The magnitude of construction is betw een $500,000 and $1,000,000.
This project has a STATUTORY COST LIMITATION of $750,000.
This project is solicited as a HUBZone set-aside. Offers received from concerns that are not certif ied by the Small Business Administration as a HUBZone shall not be considered for aw ard. The North American Industry Classif ication Code applicable to the project is 236210, and the small business size standard is $33.5 million.
All times used are stated in local time, i.e., Pacif ic Dayight Time (PDT).
PATRICK W. MOCK 702-652-6196
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Jul-2010
(RFP)
(IFB)
X
CALL:
Construct CATM Classroom/Admin Facility
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________335 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________31 Jul 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
99 CONS/LGCA
5865 SWAAB BLVD, BLDG 588
NELLIS AFB NV 89191-7063
FA4861
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:30 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
RKXF 09-8017
8. ADDRESS OFFER TO (If Other Than Item 7)
702-652-2532FAX:TEL: 702-652-9113 TEL: FAX:
FA4861-10-R-A004 59
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4861-10-R-A004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Construct CATM Classroom/Admin Facility
FFP
Contractor shall furnish all design, labor, equipment, material, supplies, manufactured articles, labor, transportation, supervision, and all else necessary to perform all operations in connection with successfully completing the project
RKXF 09-8017, Construct CATM Classroom/Admin Facility at Range 63C of
Southern portion of the Nevada Test and Training Range (NTTR). All work shall be accomplished in strict accordance with the specifications, terms, and conditions specified, referenced, or attached herein.
DESIGN LUMP SUM $_______________________
CONSTRUCTION LUMP SUM $_______________________
FOB: Destination
PROJECT: RKXF 09-8017
SIGNAL CODE: A
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
See Section ―J‖ for attachments
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
CLAUSES INCORPORATED BY FULL TEXT
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
(End of clause)
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
Design: 155 calendar days after receipt of the
Design Notice to Proceed
Construction: 180 calendar days after receipt of the Construction Notice to Proceed
99 CES/CEPM - F3GHFA
DANILO T. OCAMPO
6020 BEALE AVE, BLDG 812
NELLIS AFB NV 89191-7260
702-652-8437
FOB: Destination
F3GHFA
52.211-12 LIQUIDATED DAMAGES -- CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract or task order, the
Contractor shall pay liquidated damages to the Government in the following amounts:
(1) the sum of $287.75 for each day of unexcusable delay past the scheduled completion date until the date of beneficial occupancy (i.e., substantial completion as determined by the Contracting Officer);
(2) an additional sum of $63.79 for the first and last day of unexcusable delay exceeding the scheduled completion date; and
(3) the sum of $71.94 for each day of unexcusable delay exceeding the date of the beneficial occupancy (i.e. substantial completion as determined by the Contracting Officer) or the established completion date, whichever, occurs later, until the project is accepted by the Government, including but not limited to the completion of all punchlist items, final submittals, and cleanup.
(b) If the Government terminates the Contractor‘s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the
Termination clause.
F-100
FEDERAL HOLIDAYS
This base observes the following Federal legal holidays:
New Year's Day 1 January
Martin Luther King's Birthday Third Monday In January
President's Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
NOTE: Holidays falling on a Saturday will be observed on the preceding Friday.
Holidays falling on a Sunday will be observed on the following Monday.
(End of Clause)
F-101
NORMAL HOURS OF WORK
(a) Normal work hours for Contracting personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. In order to ensure availability of personnel, please schedule your meetings and visits at least 24 hours in advance.
(b) Normal work hours for Base Engineering personnel are from 7:00 a.m. to 4:00 p.m., Monday through
Friday, excluding Federal holidays and the day after Thanksgiving. Access to work sites will be restricted to these hours and days, unless otherwise specified in the project documents.
(1) Deviations to this schedule will be considered if it is in the best interest of the government as determined by the Contracting Officer. If the Contractor desires to work hours other than normal work hours, he/she must submit to the Contracting Officer for review, a written request at least three working days prior. The request shall note the activities planned and the planned hours/days of work so that the construction inspectors can plan their work schedule. If inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price shall be deducted from the next payment authorized after overtime rates have been determined.
(2) Work that cannot be fully inspected after its completion will normally not be allowed to be done during other than normal work hours/days, or as otherwise specified in the project documents, without written
Contracting Officer approval.
Section G - Contract Administration Data
G-700
ADMINISTRATION AND PAYMENT
(a) The resulting contract shall be administered by the following Contract Activity:
99 CONTRACTING SQUADRON/LGCA
5865 Swaab Blvd, Bldg 588
Nellis AFB NV 89191-7063
(b) A properly prepared invoice shall be submitted electronically as identified in Clause G-701 below. Invoices may be submitted MONTHLY unless a more frequent submission is authorized by the Contracting Officer. Such requests should be provided in writing by the contractor to substantiate the requested increase in payment frequency.
(c) Each invoice shall identify the Contract Line Item Number (CLIN) or Subcontract Line Item Number
(SLIN) and its corresponding two-digit Account Contract Reference Number (ACRN).
