FA4861-10-R-A024
ATTACHMENT # 2
Page A2-1 of 6
General Decision Number: NV10004 07/09/2010 NV4
Superseded General Decision Number: NV20080004
State: Nevada
Construction Type: Building
Counties: Clark County in Nevada.
EXCLUDES NEVADA TEST SITE (NTS), NATIONAL TEST AND TRAINING
RANGE (NTTR) AND TONOPAH TEST RANGE (TTR)
Modification
Number
Publication
Date
0 03/12/2010
1 03/19/2010
2 06/04/2010
3 07/09/2010
Page A2-2 of 6
BRNV0013-004 03/01/2009
Rates Fringes
BRICKLAYER.......................$ 34.02 10.20
BRNV0013-005 03/01/2009
Rates Fringes
TILE FINISHER....................$ 24.04 7.50
BRNV0013-006 03/01/2009
Rates Fringes
MARBLE SETTER....................$ 35.35 9.75
TILE SETTER......................$ 32.92 9.75
* CARP1780-002 07/01/2010
Rates Fringes
CARPENTER (Including Cabinet making and installation, Accoustical Ceiling
Installation, Batt
Insulation, Drywall Hanging, Form Work, Hardwood Floor
Layer and Metal Stud
Installation.).................$ 37.76 11.10
Zone Pay:
0 to 40 miles radius from intersection of Maryland Parkway and Charleston Blvd in Las Vegas: Free Zone
40 to 60 miles radius: $2.50 additional per hour
Over 60 miles radius: $4.25 additional per hour
Laughlin Area: $2.00 additional per hour
ELEC0357-001 01/01/2010
Rates Fringes
ELECTRICIAN......................$ 39.99 15.12+3%
SOUND AND COMMUNICATION
TECHNICIAN (Alarm installation & Low Voltage
Wiring)........................$ 39.64 15.12+3%
ZONE PAY:
(A) Free Zone: The area bound by a 25 mile radius from the intersection of Main Street and Fremont Street in Las Vegas.
(B) Add $2.50 per hour: The area bound by a 25-55 mile radius from the intersection of Main and Fremont Street.
(C) Add $3.50 per hour: The area outside of a 55 mile radius from Main Street and Fremont Street.
ENGI0012-008 07/01/2009
Rates Fringes
OPERATOR: Power Equipment
Page A2-3 of 6
(03) Skid Loader/Bobcat.........$ 37.91 16.00
(04) Base Roller (Ride
Along).....................$ 39.40 16.00
(06) Bulldozer, Forklift and Scraper................$ 39.62 16.00
(08) Mechanic, Paver
(Including Asphalt)........$ 39.73 16.00
(10) Grader (Finishing and
Non-Finishing)..............$ 39.85 16.00
Add $1.50 per hour to wage rates:
20 miles to 40 miles from the City Hall of Las Vegas
Add $2.50 per hour to wage rates:
40 Miles to 60 Miles from the City Hall of Las Vegas
Add $3.00 per hour:
Over 60 Miles from the City Hall of Las Vegas
IRON0118-002 07/01/2009
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural)...$ 33.00 23.71
LABO0872-004 07/01/2008
Rates Fringes
LABORER
(1) Form Stripping.............$ 24.31 16.83
(2) Asphalt Dumpman, Asphalt Shoveler, Cone
Setter, Trencher-Hand guided......................$ 24.52 16.83
(3) Concrete Saw, Jackhammer, Mason Tender -
Brick, Mason Tender -
Cement/Concrete, Pipelayer..$ 24.62 16.83
(3A)Concrete Vibrator...........$ 25.12 16.83
(7) Asbestos Removal
(Floor, Wall, Ceiling)......$ 25.71 16.83
(8) Flagger....................$ 22.81 16.83
LABO0872-005 07/01/2008
Rates Fringes
PLASTER TENDER...................$ 25.71 16.83
PAIN0159-007 07/01/2009
Rates Fringes
PAINTER (Including Prep, Brush, Roller, Spray &
Drywall Finishing).............$ 34.63 11.87
PAIN2001-001 01/01/2010
Rates Fringes
GLAZIER..........................$ 40.95 16.27
Page A2-4 of 6
PLAS0797-001 07/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.28 11.25
PLASTERER........................$ 29.49 11.60
PLUM0525-001 06/01/2009
Rates Fringes
PIPEFITTER, Including HVAC
Pipe Installation................$ 38.15 17.56
ZONE PAY:
Zone A (Las Vegas)-No Zone Pay
Zone B (NTS)-Add $2.00/hour
Zone C (TTR)-Add $2.50/hour
SHEE0088-003 01/01/2010
Rates Fringes
SHEETMETAL WORKER (Including
HVAC Duct Installation and
Metal Roof)....................$ 42.81 14.68
SUNV2007-002 08/01/2007
Rates Fringes
LABORER: Common or General......$ 16.49 0.00
LABORER: Landscape..............$ 9.85 0.00
OPERATOR: Backhoe...............$ 16.02 0.00
OPERATOR: Excavator.............$ 17.64 1.45
OPERATOR: Loader................$ 23.62 5.10
OPERATOR: Trencher, Excluding Hand Guided Trencher.$ 27.96 0.00
PLUMBER, Excluding HVAC Pipe.....$ 23.11 0.00
ROOFER, Excluding Metal Roofs....$ 12.73 3.56
SOFT FLOOR LAYER, Including
Vinyl & Carpet.................$ 16.12 1.66
SPRINKLER FITTER (Fire
Sprinklers)....................$ 24.38 0.00
TRUCK DRIVER: Dump Truck........$ 16.57 0.00
TRUCK DRIVER: Water Truck.......$ 17.11 2.16
TEAM0631-003 07/01/2008
Rates Fringes
TRUCK DRIVER (Flatbed)...........$ 26.69 16.64
ZONE PAY:
ZONE 1: All work within 30 road miles of City Hall in Las
Vegas shall be considerered a Free Zone.
ZONE 2: All work 30 to 50 road miles from City Hall in Las
Vegas shall receive $1.50 additional per hour.
ZONE 3: All work 50 to 70 road miles from City Hall in Las
Page A2-5 of 6
Vegas shall receive $2.50 additional per hour.
ZONE 4: ALL work over 70 road miles from City Hall in Las
Vegas shall receive $3.50 additional per hour.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed. With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of
Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and
29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Page A2-6 of 6
The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the
Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION