Attachment 2 - SOW 593 and 679.pdf

PDF 126 KB Posted

Attached to
Electrical Load Update Federal contract opportunity
Solicitation number
FA485524Q0029
Issued by
Department of the Air Force Special Operations Command

About this file

This document is a Statement of Work (SOW) for the installation of a 400 Hz Frequency Converter at Buildings 593 and 679 of the 27th Special Operations Maintenance Squadron at Cannon AFB, New Mexico. The SOW specifies the requirements for the contractor to provide all necessary components, tools, and equipment to complete the installation within 30 days of contract award during normal business hours, with exceptions for weekends, holidays, and AFSOC down days. The contractor is responsible for validating site conditions and may submit a price increase if additional work is required. The contractor must adhere to all safety requirements and is liable for any damage caused during installation. Unsatisfactory performance will result in the work being redone at the contractor's expense. No photography is allowed in the buildings. The SOW is attached to a Request for Quotation (RFQ) for the Electrical Load Update at the two buildings, issued by the 27th Special Operations Contracting Squadron of the Department of the Air Force Special Operations Command.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Load Update, newest first.
File Type Posted
Attachment 6 - Updated Questions and Answers BLDG 679.pdf PDF
Attachment 4 - BLDG 679 Floor Plan.pdf PDF
Attachment 5 - Provisions and Clauses.pdf PDF
Attachment 6 - Questions and Answers BLDG 679.pdf PDF
Combo - Electrical Load Update.pdf PDF
Attachment 1 - Salient Characteristics.pdf PDF
Attachment 3 - BLDG 593 Floor Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Electrical Load Update, Bldg 593 and 679

27th Special Operations Maintenance Squadron, Cannon AFB, NM 27 June 2024

1. GENERAL INFORMATION: The contractor shall provide all required components, tools, and equipment necessary to install the 400 Hz Frequency Converter in accordance with this Statement of Work (SOW).

1.1 DELIVERY DATE: Delivery and installation of the 400 Hz Frequency

Converter shall be completed no more than 30 days after award of contract.

1.2 HOURS OF OPERATION: Contractor personnel shall perform the installation during normal business hours (7:30A.M - 4:30P.M) until completion. Exceptions to those hours will be weekends, holidays (which include New Year's Day, Birthday of Martin Luther King, Jr. Washington's Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Verterans Day, Thanksgiving Day, and Christmas Day), and AFSOC indicated down days. Schedule coordination will be conducted at contract award.

2. POC INFORMATION: Name and point of contact information will be provided upon award of the contract.

3. SCOPE OF WORK: This specification establishes the minimum requirements for installation of Electrical Load Update at building 593 – 27 SOMXS, In Mechanical room and building 679 - 27 SOMXS, at the HVAC PAD

3.1 The space where the frequency converter will be installed is specific. For installation purposes, a building layout is provided in attachment 1.

3.2 Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions. It is understood that the actual site parameters may require electrical work that is not specifically spelled out in this Statement of Work and may cause an increase in the price submitted during the bid process which must be documented in writing and submitted to the Contracting Officer for review.

4. REQUIREMENTS: The required work shall be performed in accordance with this

Statement of Work and all applicable Federal, State and Local laws and regulations:

DAMAGE/SAFETY: The Contractor shall conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work as required by OSHA. The Contractor shall provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the Contractor. Any damage caused by the Contractor during installation is the responsibility of the Contractor and must be reported to the Contracting Officer or designated Contracting Officer Representative promptly (within two (2) hours) along with all available facts relating to each instance of damage to government property or injury to either Contractor or Government personnel.

5.3 UNSATISFACTORY PERFORMANCE: Unsatisfactory performance shall result in work being re-accomplished at the Contractor’s expense with no additional cost to the Government.

5.4 PHOTOS: No worker will take photos at any time while in building 593 and 679.

5.5 STORAGE: The Contractor shall store and safeguard materials until the contractor has prepared the worksite for installation. No storage is available on Cannon AFB unless authorized by the CO.