Attach 3 - PWS Well 8 -30May2025.pdf

PDF 202 KB Posted

Attached to
Well 8 Repair Federal contract opportunity
Solicitation number
FA485525Q0032
Issued by
Department of the Air Force Special Operations Command

About this file

This Performance Work Statement (PWS) details the repair requirements for Water Well #8 at Cannon Air Force Base (CAFB) in New Mexico. The contractor must remove the existing fence, extract the inoperable submersible pump, and install a new 40 Horsepower Peerless Submersible pump at a predetermined depth within the 400-foot well casing. Key requirements include conducting a well test, disinfecting the well with chlorine, obtaining bacteriological testing by the 27th Special Operations Medical Group, and painting the well head with a specified base color scheme. The contractor must also create and submit comprehensive documentation of well development to the New Mexico Office of the State Engineer, including pump data, casing depths, water levels, and well yield, within 14 calendar days of completing the work.

The PWS outlines extensive requirements for contractor personnel, including base access procedures, vehicle regulations, work hours, environmental management, safety protocols, and hazardous materials handling. Contractors must complete Environmental Management System (EMS) Awareness training, comply with green procurement guidelines, and adhere to strict safety and reporting standards. Deliverables include well repair reports, EMS training certificates, and hazardous material authorization documentation, all to be submitted electronically to the Contracting Officer. The work is to be performed during standard business hours (0700-1600), Monday through Friday, excluding federal holidays, with potential for approved overtime if necessary.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

WATER WELL #8 REPAIR

Cannon Air Force Base, New Mexico

Date: April 2025

APPROVED BY:

SrA Micaiah Lampkin_________________________________

Contracting Officer

Contract: Pending Repair Well 8 Attachment 1

1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, personnel, equipment, tools, materials, vehicles, supervision, qualifications and other items and services necessary to restore Well #8 to full and safe operations at Cannon Air Force Base (CAFB), New Mexico. The contractor shall perform the requirements of this PWS in compliance with all federal, state, and local laws and industry standards.

1.1 Well #8. The contractor shall remove fence and barbed on front of well enclosure, remove old inoperable submersible pump, bail the well column and install a new 40 Horsepower (HP) submersible well pump and attach it to existing high density polyethylene (HDPE) piping to predetermined optimal depth. The well casing for well #8 is approximately 400 feet in depth. Once the new well pump is installed, the contractor shall conduct a well test in accordance with (IAW) industry well testing and developmental standards. Existing well specifications: Pump Model - Peerless Submersible 4 Stage 8lb 40 horsepower (HP) 4" Franklin Motor, 3 phase, 480 volts, continuous duty rating – Gallons per Minute (GPM):

300; Well Depth: 400 Feet; Diameter: 4" X 387'; Column Pipe: 16" X 360’; Head: 380 Feet.

1.2. Disinfection. The contractor shall disinfect the well with Chlorine IAW industry standards.

After 24 hours, 27th Special Operations Medical Group Bioenvironmental Engineering (BEE) flight will conduct bacteriological tests before the well is considered serviceable. The results of this test will be provided to the (COR). The (COR) will provide test results to the contractor, to include when the well is considered serviceable.

1.2.1 The contractor shall ensure that the well head has a proper sanitary seal to include base color scheme painting (Sherwin Williams SW6061, Tanbark) when all testing has been completed prior to the final bacteriological test conducted by the base’s Bioenvironmental Flight.

1.3. Documentation. The contractor shall be responsible for creating and maintaining all pertinent well development reports that are specifically required by The New Mexico Office of the State Engineer. This is to include but not limited to all well pump data, casing depths, pump setting depth, water levels static and residual and GPM well yield. Well specific Documentation (pump set depth, GPM) and records shall be turned over to the CO and COR upon completion of all work no later than 14 calendar days or when requested by the CO or COR.

1.4. Utilities. The Government will allow the use of electricity and potable water (as necessary) for accomplishment of service IAW this PWS.

2. GENERAL INFORMATION.

2.1. Personnel. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Employees must be clearly able to read, write, speak, and understand English.

2.2. CAFB Access. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees. The Pass and Identification Section of 27th Special Operations Security Forces Squadron (27 SOSFS) will provide base entry authorizations/passes to each authorized contractor employee. In addition, contractor personnel wishing to operate a privately-owned vehicle on CAFB must comply with all applicable state and base requirements. Entry authorizations must be renewed as required by the 27 SOSFS Pass and Identification Section. All contractor base pass requests must be sent to the point of contact on the contract from 27th Special Operations Contracting Squadron (27 SOCONS) within 3 business days of the time needed for the pass.

2.3. Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes, from employees who depart for any reason before the contract expires (e.g., terminated for cause, retirement, etc.).

2.4. Vehicles. The contractor shall provide and maintain all vehicles necessary to perform the requirements of this contract. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicles. Vehicles shall be clean and always have a neat, professional appearance. All vehicles shall be in operable condition. Vehicle repairs, other than emergency repairs, shall not be accomplished on CAFB. Equipment failure shall not alleviate the contractor from performing any requirement contained in this contract.

2.4.1. Only qualified operators shall be permitted to operate the vehicles or equipment required by this PWS. Vehicle/equipment operators shall possess a valid driver’s license.

