1) Q: Will a fire pump be required to facilitate the sprinkler system?
A: No. A fire pump will not be required.
2) Q: Which of the following flammable/combustible liquid classifications will apply to the materials that will be stored in the flammable storage room?
a. Flammable: Class IA - Flash Point less than 73°F; Boiling Point less than 100°F Class IB -
Flash Point less than 73°F; Boiling Point equal to or greater than 100°F Class IC - Flash Point equal to or greater than 73°F, but less than 100°F.
b. Combustible: Class II - Flash Point equal to or greater than 100°F, but less than 140°F
Class IIIA - Flash Point equal to or greater than 140°F, but less than 200°F Class IIIB - Flash
Point equal to or greater than 200°F.
A: Propane tanks, solvents for weapons cleaning, and paint spray cans will be stored in this room.
3) Q: Will munitions, including small arms ammunition, be stored in the proposed flammable storage room?
A: No munitions or small arms ammunition will be stored in this facility.
4) Q: What is the location/source for the main incoming electrical power to the facility?
A: A 167KVA (Primary 7,200 V/ Secondary 240/120 Volt) pad-mounted transformer exists
<100 feet west of the site and shall be upgraded under this project to support existing load and that of this project. See revised SOW for requirements.
5) Q: Will the main incoming electrical power be single-phase, or 3-phase?
A: Single phase power.
6) Q: What is the primary utility voltage at the job-site? Single-phase or 3-phase? Is the primary voltage base-owned or NV Energy owned?
A: See responses to RFIs 4 & 5. The primary voltage is owned by the base and is maintained by Creech AFB personnel.
7) Q: Will the incoming power to the facility need to be metered? If so, who will supply the meter? What type of meter will be required?
A: Yes. The contractor will supply a digital meter that is approved by NV Energy.
8) Q: Will the meter need to be remotely monitored?
A: No, that capability is not required.
9) Q: Will the incoming power be brought to the building underground, or overhead?
A: All power circuits must be underground.
10) Q: When the existing facilities on site are demolished, will the existing single-phase transformer remain in place?
A: The existing single phase transformer will remain in place when the “hooches” are demolished under a separate project because this transformer feeds the two PEBs (Admin
Facility & Training Facility) in the area. However, this transformer will be removed and upgraded under this project (RKXF 09-8017). See revised SOW for requirements.
22 July 2010, 0900-1030
QUESTIONS & ANSWERS
11) Q: What is the size of the existing single-phase transformer? If the transformer remains, would it possible to upgrade it, and use that to power the new facility?
A: The existing single phase transformer is 167 KVA. As stated above, it is a requirement to upgrade this transformer to serve existing facilities and this new facility.
12) Q: What is the location/source for the main incoming communications line to the facility?
A: A manhole <100 feet west of the project location.
13) Q: If the overhead cable at the pole adjacent to the construction site is to be the source, how many pairs is the existing cable?
A: A communications manhole exists <100 feet west of the project location. A 12-strand Single
Mode (SM) fiber optic cable and a 25-pair copper cable shall be installed from the existing manhole to the communications room of the new facility. Provide 40-foot extra loops in the manhole. Two (2) 4-inch conduits shall be provided by the contractor from the manhole to the communications room. A set of MaxCell 3-inch, 3-cell fabric inner ducts shall be provided in one of the 4-inch conduits. The other 4-inch conduit is a spare and does not require inner ducts. The SOW will be revised to include this requirement.
14) Q: How many pairs are to be brought to the facility?
A: See response to RFI #13 above.
15) Q: Is fiber-optic cable required to be brought to the building? If so, where is the source?
A: Yes, see response to RFI #13 above.
16) Q: What is the size of the existing water line that will supply the new project?
A: The size of the existing water line is 6 inches per the attached drawing.
17) Q: Will the water line be able to be shut down for tie in or will a hot tap needed to be done?
A: A wet tap is preferred for the water connection. Otherwise, an outage would have to be scheduled, coordinated, and approved.
18) Q: Will windows be required in the new facility? If the answer is yes what is the specification for the glass?
A: Yes, just in the offices and classrooms. Provide “Blast Film” on the windows.
19) Q: If the power coming into the new Bldg is only single-phase then do you want to change the
HVAC requirement from current RFP to add smaller units to cut down on the initial power consumption?
A: The power coming into the facility is single phase only. We believe the largest single-phase
HVAC unit available is 5 tons. Providing a combination of smaller units to make up the required tonnage is acceptable. However, the total number of units shall be kept to a minimum.
20) Q: Are there any special requirements for the flammable storage area, i.e. additional HVAC, wall material, etc.?
A: As stated in the response to RFI #2, propane tanks, solvents for weapons cleaning, and paint spray cans will be stored in the flammable storage room. There are no other known special requirements.
22 July 2010, 0900-1030
QUESTIONS & ANSWERS
21) Q: Will stamped drawings by a licensed engineer be required? If yes, what disciplines will require stamped drawings (electrical, mechanical, structural, plumbing, civil, roof, etc.)? If engineer stamped drawings are required, is there a requirement regarding in which state the engineer must be licensed?
A: Stamped drawings are required for all disciplines to include fire protection. Need to comply with the requirements of UFC 3-600-1 for all fire protection systems. A license from any of the 50 states is acceptable.
22) Q: Is the construction cost estimate worksheet required as part of the bid package?
A: The Bid Schedule must be completed and submitted as part of the proposal.
23) Q: Where will the 1-phase power to the new building originate–at the existing power pole about 300’ away or the existing transformer about 100’ away?
A: See responses to RFIs 4, 5, & 6 above.
24) Q: If the existing transformer is to remain and serve the building, what is the transformer’s current capacity (KVA)?
25) Q: Please provide a description/drawings of the existing fire protection and potable water systems. Confirm existing diesel fire pump to be use for this project and if so, it's specifications.
A: See responses to RFIs 1 and 16 above.
26) Q: What water pressure is available for the fire protection system?
A: Contractor must perform a flow test after award.
27) Q: Where is the point of connection for the new fire protection system and what size is the existing fire water line? Where is the point of connection for the new potable water and what size is the existing line?
A: See responses to RFIs 1 and 16 above.
28) Q: Please confirm that parking and landscaping are not part of this contract.
A: Providing parking will not be part of this contract. Provide landscaping rock mulch (Rebel
Red 3/8” to 3/4” in diameter), 3 inches deep, around the building’s perimeter up to the 5-foot line. Provide weed block fabric underneath the rock mulch. Concrete stoops shall also be provided at all building entrances/exits.
29) Q: Are they any requirements for anti-terrorism or blast protection provisions?
A: Compliance with UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings is required. Please note that existing buildings are not in full compliance.
30) Q: Where is the point of connection for the data, communications, and fire alarm systems?
A: See response to RFI #13 above for data point-of-connection and response to RFI #33 below for the fire alarm system.
31) Q: Will a building security system be required?
A: No, an IDS (Intrusion Detection System) is not be required.
22 July 2010, 0900-1030
QUESTIONS & ANSWERS
32) Q: Is a telemetry system required? If so, please provide system information for the existing system (brand names, model numbers, etc.).
A: A telemetry system is not required.
33) Q: Will the fire alarm be required to communicate via antenna with the Creech fire department? What is the nature of the Creech Fire Department interface?
A: Yes, the Fire Alarm system must communicate via antenna with the Creech Fire Department.
The fire alarm system must be compatible with the existing D21 Monaco system.
34) Q: LEED Requirements?
A: LEED certification is not required for O&M projects at this time.
35) Q: Confirm classroom multimedia not included (no infrastructure or equipment).
A: There is no requirement to provide multimedia infrastructure or equipment in this project.
36) Q: Confirm data cabling will be Cat 5e.
A: Category 6 cabling is the requirement for all new facilities.
37) Q: Confirm no roof mounted equipment.
A: No roof mounted equipment per Nellis Design Compatibility Standards.
38) Q: Confirm no furnishings, no systems furniture in office area—one open space allowed with power/data above ceiling for future connection to government furnished and installed systems furniture.
A: In addition to the voice/data/power drops in the permanent walls, provide voice/data/power coiled above the ceiling for future systems furniture installation. All office furnishings shall be provided by others.
39) Q: Confirm we are to include a new utility transformer if the existing transformer is demolished prior to the start of this project.
40) Q: Confirm underground electrical service to the building is preferred.
A: Underground electrical service is required.
41) Q: Confirm 20,000 gallon septic holding tank, no leach line allowed.
A: Yes, a 20,000 gallon septic holding tank is required.
42) Q: Electrical Service to be metered—digicon? Must it meet NV Energy metering requirements or is the power primary metered at another location?
A: See response to RFI #7.
43) Q: Confirm that the meter for internal use only, not utility billing.
A: Internal use only.
44) Q: Confirm NTP is expected to be prior to Oct 1.
A: Contract award is expected to be before 01 Oct. However, NTP will not be issued until receipt of all bonds; which will be due to the Contracting Officer no later than 10 days after date of award.
22 July 2010, 0900-1030
QUESTIONS & ANSWERS
45) Q: Confirm that HVAC controls shall be capable of interfacing with the Nellis central system but actual connection will not be required under this contract.
A: That is confirmed.
46) Q: Is it acceptable to use a fiber glass septic holding tank in lieu of pre cast concrete. We want to verify that it is a holding tank and not a septic tank and leech field combo.
A: Yes, a double-walled fiberglass holding tank is acceptable.
47) Q: Will there be water pressure flow data to make sure that the sprinkler system will meet the
UFC and NFPA--- Do we need to include a fire sprinkler pump for the building?
A: See responses to RFIs 1 and 26.
48) Q: Will there be as built plans showing where and how to pick up the power source for the building?
A: As-built drawings are not available for the area. See responses to RFIs 4, 5, & 6 above for power point-of-connection for the facility.
49) Q: Will all equipment be Electrical?
A: Yes, all equipment shall be “Electrical”.
50) Q: Will there be building coordinates or reference points to locate the building corners?
A: Not at this time. The exact building coordinates can be established after award.
51) Q: Is there a geotech report or do we need to produce one?
A: The only report available (copy attached) is for a Geotechnical investigation performed in
November 2008 for a project to construct a vehicle yard about 1/4 mile northwest of the proposed building site.
52) Q: The solicitation has paving mentioned in it. Is there any required?
A: No paving is required.
53) Q: The solicitation has Landscaping mentioned in it. Is there any required?
A: See response to RFI #28.
54) Q: The 7.5 ton unit that is referenced for cooling and heating is only made for 3 phase power and there is only single phase power available?
A: Design for smaller units. See response to RFI #19.
55) Q: Will the septic system need to be permitted by additional agencies such as Clark County etc.?
A: Yes, there are permitting requirements from Clark County for the septic system.
56) Q: Will the water line, that is the source for the building, be for fire and domestic water?
A: Provide separate taps for the domestic and fire protection water lines.
57) Q: Must the Facility be ADA compliant?
A: Yes.
22 July 2010, 0900-1030
QUESTIONS & ANSWERS
58) Q: Complete working phone data basic system terminations or just pull wire and punch jacks?
Do you have IT Tech on site?
A: A complete working phone data system is required. Personnel from the 99th
Communications Squadron at Creech AFB are available to answer questions.
59) Q: Is the Fire alarm tying into the main system or will it be free standing?
A: The Fire Alarm and Mass Notification System installed in the facility must communicate via antenna with the Creech Fire Department system.
60) Q: Is Window Blast Film required on new building?
A: Yes. See response to RFI 18 above.
61) Q: Will a flo-test be provided?
A: No, the contractor must conduct a flow test after award.
62) Q: Is there a GEO Tech report on the existing soils?
A: See response to RFI #51 above.
63) Q: Are as-built drawings available for existing underground utilites that run across new building layout?
A: As-built drawings for existing underground utilities are not available. See response to RFI
#16 for existing water lines only.
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .