Dustin 11-14.pdf |
| Pb Company Cert '11.pdf |
| TESC PLM 13-14.pdf |
File details come from the government source that posted it. Updated .