(1) PROGRESS PAYMENTS (NET-14) will be based on the last verified, approved progress report received. If a variance exists between the Contractor's and the Government's estimate, the contractor will be given the opportunity to support their position. If the additional information is not adequate or is not provided within one day, the invoice will be rejected and the Contractor will be provided the opportunity to resubmit at the Government's estimated percentage of work completed. A maximum amount of 90% of the contract price may be paid as progress payments.
(2) FINAL PAYMENT (NET-30) will be for an amount not less than 10% of the contract amount and will be approved for payment after completion (including clean-up and submission of final warranties, as-built drawings, payrolls, and all other documents as required under the terms and conditions of this contract/task order) and final acceptance (including correction of all punchlisted items) of the project work.
(d) With each electronic request for payment, the contractor shall also attach a scanned copy of the following document(s) in Wide Area Workflow-Receipt and Acceptance (WAWF-RA) invoice:
(1) PROGRESS REPORT/DQS: The most recent, signed progress report – or – daily quantity sheet for which work required by the contract has been completed and inspected;
(2) SUBCONTRACTOR PAYMENT LIST: A listing of the amount included for work performed by each subcontractor under the contract, the total amount of each subcontract under the contract,. the amounts previously paid to each such subcontractor under the contract; and
(3) RELEASE OF CLAIMS: For FINAL invoices, a fully executed, signed Release of Claims.
NOTE: The original, signed Release of Claims shall be provided by mail or hand carried to the Contracting Office.
G-701
SUBMIT INVOICES ELECTRONICALLY
(a) To expedite payment, reduce lost documents, and increase visibility into the status of payments, the
Department of Defense (DoD) has implemented electronic invoicing. The goal is to enable authorized Defense contractors and DoD personnel the ability to create invoices and receiving reports and access contract related documents quickly and efficiently. In conformance with Defense Federal Acquisition Regulation Supplement
(DFARS) Clause 252.232-7003, Electronic Submission of Payment Requests, which is incorporated herein by reference, contractors shall submit invoices ELECTRONICALLY through the Defense Finance and Accounting
System (DFAS) Web Invoicing System [Wide Area Workflow – Receipt and Acceptance (WAWF-RA)] at https://wawf.eb.mil/. Select CONSTRUCTION Payment Invoice when creating the invoice.
(b) Applicable codes necessary for submission of invoices against this contract are as shown below.
1) ADMINISTERED BY: FA4861
(2) ISSUED BY: FA4861
(3) CONTRACTING OFFICE: FA4861
(4) PAYMENT OFFICIAL: F67100 (DFAS-Limestone)
(5) INSPECT BY: F3GFHA
(6) LPO: Leave BLANK
(7) DESCRIPTION: Project RKXF 09-8017
Construct CATM Classroom/Admin Facility include cumulative percentage being invoiced
SEND MORE E-MAIL NOTIFICATIONS:
CONTRACT ADMINISTRATOR: patrick.mock@nellis.af.mil
CONTRACTING OFFICER: richard.jedlinski@nellis.af.mil
ADDITIONAL NOTIFICATION: carmen.rhodes.ctr@nellis.af.mil
(c) Paper invoices will be rejected and returned and the contractor advised to invoice electronically.
(d) For assistance regarding specific electronic invoicing issues, please contact the WAWF Customer Service at
866-618-5988. Web-based training is available at the WAWF site (http://www.wawftraining.com/).
https://wawf.eb.mil/ http://www.wawftraining.com/
Section H - Special Contract Requirements
H-100
REQUIRED INSURANCE (IAW FAR 28.306(b))
(a) In conformance with FAR 52.228-5 clause, InsuranceWork on a Government Installation, the
Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
(1) Workmen's Compensation and Employers Liability Insurance as required by law (except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory). The required Workmen's
Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
(2) General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
(3) Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
(b) An ―Insurance Certificate of Compliance‖ form can be obtained upon request from the 99 th
Contracting
Squadron contract administrator assigned to this requirement.
H-101
PAYMENT AND PERFORMANCE BONDS
(a) After contract award (i.e., Notice of Award, Executed Contract or Task Order), the Contractor shall furnish two bonds, a Performance Bond (on Standard Form (SF) 25) and a Payment Bond (on Standard Form (SF) 25A), each with good and sufficient surety or sureties, acceptable to the Government. The penal sums of such bonds will be based on the awarded amount; or (if this is the initial award of an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract) the guaranteed contract minimum or the amount of the first task order, whichever is larger. Each project under an IDIQ contract shall be bonded. When the award price is increased by modification, the penal sum of the bond shall be increased. The payment and performance bond amounts shall be as specified in FAR Clause
52.228-15, Performance and Payment Bonds--Construction. A Notice to Proceed (NTP) with the work awarded will not be issued by the Contracting Officer and no work shall begin until good and sufficient surety has been received and accepted by the Contracting Officer.
(b) All required bonds and bond increases shall be furnished by the Contractor to the Government within the timeframe prescribed on page 1 of this document after finalization of the award or modification document.
