Amendment_01_0006.pdf

PDF 57 KB Posted

Attached to
Replace Electrical Distribution Phase 2 Federal contract opportunity
Solicitation number
FA4855-16-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Amendment 0001- FA4855-16-R-0006 The purpose of the amendment is to add attachment 9 CAFB MAFB Civilian Contractor Environment Guide

View the file

Other files for this federal contract opportunity

Other files attached to Replace Electrical Distribution Phase 2, newest first.
File Type Posted
Phase_2_Evaluation_Notification.pdf PDF
SOO.pdf PDF
Amendment_4-_0006.pdf PDF
SOO_-_CZQZ13-1136_Bury_OHUG_near_golf_clubhouse.pdf PDF
Amendment_0003.pdf PDF
QA_Phase_1.2.pdf PDF
Attachment_10_Performance_Reference_Form.doc DOC document
Signed_Mod.pdf PDF
9._CAFB_ _MAFB_Civilian_Contractor_Env_Guide.pdf PDF
5._CAFB_Labeling_Standards__2009_Rev1.pdf PDF
1._SOO.pdf PDF
6._CAFB_Electrical_Standards_-_2014.pdf PDF
3._Design_Drawing.pdf PDF
2._SOMS-CZQZ13-1136_phase_2.pdf PDF
FA4855-16-R-0006_R.pdf PDF
4._CAFB_Architectural_Compatibility_Guide-2012.pdf PDF
8._WD_Phase_1_and_2.pdf PDF
7._CAFB_Sustainable_Landscape_Development_Plan_-_2012.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

(1) Add attachment 9, CAFB and MAFR Civilian Contractor Environmental Guide

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Feb-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4855-16-R-0006

X 9B. DATED (SEE ITEM 11)

02-Feb-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Feb-2016

CODE

27 SOCONS/LGCA

110 E ALISON AVE, BLDG 600

CANNON AFB NM 88103-5321

FA4855 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4855-16-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

LIST OF ATTACHMENTS

Attachment Number

Title Pages Date

1 Statement of Objective 10 20 Jan

2 Schedule of Materials Submittals 1 20 Jan

3 Design Drawing 1 20 Jan

4 CAFB Architectual Compatibility Guide

49 2 Feb 2012

5 CAFB Labeling Standards 3 15 May 15

6 CAFB Electrical Standards 15 30 Apr

7 CAFB Sustainable Landscape Development Plan

39 3 Feb 2012

8 Wage Determination NM 160007 6 8 Jan 2016

9 Cannon Air Force Base and Melrose Air Force Range Civilian Contractor Environmental Guide

46 July 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .