This document is a Questions and Answers (Q&A) form for Solicitation FA483025R0006, a Department of the Air Force Air Combat Command project for maintaining airfield and markings at Moody AFB. The project involves comprehensive runway and taxiway maintenance, specifically rubber removal and repainting, with key specifications including removing and repainting runway markings across approximately 240,000 square feet, disposing of industrial and solid waste, and completing the work in a single mobilization.
The Q&A document clarifies critical project details such as waste management (frac tanks and roll-off dumpsters may remain on-site), work access (potential weekend and night access with prior approval), and operational requirements. Notable clarifications include confirmation that no lead-based paint exists, environmental testing may be required, and the contractor is responsible for site preparation, barriers, and safety zones. The government will provide specific runway number changes and priority work schedules at the pre-construction meeting, with the expectation that key personnel like the Superintendent can potentially hold multiple roles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23 CONS Questions & Answers Form
| Solicitation Reference |
| Question/Comment |
| Government Response |
| Resulted in change of SOW or drawings? |
| Change Reference |
| 01 |
| SOW Para 10.1 |
| Please confirm the damage to be repaired is only that damage caused by the contractor as a result of the performance of the work. |
| Any damage to airfield pavements incurred by the Contractor must be repaired at Contractors expense. |
no
N/A
| 02 |
| SOW-4.1 |
| Please provide true estimated quantities for paint removals and repainting on which to base proposals. Assuming the sq ft estimates provided for Hot Pit, Txwy Lima, Txwy Hotel, Txwy Kilo are correct reflections of the scope, the map showing desired services ( specifically in blue )m on the inside runway, does not truly reflect actual sq ft by a long shot. |
Without specifics, the following is approximate sq feet in the blue areas on the inside runway:
Center Lines 7,920 White 2,640 Black
Edge Lines 26,856 White 8952 Black
Overrun Chevrons 12,000 Yellow ( We didn’t count the blacked out Chevrons )
* Also, if these are the true amounts of sq footage, is this to be removed as indicated before being replaced ?
Quantities provided as attachment to SOW are accurate. The blue shade on the map was only to illustrate the locations of the rubber removal, not the complete extents of rubber removal. We need 60’ by 2,000’ on both sides of inside runway giving a total of 240,000 SF. The overruns do not need new restriping and will not be part of the project. The Runway Numbers on BOTH runways will require removal and repainting. The new numbers will be provided.
| 03 |
| N/A |
| Besides a superintendent, will a QC Manager & SSHO be required onsite? If so, please provide specifications for that requirement. Additionally, can those positions be collateral? |
| The superintendent may be your designated “QC Manager” and they’re not required to by onsite 24-7. We will request daily/weekly progress updates and reports. |
| 04 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Will frak tank collection services be required for all industrial waste water/ “greywater” that is produced and retrieved at Moody AFB? |
Yes
| 05 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Could the frak tanks remain on site for the full duration of the project scope or would it have to be removed after every phase? |
They may remain in the agreed upon staging area within the airfield.
| 06 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Confirm a rolloff dumpster would be required to be used for solid disposal following paint/rubber removal. |
| Correct |
| 07 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Could the roll off dumpster remain on site for the full duration of the project scope or would it have to be removed after every phase? |
It may remain in the agreed upon staging area within the airfield.
| 08 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Is there a specific landfill that the government would require the liquid and solid waste to be disposed at? |
No
| 09 |
| SOW-2.3 & 5.2.2 & 11.1 |
| Could the government confirm that there is no lead based paint in any of the markings to be removed by the contractor? |
None of the current airfield markings are lead based.
| 10 |
| N/A |
| In regards to working hours, should we assume daytime access to the taxiway and nighttime access to the runway? If so, could working hours for both be provided? Would weekend access be granted? |
The airfield operations vary quite a bit, week to week. However, there can be weekend and night access granted with prior approval.
| 11 |
| N/A |
| If we were to utilize a removal truck that encompasses a vacuum system, would a sweeper truck still be necessary to follow behind the removal truck when conducting paint removal? |
Yes, at least once following paint removal prior to aircraft using the pavement.
| 12 |
| N/A |
| Since the cost range of testing can vary greatly from $150 to $2,500 per test, what specific environmental tests will be expected to be performed on the industrial waste liquid “grey water” and rubber/paint solids? |
Not sure if this is applicable.
| 13 |
| N/A |
| Are runway closure “ X “s and barricades required of the contractor or will these be provided by the government? |
Within reason, Section 9.1 in SOW says Contractor shall provide all barriers, cones, etc.. to establish a clear and safe work zone.
| 14 |
| N/A |
| With regard to project phasing, is it the intent for the contractor to complete the project in one mobilization or multiple mobilizations? |
One mobilization, since most of the work to be performed requires similar equipment.
| 15 |
| N/A |
| Please provide a priority schedule for areas to be worked. |
| Will be provided at Pre-Con Meeting |
| 16 |
| FA483025R0006 |
| Do we know how old the concrete is where the rubber needs to be removed? |
| We do not. There are not any definitive records of when the runway pavements were repaved. |
| 17 |
| FA483025R0006 |
| Are we able to double or triple hat the SI, QCM, SSHO? |
| Yes, as long as they are comfortable with all responsibilities and obligations. |
| Will the Government or the Contractor be responsible for removing any grass areas that encroach any of the edge lines? If so, is there a Qty and Line Item for this? |
| It will be the Contractors responsibility, if needed, however there is no quantity or line item for it. Could be added to site preparation if determined necessary.. |
| The statement of work says the runway numbers need to be changed. What are they changing too, are they both runways, are the L and R being removed and repainted? |
| We will provide those numbers at the Pre-Con, yes it includes all runway designations on both runways and both ends. All current paint will be removed and repainted, including L and R. |
| Was clause 52.223-23 omitted from solicitation in error? |
| Yes, clause 52.223-23 – Sustainable Products and Services (MAY 2024)(DEVIATION FEB 2025) does apply to this effort and will be included in resultant award. |
| No |