2.4.2. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned vehicles or privately-owned vehicle while on CAFB.

2.4.3. Traffic Laws. Contractor employees shall comply with all base traffic regulations. The contractor is not permitted to use cell phones on CAFB while operating a moving vehicle, unless the device is hands-free.

2.5. Work Hours. The work hours and workdays for the period of performance are 0700 - 1600, Monday through Friday, with the exception of U.S. Federal holidays (listed below).

Additionally, if the contractor needs to work outside of the normal work hours, a request must be submitted to the CO for approval.

New Year’s Day Labor Day Martin Luther King Day Columbus Day Washington’s Birthday Veterans Day Memorial Day Thanksgiving Day Independence Day Christmas Day

2.6. Security Forces and Fire Protection Services. On CAFB: Contact the appropriate agency in case of emergency by dialing 911 from a base telephone. If dialing 911 from a cell phone, the call may be automatically routed to an off-base agency, such as the city of Clovis, NM. Be clear about whom you are communicating with and what your situation requires.

2.7. Environmental Management System (EMS). All contractor personnel shall complete EMS Awareness training prior to commencement of any activities. Training is available through the learning management system called The Environmental Awareness Course Hub (TEACH) at https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f. The contractor shall submit the Awareness Training Certificates of Completion to the COR prior to any on-base performance under this contract. Use of Microsoft Edge, Google Chrome or Mozilla Firefox may be required to print certificates.

2.8. Green Procurement Program (GPP). In performance of this contract, the contractor shall use Environmental Protection Agency (EPA) designated recycled content products, Information Technology (IT) Energy Star products/appliances, Federal Energy Management Program (FEMP) Designated Energy Efficient Low Stand By Power products/appliances, U.S.

Department of Agriculture (USDA) Bio based/Bio preferred products, Environmentally preferable products, Electronic Product Environmental Assessment Tool (EPEAT) registered products, Water Sense or other water efficient products, non- or Low Ozone depleting substances under the Significant New Alternatives Policy (SNAP), non or Low toxic or hazardous constituents (e.g. non-VOC paint) and any other environmentally sustainable product/method, to the greatest extent possible.

2.9. Hazardous Materials Handling. The contractor shall comply with all Federal, State and Local regulations (including Cannon Air Force Base & Melrose Air Force Range Civilian Contractor Environmental Guide) concerning the use, storage, and reporting of Hazardous Materials (HM). In accordance with AFI 32-7086, Hazardous Materials Management, the contractor shall provide the following information to the CO for all HM to be used:

(1) Product identification or label

(2) Safety Data Sheet (SDS)

(3) Estimate of quantity to be used

(4) Maximum quantity to be stored

(5) Storage location

2.9.1. The above information must be submitted to the CO on a Cannon AFB Contractor Hazmat Worksheet and Cannon AFB Contractor HM Usage Worksheet. The contractor may not bring a HM onto Cannon AFB, nor use a HM, until the contractor receives all required authorizations.

For definition of HM, the contractor shall refer to FED-STD-313D. HM includes pesticides and cleaning supplies. The contractor shall not use EPA-prohibited chemicals and shall be https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f encouraged to not use products which result in the generation of hazardous waste, air or water pollution. Class I Ozone Depleting Substances shall not be used for any requirement of this contract. The contractor shall maintain a copy of current SDSs readily available to employees for HM in use or being stored. The contractor shall be OSHA compliant.

2.9.2. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws/regulations come into effect. The contractor shall notify the CO at earliest knowledge of the law/regulation change.

2.10. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302, Designation, Reportable Quantities, and Notification into the environment, the contractor or its agent shall immediately report the incident to Cannon AFB Fire Dept. at 911. The liability for the spill or release of such substances rests solely with the Contractor and its agent.

2.11. Safety Requirements. In performing work under this contract, the contractor shall conform to the safety requirements as required by OSHA. The contractor shall provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the contractor. The contractor shall record and report promptly (within one hour) to the CO or COR, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.

2.12. Contractor Manpower Reporting Requirements. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the help desk at:

http://www.ecmra.mil.

3. APPENDICES.

A. CAFB Environmental guide B. Deliverables http://www.ecmra.mil/ http://www.ecmra.mil/

APPENDIX A - PUBLICATIONS/INSTRUCTIONS/REGULATIONS

TITLE PWS Paragraph Cannon Air Force Base & Melrose Air Force Range Civilian Contractor Environmental Guide 2.9.

AFI 32-7086, Hazardous Materials Management 2.9 40 CFR 302, Designation, Reportable Quantities, and Notification 2.10.

APPENDIX B - DELIVERABLES

All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The Contractor shall be responsible for delivering all end items specified.

The following table lists deliverables.

Title PWS Paragraph Date Required Distribution Format

Reports 1.3 14 calendar days after restoring well 8 to full and safe operation CO Electronic

EMS Awareness Training Certificate

2.7. Prior to any on-base

performance under this contract CO Electronic

Hazardous Material Authorization

2.9 and 2.9.1

30 calendar days prior to anticipated on-base use, thereafter, actual usage monthly by the 5th business day

CO Electronic

PERFORMANCE WORK STATEMENT (PWS)
FOR

File details come from the government source that posted it. Updated .