F3GHFA0162A006 RKMF 08-0029A
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate Addendum #1 into the SOW in order to add a f ire riser to support the f ire sprinkler system in the addition, as w ell as to replace the existing fuse sw itchboard.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4861-10-B-A024
X 9B. DATED (SEE ITEM 11)
20-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2010
CODE
99 CONS/LGCA
5865 SWAAB BLVD, BLDG 588
NELLIS AFB NV 89191-7063
FA4861 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4861-10-B-A024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
ADDENDUM #1
Change
To
STATEMENT OF WORK
ADDENDUM #1
PROJECT RKMF 08-0029A
CONSTRUCT PMEL ADDITION BLDG 425
10 SEPTEMBER 2010
General: All work shall be accomplished as indicated in the following paragraphs, the attached drawings, and in the specifications in this contract. All references are to RKMF 08-0029A Section 01010 dated 17 JUNE 10 in the specifications section of the contract.
Changes to the SOW, dated 17 JUNE 10, to read as follows:
1. Paragraph 1.3.12 of the Statement Of Work is revised in its entirety to read as follows: Provide new fire sprinkler and fire alarm as per NFPA 13 and UFC 3-600-01 for ordinary hazard group II classification. Perform water flow test prior to fire sprinkler design. All piping shall be hydro tested to 200 PSI for two hours. There is no existing fire sprinkler system in the building. Provide wet pipe sprinkler drawings and hydraulic calculations for approval. The sprinkler drawing and hydraulic calculations shall be wet stamped by licensed fire protection engineer. Provide quick response fire sprinkler heads. Provide new 6” diameter fire sprinkler riser for new building addition. Provide 6” x 6” x6” tee and blank flange over it for future expansion. Provide OS&Y valve in riser along with tamper switch. Connect new sprinkler riser to existing water supply line. The water supply line is approximately 90’ away from building addition on Griffiss Ave.
2. Paragraph 1.3.20 of the Statement Of Work is revised in its entirety to read as follows: The existing transformer has sufficient capacity left for building addition. A new transformer is not required. Relocate grounding rod because existing ground rod is in the foot print of new addition.
3. Paragraph 1.3.20.1 Replace existing 600/3P Fused Switch Switchboard on east end of building with a
600A/3P/4W/208Y/120VAC floor standing, bottom fed switchboard. The new switchboard to be provided with breakers; bolted fused switches are unacceptable. Switchboard to be provided with sufficient breakers for the existing loads, plus the new loads created in this contract plus 20% spare.
4. The following requirements are added to the SOW:
1.3.20.2 New switchboard to have copper busswork including a copper ground bus.
1.3.20.3 Breakers to have thermal-magnetic trips. No solid state trips.
1.3.20.4 New Switchboard to have a main circuit breaker. Main lugs will not be acceptable.
1.3.20.5 Connect ground bus in switchboard into existing ground grid.
FA4861-10-B-A024
1.3.20.6 Contractor to arrange the positioning of new switchboard to accommodate all loads and the service entrance from the transformer.
1.3.20.7 New HVAC equipment to be fed off of new service switchboard not off of one of the feeder panels.
5. The proposed performance shall remain unchanged.
(End of Summary of Changes)