(c) Bonds shall be in the form of a firm commitment, supported by corporate sureties whose names appear on the list contained in Department of the Treasury‘s Listing of Approved Sureties (Department Circular 570), individual sureties acceptable to the Contracting Officer, or other acceptable security such as a postal money order, certified check, cashier‘s check, irrevocable letter of credit or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of Treasury, Financial Management Services, Surety Bonds Branch, 401 14th St NW FL
West, Washington DC 20227-1017. The listing may also be accessed electronically at the following address:
http://www.fms.treas.gov/c570/index.html .
H-102
DESIGNATION OF CONTRACTING OFFICER REPRESENTATIVE (COR)
The Base Civil Engineer or his/her authorized representative is designated as the representative of the Contracting
Officer (COR) for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. The COR performs quality assurance for the government and is not authorized or required to perform the quality control for the contractor.
H-103
AVAILABILITY AND USE OF UTILITY SERVICES
(a) In conformance with FAR Clause 52.236-14, Availability and Use of Utility Services, all reasonable amounts of domestic water and electricity will be made available to the Contractor at no cost by the Government from existing system outlets and supplies. With prior coordination and approval, the contractor may be given access to water hydrants to obtain water for construction activities.
(b) The Contractor shall, at his own expense, make all temporary connections and install distributions lines as may be needed. The Contractor shall furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary systems. All temporary lines shall be maintained by the contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in a like manner prior to final acceptance of the construction. The point of connection shall be coordinated with the Government technical representative prior to connection. If additional outlets or utilities are needed they will be provided at the Contractor‘s expense.
http://www.fms.treas.gov/c570/index.html
H-104
ENVIRONMENTAL PROTECTION
(a) SOLID, LIQUID, AND GASEOUS CONTAMINANTS: The Contractor shall be responsible for the proper disposal of all solid, liquid and gaseous contaminants, including asbestos and lead based paint, in accordance with all applicable federal, state, local and Nellis Air Force Base (NAFB) laws, regulations, codes, and management plans, including NAFB Management Plan 12.
(b) DISPOSAL OF REFUSE: The Contractor will be required to remove and properly dispose of all refuse from each respective installation for work performed under each task order.
(c) COVERED CHUTES/RECEPTACLES: All chutes and/or receptacles used for refuse collection shall be covered at all times, or of such design as to fully confine the material to prevent the dissemination of dust.
(d) SOIL EROSION: The Contractor shall provide and install protective barriers to prevent erosion on all required excavations.
(1) Wind: County Dust Permits are required for surface disturbances greater than 1/4 acre, or 100 lineal feet of trenching. Copies of any approved dust permits must be provided to 99 CES/CEVC (Air Program Manager) through the Contracting Officer. If in the opinion of the Contracting Officer, excessive dust is generated by the construction effort, the Contractor shall, at no cost to the Government, stop all activity until adequate dust control measures are implemented. County Dust Permits are required for all projects at Nellis and Creech AFB‘s. The contractor must obtain all required County Dust Permits and submit a copy to 99 CES/CEVC prior to initiating work. The typical time to obtain a dust permit is two weeks.
(2) Water: The Contractor shall comply with all applicable Federal, State, local and Nellis AFB laws, regulations, codes and management plans in preventing the discharge of sediment into any stream, river, or waterway through direct discharge or by storm water runoff.
(e) MATERIAL SAFETY DATA SHEETS (MSDS): At least fourteen (14) calendar days prior to use, the
Contractor shall submit three (3) copies of MSDS for any chemical or hazardous material, as defined In Federal
Acquisition Regulation clause 52.223-3, Hazardous Material Identification and Material Safety Data, to the
Contracting Officer as a submittal item. The contractor shall retain a copy for on site use (see Nellis AFB
Requirements for Hazardous Materials Authorization Procedures for Contractors).
(f) CONTAMINATED SOILS: Work requested of the Contractor may include the removal and/or disposal of contaminated soils. Contaminated soils are defined as soils containing non-hazardous materials such as JP-8 aircraft fuel, heating fuel oil, or other materials, as may be identified by 99 CES/CEV. All contaminated material shall be removed, transported and disposed of in accordance with all applicable laws, regulations and policies, as identified in clause (a) above. The contractor shall also submit a copy of all permits and disposal certificates to the Contracting
Officer as a submittal item for review by 99 CES/CEVP. All costs incurred for the disposal of contaminated soils, as a result of the Contractors negligence, will be the Contractors responsibility.
(g) HAZARDOUS MATERIALS: The Contractor shall immediately notify the Contracting Officer, Quality
Assurance Evaluator (QAE) or Inspector, any material used during execution of the work period, which is suspected of being hazardous, in accordance with federal, state, and local laws and regulations; . All Hazardous Materials must be authorized before being brought on or used on Nellis AFB (See attached hazardous materials authorization and usage procedural documents). All hazardous materials must be properly stored and handled per federal, state and local laws and regulations. Where applicable, the Contractor shall use environmentally safe products.
