3._Design_Drawing.pdf
PDF 3 MB Posted
- Attached to
- Replace Electrical Distribution Phase 2 Federal contract opportunity
- Solicitation number
- FA4855-16-R-0006
About this file
Attachment 3- Design Drawing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Phase_2_Evaluation_Notification.pdf | ||
| SOO.pdf | ||
| Amendment_4-_0006.pdf | ||
| SOO_-_CZQZ13-1136_Bury_OHUG_near_golf_clubhouse.pdf | ||
| Amendment_0003.pdf | ||
| QA_Phase_1.2.pdf | ||
| Attachment_10_Performance_Reference_Form.doc | DOC document | |
| Signed_Mod.pdf | ||
| 9._CAFB_ _MAFB_Civilian_Contractor_Env_Guide.pdf | ||
| Amendment_01_0006.pdf | ||
| 1._SOO.pdf | ||
| 5._CAFB_Labeling_Standards__2009_Rev1.pdf | ||
| 2._SOMS-CZQZ13-1136_phase_2.pdf | ||
| FA4855-16-R-0006_R.pdf | ||
| 4._CAFB_Architectural_Compatibility_Guide-2012.pdf | ||
| 8._WD_Phase_1_and_2.pdf | ||
| 7._CAFB_Sustainable_Landscape_Development_Plan_-_2012.pdf | ||
| 6._CAFB_Electrical_Standards_-_2014.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Re ace Po e mounted transformer with Pod mounted transformer
--- J ---- -nsto 4 wo PMS next to po e #318
TP319
318 319
I
T-ET64
225KVA
�,OPEN HERE I
I
. I
22or < · •
I ·
· b ·
I I
�� 1
T2206 \�[: __ ____
225KVA \I
I r-----��J
I
Notes:
1. So id ine
2. Dashed
3 21 depict overhead ines ine depict underground in es /
I
I
I I I
Attachment 3/ 20 January 2016 FA4855-16-R-0006
1470016694C Stamp
1470016694C Stamp
File details come from the government source that posted it. Updated .