Amendment3SOW.FridgeFreezerCombo.pdf
PDF 119 KB Posted
- Attached to
- Walk In Fridge & Freezer
- Solicitation number
- FA483025Q0006
About this file
This Statement of Work (SOW) outlines requirements for installing a walk-in refrigerator/freezer combination unit at Moody AFB Field Club (Building 901) in Georgia. The project involves replacing a 30+ year old unit that requires monthly maintenance.
The new unit specifications include: 11'W x 29'L x 7'7"H two-compartment walk-in unit with 2:1 ratio (two-thirds refrigeration, one-third freezer), floor-integrated installation, right-hinged doors, 115v/230v 1ph cooler unit and 230v/230v 1ph freezer unit. The contractor must provide all equipment, labor, shipping, installation, demolition/removal of existing equipment, system start-up, training, and sprinkler system installation. Key requirements include using the existing concrete pad, temporary removal/reinstallation of satellite dish, standard 1-year warranty, and completion by April 30, 2025. Work hours are Monday-Friday 8:00 AM to 5:00 PM, with weekend work requiring 24-hour advance approval. Contractors must submit both a Statement of Work and technical specifications/blueprints with their quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FREQUENTLY ASKED QUESTIONS(Revised).pdf | ||
| Amendment3.WalkInFridgeComboSynopsis.pdf | ||
| Amendment.WalkInFridgeComboSynopsis.pdf | ||
| FridgeFreezerFAQandPhotos.docx | DOCX document | |
| 23 CONS Base Pass Template.pdf | ||
| BaseMap.MoodyFieldClub.pdf | ||
| WalkInFridgeComboSynopsis.pdf | ||
| SOW.FridgeFreezerCombo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Refrigerator and Freezer Combination Unit Project
1. Scope
The Moody AFB Refrigerator and Freezer Combination Unit located at 4251 George St, Bldg. 901, Moody AFB, GA 31699 requires replacement. 23d FSS requires full replacement of the current refrigerator and freezer combination unit. All existing equipment to include current walk-in box unit and condenser units require replacement and updated to current codes. The removal and disposal of old unit and condenser units.
1.1 Background
The current unit requires maintenance monthly to stay working properly. Current system is 30+ years old.
2. Requirements for the Refrigeration/Freezer Unit:
Introduction
The purpose of this Statement of Work (SOW) is to outline the requirements for the installation of a walk-in refrigerator/freezer unit at Moody Field Club. The selected Contractor shall provide all necessary equipment, labor, and services to complete the project in accordance with the specifications and requirements outlined in this document.
Scope of Work
The Contractor shall provide and install a 2-compartment walk-in refrigerator and freezer unit with the following specifications:
• Size: 11'W x 29'L x 7'7"H
• Walk-in Cooler Refrigeration Unit: 115v/230v, 1ph
• Walk-in Freezer Refrigeration Unit: 230v/230v, 1ph
• Compartment size ratio: 2:1, with two-thirds of the space allocated to refrigeration and one-third to freezing
• Floor-integrated installation
• Doors hinged on the right side, opening from the left
The Contractor shall also provide all necessary equipment and supplies, including:
• Shipping and delivery of all items
• Installation of all components
• Demolition and removal of existing equipment
• Equipment rentals relevant to the installation process
• System start-up and on-site training
• Sprinkler system included/installed with unit
Salient Characteristics
The walk-in unit shall have the following salient characteristics:
• Size of freezer: minimum 11' to maximum 12' side to side
• Floor-integrated installation
• Doors hinged on the right side, opening from the left
Civil Engineering Requirements
The Contractor shall ensure compliance with all applicable Civil Engineering (CE) regulations and standards throughout the project duration, including prior to and following project completion, as a condition precedent to payment. The Contractor shall restore any modifications or alterations made to the existing building during the project to their original or equivalent condition upon completion.
Specific Requirements
The Contractor shall ensure that the Fridge/Freezer units are properly sealed and reintegrated into the building's infrastructure, restoring them to their original condition, to prevent any potential damage or compromise to the building's structure or systems.
Project Schedule
The project shall be completed by 30 April 2025.
Warranty
The Contractor shall provide a standard 1-year warranty for all equipment and workmanship.
Existing Conditions
• Existing concrete pad shall be re-used for the installation of the new unit.
• Temporary removal and reinstallation of satellite dish
Working Hours
The Contractor shall work within the following hours:
• Monday to Friday: 8:00 AM to 5:00 PM
• Saturday and Sunday: with prior approval from the facility manager, with minimum 24 hours' notice in writing.
Submission Requirements
To be considered for this project, the Contractor shall submit the following documents with their quote:
• Statement of Work
• Technical specification of unit (blueprint/drawing)
Failure to provide these documents may result in the submission being excluded from technical evaluation and consideration for this requirement.
By submitting a quote for this project, the Contractor acknowledges that they have read, understood, and will comply with all the requirements outlined in this SOW.