(h) HAZARDOUS WASTE: The Contractor is responsible for the proper handling and management of all hazardous waste generated from his work performed on Air Force property. The contractor must, store, document and transport hazardous waste in accordance with applicable Federal, State, local and Air Force regulations. Unless otherwise specified, in complying with NAFB Management Plan 12 requirements, the contractor must contact 99
CES/CEV for waste handling instructions and disposal coordination. Only authorized NAFB individuals are allowed to sign a Uniform Hazardous Waste Manifest for Nellis AFB. The contractor will be held fully liable for any contractor activity/ non-activity resulting in a Notice of Violation (NOV) or any other regulatory penalty. All hazardous or non-hazardous wastes generated by the Contractor will be the responsibility of the Contractor. If a
NOV is issued or regulators are investigating a potential violation, the Contractor will assist Nellis in defending the investigation.
(i) ASBESTOS: The Contractor shall provide an asbestos demolition permit ten (10) days prior to the removal of any asbestos from any facility at NAFB or any other location specified in this contract. 99 CES/CEVC must be contacted and coordinate on any asbestos work.
(j) SPILLS: In addition to abating any hazardous substance spill occurring during the course of this contract, the
Contractor shall:
(1) During normal working hours, immediately report all spills > five (5) gallons to the 99 CES/CEV 652-4123.
(2) After 4:30 p.m. or on weekends, immediately contact the Nellis Command Post at 652-2446.
(3) Forward a written, completed spill report to the Contracting Office within 24 hours after the occurrence.
Report Forms can be obtained from 99 CES/CEV.
(4) Abate the spill in accordance with all applicable Federal, State, local and Air Force regulations. All abatement costs incurred by the Contractor shall be the responsibility of the Contractor.
(k) AIR QUALITY: The Contractor shall comply with Clark County Department of Air Quality and
Environmental Management (DAQEM) regulations and obtain an Authority To Construct (ATC) for the installation of any emission units identified in the contract. The ATC shall be obtained prior to commencing work and coordinated through 99 CES/CEVC. The Contractor shall submit the application to 99 CES/CEVC for approval.
When 99 CES/CEVC has approved the contractor‘s application, 99 CES/CEVC shall submit the application for 99
ABW/CC signature . 99 CES/CEV shall then submit the application to the regulatory agency. The Contractor shall be responsible for providing additional information, as requested by the regulatory agency. The Contractor shall also be responsible for all fees associated with the application.
(l) HISTORICAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES: The Contractor shall take precautions to preserve all existing historical, archeological, and cultural resources, as they exist immediately prior to project start. If, during the course of the project, the Contractor observes unusual items that might have historical or archeological value, such observations shall be reported, as soon as possible, to the Contracting Officer, who will contact the 99 CES/CEVN.
(m) FLORA AND FAUNA: The Contractor shall perform all work and take such steps required to minimize interference with or disturbances to flora and fauna. The Contractor shall not alter water flows or otherwise disturb native habitat adjacent to the work area, which in the opinion of the Contracting Officer are critical to flora and fauna.
(n) WATER RESOURCES: The Contractor shall not pollute any stream, river, or waterway through direct discharge or by storm water runoff. The Contractor shall comply with all applicable Federal, State, local and Nellis
AFB laws, regulations, codes and management plans.
(o) RECYCLING: Recycling efforts should take place whenever feasible. The contractor shall contact 99
CES/CEV about any recycling efforts.
HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES FOR CONTRACTORS
Contractors using hazardous material (HAZMAT) on NAFB must comply with the authorizations procedures described below. (Reference AFI 32-7086, 2.5.5)
(a) Contractors must provide to the Nellis AFB Contracting office, as a submittal item, a list of proposed hazardous materials (HAZMAT), including Material Safety Data Sheets (MSDS) that it plans to use on the installation during the performance of the contract. The Contracting officer/administrator will then forward this information to the
Quality Assurance (QA) evaluator or Inspector.
(b) This information will be forwarded to the HAZMART office (Building 811) by the Inspector. HAZMART office will review the information and determine which contractor-identified materials need to be tracked.
(c) For each contractor-identified HAZMAT that does not meet the Air Force definition of a HAZMAT, these requirements do not apply.
(d) For each contractor-identified HAZMAT that does meet the Air Force definition of a HAZMAT, the
HAZMART office will notify the Inspector of the material requiring authorization and tracking. An AF-EMIS worksheet (see below) will be completed and submitted as a submittal item to the Contracting Officer.
(e) The HAZMART office can assist the Contractor in completing the AF-EMIS worksheet if requested.
(f) The HAZMART office will enter the contractor supplied information into the HAZMAT tracking system to generate an AF Form 3952.
(g) The Contractor will be issued tracking labels (barcodes) to assist in tracking and reporting the material used during the performance of the contract. It is encouraged that the labels be affixed to the material. A Form 3952 will also be issued for the Contractors files. Copies of the AF Form 3952 must be kept on-site for the duration of the project. The contractor will be added to the authorized users list (AUL) by the HAZMART office.
(h) Contractor will be required to report to the Inspector on a monthly basis (by the 5th of the month) and at the end of the contract, within 10 working days after the completion of the project, the material used (see Contractor‘s
Monthly Hazmat Usage Report).
(i) QA or Inspector will forward this information to the HAZMART by the 10 th of every month.
(j) HAZMART office will assist the QA, Inspector, and Contractor in any way possible and to answer any questions.
(k) Material brought on the installation, that was not originally identified by the contractor, must be authorized.
MSDS and other related information, provided by the contractor, must be given to the HAZMART office.
(l) Hours of operation for the HAZMART are 0700 to 1600 hours Monday through Friday, Building 811.
HAZMART phone numbers: 652-9856 or 652-4352
(m) Webpage: https://wwwmil.nellis.af.mil/units/99CES/environmental/hazmart&cap.htm https://wwwmil.nellis.af.mil/units/99CES/environmental/hazmart&cap.htm
(n) HAZMAT DEFINITIONS: Any item or class of items covered in the Emergency Planning and Community
Right-to-Know Act (EPCRA) tracking requirements, OSHA HAZCOM Standard, and all Class I, and Class II ODS
(Ozone Depleting Substances). The following items are a few examples of type of products that may be required to be track in AF-EMIS:
(1) Items with the flash-point of 141 degrees or below.
(2) All paints, Lacquer, Enamels, and Thinners (Water-based, non-lead, non-polyurethane Latex paints are exempt from HAZMART tracking MSDS still required).
(3) Adhesive, Sealants, Glues, some types of caulking.
(4) Some Cleaning Supplies: Bleach, some types of glass cleaner, Drain cleaners, some floor waxes & stripers and others.
(5) Pesticides, Insecticides, Herbicides, Fungicides. Usages of these products are to be used only if specifically specified in the contract, otherwise usage of these materials is not permitted on Nellis AFB. Usage must be reported to 99 CES/CEOUE, Building 1037. Phone number: 652-5613.
Compressed Gases.
(6) Any type of material with a PH of 2 and below or 10.5 and above.
CONTRACTOR'S MONTHLY HAZMAT USAGE REPORT
Contractor: AF-EMIS Shop Code:
Contract #: Reporting Date:
The following information is required for tracking of Hazardous materials on Nellis AFB. This form is required to be filled out on a monthly basis and returned to the Government Representative (Inspector) by the 5th of the month. The Government Representative will provide a copy to the Hazmart office.
This information is required to comply with State, Federal and Air Force laws and regulations.
Material Manufacture NSN# Unit of Issue Amount
Name
(can, bottle, tube) Used
Contractor Representative: Print Date
Signature
Government Representative: Print Date
Signature
AF-EMIS AUTHORIZATION REQUEST WORKSHEET
TYPE OF REQUEST: END DATE:
(circle one) LIMITED ONE-TIME RECURRING (required for Limited & One-Time uses)
2. PROCESS CODE
SHOP INFORMATION
SHOP CODE: SUPPLY ACCOUNT(S) (optional):
MATERIAL INFORMATION
NSN/LSN:
DRAW INFORMATION
DRAW AMOUNT: DRAW FREQUENCY: (circle one) Greater than Yearly, Annually, Semi-Annually, Quarterly, Monthly, Weekly, Daily, One-Time Only
(AMOUNT ON HAND)
SOLE SOURCE INFORMATION
DOES THIS PROCESS INVOLVE A SOLE SOURCE REQUIREMENT? (circle one) YES NO
SOLE SOURCE MANUFACTURER NAME OR CAGE: SOLE SOURCE PART NUMBER/TRADE NAME:
JUSTIFICATION/REQUIRING DOCUMENT
IS THERE A TECHNICAL ORDER OR OTHER DOCUMENT JUSTIFYING THE USE OF THE REQUESTED MATERIAL?
(circle one) YES NO
JUSTIFICATION REQUIRING DOC PAGE# PARA REVDATE REV WEAPON SYS REMARKS
PROCESS INFORMATION
IS THIS REQUEST FOR A NEW WORKLOAD OR PROCESS IN THIS SHOP? (circle one) YES NO
IS THIS REQUEST FOR A NEW MATERIAL FOR THE SHOP? (circle one) YES NO
WILL THIS AUTHORIZATION REPLACE ANOTHER AUTHORIZATION (DIFFERENT PROCESS OR MATERIAL)?
