Combo - Electrical Load Update.pdf
PDF 317 KB Posted
- Attached to
- Electrical Load Update Federal contract opportunity
- Solicitation number
- FA485524Q0029
About this file
This document is a Combined Synopsis/Solicitation for a Request for Quotation (RFQ) issued by the Department of the Air Force Special Operations Command. The RFQ seeks the delivery and installation of two 400 Hz Frequency Converters that meet the specified requirements and salient characteristics. The RFQ is set aside for 100% small business, with a NAICS code of 335999 and a small business size standard of 600 employees. Key details include a solicitation issue date of July 26, 2024, a questions due date of August 7, 2024, and a response deadline of August 12, 2024. The frequency converters must meet input voltage, output power, and environmental requirements outlined in the attachments, which include the Statement of Work, floor plans, and provisions and clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 - Updated Questions and Answers BLDG 679.pdf | ||
| Attachment 4 - BLDG 679 Floor Plan.pdf | ||
| Attachment 5 - Provisions and Clauses.pdf | ||
| Attachment 2 - SOW 593 and 679.pdf | ||
| Attachment 6 - Questions and Answers BLDG 679.pdf | ||
| Attachment 1 - Salient Characteristics.pdf | ||
| Attachment 3 - BLDG 593 Floor Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
27TH SPECIAL OPERATIONS CONTRACTING SQUADRON (SOCONS)
Combined Synopsis/Solicitation
Requirement Title: Electrical Load Update
Solicitation Number: FA485524Q0029
Solicitation Issue Date: 26 July 2024 at 12:00 P.M. Mountain Daylight Time
Questions Due Date: 7 August 2024 at 12:00 P.M. Mountain Daylight Time
Response Deadline: 12 August 2024 at 12:00 P.M. Mountain Daylight Time
Point(s) of Contact: SrA Lowe – bryce.lowe@us.af.mil , 575-784-4409 SrA Halnon – evan.halnon@us.af.mil , 575-681-6549
1. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
2. This solicitation is being issued as a Request for Quotation (RFQ). The Request for Quotation (RFQ) number FA485524Q0029 shall be used to reference any written quote provided under this RFQ.
3. This solicitation document and incorporated provisions and clauses are those in effect through:
Federal Acquisition Circular 05/22/2024 Defense Federal Acquisition Regulation Supplement 05/30/2024 Dept of the Air Force Federal Acquisition Regulation Supplement 06/12/2024
4. This requirement is being set-aside for: 100% Small Business Set-Aside.
The North American Industry Size Classification System (NAICS) code associated with this requirement is 335999 which has a small business size standard of 600 employees.
Description:
27 SOMXS is requesting (2 each) 28 VDC 400hz solid state frequency converters to be delivered and installed at two separate locations.
Frequency converters will have the following specifications listed below:
Input Voltage: 50/60Hz, 480VAC, 3-Phase, 3 wire, grounded (4 wire)
Input Frequency: 50/60 Hz
Output power: 120/208VAC, 3-Phase, 50kW, 4 wire
Output Frequency: 400Hz
General Information
Requirement Information mailto:bryce.lowe@us.af.mil mailto:evan.halnon@us.af.mil
Ambient Operating Temperature:
Maximum: -20 to +110F
Humidity: 0 to 60% minimum
Dimensions: <85”L x <80”W x <80”H
Altitude: 0 – 4500 ft
Outdoor Housing Capability
Interface: Physical operator controls and display
Instrumentation:
- Elapsed Time
- Voltage Digital Meter
- Current Digital Meter
- Frequency Digital Meter
- Panel Illumination
- Incoming Power Monitor and indication
- Input breaker Closed indication
- Summary Fault indication
- Over temperature
- Transformer Over temperature
- Input/output fault Indication
External Controls:
- On/Off Pushbuttons
- Alarm Silence
- Alarm Reset
- Emergency off
- Input Circuit Breaker
- Output Contactor
- Output Voltage Adjust
- Output Power On/Off
- Bypass
- Emergency Stop
Protective Circuits:
- Overload Protection
- E&F Interlock
- Over / under voltage
- Short Circuit
- Audible Alarm
- Surge Protection
Contractors shall include the cost of installation in the unit price for each frequency converters.
Place of Delivery/Performance/Acceptance/FOB Point:
Cannon AFB, NM 88103 (Exact address will be provided in the purchase order.)
FOB Destination
PRICE SCHEDULE
The period of performance will be 30 days after date of award.
Line Item
Description Quantity Unit Unit Price
Extended Price
0001 28 VDC 400hz Converters 2 EA $ $
TOTAL
*FAR Provision 52.212-1, Instructions to Offerors – Commercial Items (Jan 2017) applies to this acquisition and the following addendum applies:
The following words stating “offer”, “offeror”, and “proposal” are replaced with “quotation”, “vendor”, and “quote”.
Instructions to Offerors
Paragraph (a) first sentence revised as follows: “The NAICS code and small business size standard for this acquisition appear above.”
Paragraph (b) first sentence revised as follows: “Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.”
Paragraph (c) first sentence revised as follows: “The vendor agrees to hold the prices in its quote firm for 60 calendar days from the date specified for receipt of quotes, unless another time period is specified in an addendum to the quote.”
RFQ due date: 12 August 2024 RFQ due time: 12:00 P.M. Mountain Daylight Time Email to SrA Lowe – bryce.lowe@us.af.mil , and SrA Evan Halnon – evan.halnon@us.af.mil
THIS MUST BE SENT TO bryce.lowe@us.af.mil and evan.halnon@us.af.mil AS STATED. ANYTHING
OTHERWISE CAN AND WILL BE CONSIDERED NONRESPONSIVE. YOU MAY WISH TO PLACE A
READ/DELIVERY RECEIPT.
Note: .zip files are not an acceptable format for the Air Force Network and will not go through our email system.
All questions regarding this RFQ must be emailed to SrA Lowe by 7 August 2024 at 12:00 P.M Mountain Daylight Time.
Please provide the following information with your quote:
Company Name: ____________ UEI Number: _______________ Cage Code: _______________ *Number of Employees_____________ *Total Yearly Revenue_______________ *Information required determining size of business for the NAICS referenced above
Estimated Delivery Time: ____________ Payment Terms: _________________________ Warranty: ________________ FOB: Destination Shipping Cost included? Yes
All companies must be registered in the System for Award Management at https://www.sam.gov/portal/public/SAM/ to be considered for award. The Government will not provide contract financing for this acquisition. Invoice instruction shall be provided at time of award.
mailto:bryce.lowe@us.af.mil mailto:evan.halnon@us.af.mil mailto:bryce.lowe@us.af.mil mailto:evan.halnon@us.af.mil
FAR Provision *52.212-2, Evaluation -- Commercial Items (Oct 14), applies to this acquisition and the following evaluation is applicable:
(a) The Government will award a contract resulting from this RFQ to the responsible vendor whose quote conforming to the RFQ will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:
1. Technical: Quote must be rated as technically acceptable to be eligible for award. To be deemed technically acceptable, the following evaluation criteria must be met:
a. Technical Acceptability: In order to be technically acceptable, the proposed frequency converters must fit the model and specs in the attachments below.
2. Past Performance: Award will not be made to any offeror that has relevant negative past performance.
3. Price: Award will be made to the lowest priced vendor meeting all other evaluation criteria.
(b) A vendor must be determined to be responsible by the Contracting Officer in order to be eligible for award. Responsibility is described in Federal Acquisition Regulation (FAR) Subpart 9.1, “Responsible Prospective Contractors.” Part of the determination addresses financial capability. Please provide the names, addresses and points of contact for all financial institution organizations utilized to determine if contractor has adequate financial resources to perform the contract or the ability to obtain them to include written authority to contact the provided financial institution.
(c) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful vendor within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote’s specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision
Attachment 1 - Salient Characteristics
Attachment 2 - SOW BLDG 593 & 679
Attachment 3 - Floor Plan BLDG 593
Attachment 4 - Floor Plan BLDG 679
Attachment 5 - Provisions and Clauses
Attachment 6 - Questions and Answers BLDG 679
Evaluation Criteria http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1130_159445
File details come from the government source that posted it. Updated .