RFI #1
Is there any sort of Window Glass RF requirement for this construction ?
(I've been looking everywhere, couldn't spot it, it only says film and Forced entry).
Answer:
There is no sort of RF glass window requirements to be installed on the windows. The two windows shown on the drawing at the Battle Staff room are just a double pane glass. The other window shown on the drawing is a one-way, see thru, tinted and bullet proof located at the Central Security Control room.