(circle one) YES NO
IF YES, ENTER THE CONTROL ID FOR THE AUTHORIZATION BEING REPLACED:
REPLACE REASON: (optional)
AF-EMIS PROCESS CODE:
TASK INFORMATION
TASK DESCRIPTION (fully describe work activity and process in which this material is used):
DURATION OF TASK: FREQUENCY OF TASK:
(i.e. 5 minutes, NO VARIANCES) (i.e. 4 monthly, NO VARIANCES)
AMOUNT OF MATERIAL USED PER TASK: (specify units if other then unit of issue)
(i.e. 2 bottles, 8 oz‘s, NO VARIANCES)
APPLICATION METHOD: (circle only one)applicator, brush, cloth, dipping, hose, not applied, parts washer, Pouring, pressurized bottle, servicing unit, putty knife/spatula, spray, squeeze bottle, squeeze tube, vapor condenser
AF-EMIS AUTHORIZATION REQUEST WORKSHEET, continued
2. PROCESS CODE
PERSONNEL EXPOSURE
NUMBER OF PERSONNEL INVOLVED IN THIS TASK: (optional)
EXPOSURE TIME (in Seconds): (optional)
SHIFT TIME (If other than 8 hrs): (optional)
WOULD SKIN CONTACT OCCUR WITHOUT THE USE OF PPE? (circle one) YES NO
IF YES,WHERE WOULD SKIN CONTACT OCCUR WITHOUT PPE: (circle those that apply)
FACE EYES HANDS TORSO WHOLE BODY
PERSONAL PROTECTIVE EQUIPMENT (PPE)
WILL PERSONAL PROTECTIVE EQUIPMENT BE WORN DURING THIS PROCESS? (circle one) YES NO
RESPIRATOR RESPIRATOR RESPIRATOR RESPIRATOR
PPE TYPE PPE MANUFACTURER MODEL CARTRIDGE TYPE TC #
BODY - FACE - FEET - HANDS
RESPIRATOR - TORSO - HEAD
LOCATION INFORMATION
WILL THE PROCESS BE PERFORMED IN: (check all that apply)
A FACILITY, AIRCRAFT, EQUIPMENT, MANHOLE OR OTHER STRUCTURE, OUTDOORS,
SMALL OR RESTRICTED SPACE, CONFINED SPACE
WILL THE PROCESS BE PERFORMED IN A LOCATION OTHER THE THAN SHOP? (circle one) YES NO
If yes, write a description of the Process Location (building number, etc.)
WHAT IS THE STORAGE LOCATION FOR UNUSED MATERIAL?
INDUSTRIAL EQUIPMENT:
WILL INDUSTRIAL EQUIPMENT BE USED?(circle one) YES NO
EQUIPMENT TYPE EQUIPMENT NO (optional) TRANSFER METHOD
HANDLING INFORMATION
WILL THE MATERIAL BE MIXED WITH ANOTHER SUBSTANCE OR SUBSTANCES? (circle one) YES NO
MIXING METHOD: (circle only one)
Closed container mix, Hand, Impregnated, Open container, stirred, water/foam pump
WILL THE MATERIAL BE HEATED DURING THE PROCESS? (circle one) YES NO
HEATING METHOD:(circle one) MIN WORKING TEMP
Heat Blanket, Oven, Soldering Iron, Torch
MAX WORKING TEMP
TEMP. UNITS ( °F/°C)
ABRASION METHOD: (sanded?) Not abraded, File, Grinder, Sander, Wire Brush
WILL THE MATERIAL BE PRESSURIZED DURING THE PROCESS? (circle one) YES NO
PRESSURIZATION METHOD: MIN WORKING PRESS
MAX WORKING PRESS
PRESS. UNITS
ENGINEERING CONTROLS
ENGINEERING CONTROLS IN USE DURING THE PROCESS: (circle all that apply)
NONE, CANOPY HOOD, COOLING COIL, COVERED TANK, CROSS FLOW PAINT BOOTH, ENCLOSURES, EXHAUST VENTILATION SYSTEM, PAINT BOOTH, SEMI DOWN DRAFT PAINT BOOTH
WASTE GENERATED DURING PROCESS
DESCRIBE THE METHOD OF DISPOSAL FOR THE WASTE THAT IS GENERATED: (circle all that apply)
AIR EMISSION, BULK CONTAINER, CONSUMED IN USE, DRAINED TO INDUSTRIAL WASTE TREATMENT PLANT, DRAINED TO SANITARY SEWER, DRUMMED/CONTAINERIZED, RECYCLED ON SITE, RECYCLED OFF-SITE, REUSED, TRASH/MUNICIPAL WASTE, TURNED-IN TO 90 DAY SITE, TURNED-IN TO LHM
WASTE ACCUMULATION POINT: (optional)
WASTE NSN: (optional)
WASTE PROFILE: (optional)
END ITEM (If other than a weapon system: (optional)
REMARKS (provide any additional information):
REQUESTOR CERTIFIER
REQUESTOR'S NAME: CERTIFIER'S NAME:
I certify that the material will be used as stated above. I certify that the material is required as stated above.
TITLE: TITLE:
OFFICE/ORG SYMBOL: OFFICE/ORG SYMBOL:
TELEPHONE #: TELEPHONE #:
DATE: DATE:
H-105
SAFETY AND ACCIDENT PREVENTION
(a) General: Compliance with the current U.S. Army Corps of Engineers "Safety and Health Requirements
Manual", EM 3835-1-1; Occupational Safety and Health Act (OSHA) Public Law 1910 and 1926; Air Force
Occupational Safety and Health (AFOSH) standards, and current Nellis AFB safety regulations is mandatory. The prime Contractor shall be held responsible to insure that his/her workforce and any subcontractor or supplier workforce comply to the above safety requirements.
(b) Personnel Safety: Adequate protection of all persons shall be provided at all times. Work shall proceed in a manner to prevent hazard.
(c) Safety Briefings: Contractors operating on base will be responsible to brief and ensure their employees, subcontractors, and suppliers comply with all traffic rules and regulations as well as entry procedures.
(d) Nellis AFB Security Police: All instructions given by Security Police personnel will be complied with immediately.
(e) Equipment and Tools: Equipment to be used on the project shall be safe and in good operating condition.
The Contracting Officer reserves the right to inspect any on-base equipment and reject such equipment if he considers it unsafe, in poor operating condition, or inappropriate for work.
(f) Explosive Operated Handtools: The Contractor shall comply with OSHA (Occupational Safety and Health
Act) Standard 1910.215(c) when utilizing explosive operated handtools. Storage of explosive cartridges on the installation will be in metal containers and limited to one day‘s supply. The Contractor will provide adequate controls to prevent loss/theft of cartridges used and stored on the installation.
(g) Electromagnetic Emission Devices: Electromagnetic emission devices (including but not limited to
Radio/Radar Transmitters; Navigational Aids; Instrumentation‘s; Signaling, Intrusion Detecting and Identification
Devices; Mobile and Fixed Business Radio Communication Equipment; and MARS, CBs and Amateur Radio
Stations) will be required to comply with the AFI 33-118, Electromagnetic Sprectum Management, dated 18 Jul
2005.
(h) Use of Radioactive Devices: Under no circumstances will an unlicensed radioactive device be used on
Nellis Air Force Base. Prior to using a radioactive device (i.e., soil or asphalt density meter) on government property, the Contractor shall submit an application to the Contracting Officer for approval by the Base Radiation
Protection Officer (99th Medical Group/SGPB). In accordance with Nellis AFB Instruction 48-101, the application shall be submitted thirty (30) to sixty (60) calendar days prior to the anticipated use and will consist of the following:
(1) A copy of the appropriate NRC license or State Permit to operate/own the radioactive device.
(2) A copy of the operator's qualifications and/or radiation safety training.
(3) Radiation dosimetry results for the operator for the past calendar year.
(4) A statement of the expected start date and the length of the contract per task order.
(5) A statement of expected storage and security requirements or other peculiar needs of the
Contractor.
(6) Copies of the last two leak tests, if appropriate.
H-107
EMERGENCY MEDICAL TREATMENT
The Mike O’Callaghan Federal Hospital (MOFH) will provide emergency medical treatment to employees of the
Contractor for injuries incurred while working at Nellis AFB NV. The Contractor will be required to reimburse the
Government at an established rate for non-beneficiaries in accordance with DoD Regulation 6010.15. After receiving initial emergency treatment, the Contractor will provide the hospital with the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care. Follow-on care after initial emergency treatment will not be provided.
H-108
WEATHER CONDITIONS
(a) Weather Hazards: The Contractor shall satisfy himself as to the hazards likely to arise from weather conditions. Complete weather records and reports may be obtained from any U.S. Weather Bureau office.
Additional performance time will only be considered for time lot as a result of unusual and severe weather.
(b) High Winds: When warnings of winds of gale force or stronger are issued, Contractor shall take every practicable precaution to minimize damage (including overspray) to persons, work, and adjacent property. These precautions may include removing all stored materials, tools, and/or equipment from exposed locations and removing or securing any temporary structures.
(c) Time Extensions: In conformance with Federal Acquisition Regulation Clause (FAR) 52.249-10, Default
(Fixed-Price Construction), only unusually severe weather will be considered by the Contracting Officer in determining if the time for completing the work is excuseable as a result of weather and the performance period should be extended.
H-109
PAYROLLS
(a) The Contractor shall submit weekly payrolls in conformance with FAR Clause 52.222-8, Payrolls and
Basic Records. This information may be submitted on Optional Form WH-347 and may be purchased from the
Superintendent of Documents (Federal Stock Number 029-005-00014-1), U.S. Government Printing Office, Washington DC 20402. When OF WH 347 (or an equivalent form that provides the same data and identical representation) is not used, a DD Form 879, Statement of Compliance, must be submitted with each payroll report.
Payroll information must be certified but may be submitted in any form desired.
(b) The prime contractor shall submit both its and its subcontractor's weekly payrolls within seven (7) calendar days after the regular payment date of the payroll week covered. When no work has been accomplished during the week, by either the prime or a subcontractor who has started work, the contractor shall certify a "Statement of Non-
Performance" for itself and/or its subcontractors.
(c) Subcontractor payrolls shall be provided under transmittal cover letter from the prime contractor to show their review and approval.
(d) The contractor shall request conformance of any class of laborers or mechanics not listed in the attached wage determination but who are to be employed under the contract on Standard Form (SF) 1444, Request for
Authorization of Additional Classification and Rate.
(e) A copy of the applicable Apprenticeship or Training Agreement must accompany the payroll when a worker is listed as an apprentice or trainee. Such agreement must be approved by the appropriate agency and shall identify the allowable ratio of apprentices/trainees to journeymen, the applicable rate of pay allowed, and the employee's level of progress expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination.
(f) The last payroll of the prime and each subcontractor shall be clearly marked "FINAL" when submitted.
(g) FAILURE TO TIMELY SUBMIT COMPLIANT PAYROLLS MAY DELAY PAYMENT FOR
COMPLETED WORK.
H-110
COORDINATION AND SCHEDULING
(a) Work Coordination: In order for the work to progress smoothly and cause minimal difficulties, it will be necessary for the Contractor, construction inspector, project engineer, and Contracting Officer to maintain close and active coordination. At all times, the Contractor shall keep the Government informed of when and what work will be accomplished. All work schedules will be coordinated with the appropriate representatives of the Contracting and
Technical Offices.
(1) All work shall be programmed and accomplished in such a manner that causes minimum inconvenience to the government.
(2) At least two (2) calendar days prior to testing or closing hidden work, the contractor shall identify such work and notify the Contracting Officer and Technical Representative when it will be accomplished.
(b) Progress Schedule: The schedule contemplated by FAR Clause 52.236-15, Schedules for Construction
Contracts, shall be accomplished on and in accordance with the instructions pertaining to AF Form 3064 (AF3064), Contract Progress Schedule, and as specified herein. A "network analysis system" may be used to supplement the proposed progress schedule.
(1) The AF3064 shall be prepared for each project and shall be plotted weekly, from Saturday through
Friday, beginning with the date of receipt of the Notice to Proceed (NTP) through the project completion date. Once approved, schedules will not be changed, except by modification which increases the contract cost and/or extends the completion date of the project, or as may otherwise be directed by the Contracting Officer.
(2) The percentage of each listed work element of the job shall be shown opposite each major work element in Column C of the AF3064 and may be expressed in whole numbers or may be carried out to two (2) decimals.
(3) In order to assist in evaluating the AF3064, as well as the progress of construction, the Contractor shall supplement and provide concurrently with the AF3064, a Schedule of Values worksheet which will identify each sub-element of work by Contract Line Item Number (CLIN) along with its quantity, dollar and percentage values. All work, INCLUDING DESIGN and BONDING, shall be integrated into the schedule. The percentage of
DESIGN and BOND costs shall be identified as the first and second item of the schedule and subsequent Progress
Reports.
(4) High dollar value material items may be submitted for payment prior to installation in conformance with FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, but must be clearly and separately identified in the Schedule of Values (either as a major or sub-element of work) specified in the approved AF3064.
(c) Progress Reports: The report contemplated by FAR 52.236-15, Schedules for Construction Contracts, shall be accomplished on and in accordance with the instructions pertaining tothe AF3065, Contract Progress Report and as specified herein.
(1) Progress Reports shall be submitted weekly on the Monday following completion of the previous rating period.
(2) Whenever the cumulative percentage of the work is 5% or more below the scheduled percentage, the AF3065 shall be accompanied by a letter of explanation for the delay and a plan detailing how the Contractor intends to get back on schedule.
(3) Each AF3065 shall be reviewed by the Contracting Officer‘s Representative (COR) for accuracy.
Payment shall be authorized based on the Contracting Officer‘s determination of percentage of complete.
End of Clause
H-111
MATERIAL SUBMITTALS
(a) In conformance with Federal Acquisition Regulation (FAR) Contract Clause 52.236-5, Material and
Workmanship, the contractor shall provide submittals required by the contract documents and revise and resubmit as necessary in order to comply with the specified requirements.
(b) Within 30 calendar days after award, the contractor shall submit a complete list on an AF Form 66, SCHEDULE OF MATERIAL SUBMITTALS. The form shall be fully completed and identify each item to be submitted, what will be submitted, the contract reference requiring submission (as applicable), and the proposed submission date.
(c) Not later than the proposed submission date, the contractor shall submit four (4) copies of each item specified on the AF Form 66 or as required by the contract documents. Each shall be transmitted on an AF Form
3000, MATERIAL APPROVAL SUBMITTAL, and be complete in sufficient detail to allow a ready determination of compliance with Contract requirements.
(1). The ―Submission Number‖ entered on the AF Form 3000 shall be three digits and consecutively numbered beginning with ―001.‖
(2) When material is resubmitted for any reason, the Contractor shall identify the new submittal the same number as the disapproved submittal with an alpha suffix (e.g., 0001A).
(3) The ―Item No.‖ shall correspond exactly to the ―Line Number‖ specified on the AF Form 66, SCHEDULE OF MATERIAL SUBMITTALS.
(4) Attached submittal data/information will be clearly identified or tabbed in order to properly evaluate the materials or articles. Each attachment will be numbered to correspond with the ―Item Number‖ shown on the face of the AF Form 3000.
(5) Requests for non-conforming or substitute materials and equipment shall be submitted singularly on a separate AF Form 3000, shall show all areas of disparity, and shall be clearly identified on the face of, or attachment to, the form. The Contractor shall set forth in writing the reason for any deviation from the Contract requirements and annotate such deviation on the submittal.
(6) Unless…