This document contains a series of questions and answers related to a federal contract opportunity for the extension of the NCO Beach Boardwalk at Tyndall Air Force Base. The key details are:

The contract is for a Design-Build project to extend the existing NCO Beach Boardwalk by 600 feet, matching the existing boardwalk design. The project must comply with current building codes, including the DoD Building Code and the Florida Building Code's High Velocity Hurricane Zone (HVHZ) provisions. The service road is to remain open during construction. The contract has a 120-calendar day period of performance. Contractors are required to provide a topographic survey, geotechnical report, and SWPPP as part of the design. Construction methods are specified, including a top-down approach and limits on equipment access. The contractor will be responsible for as-built drawings upon completion.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Project: Tyndall NCO Beach Boardwalk Extention

1Approximate routing of the beach walkout in relation to the sand dunes?Extend Boardwalk 600" from connecting to existing boardwalk after demo of handicap ramp . Boardwalk to run right of the Access Drive.
2Surveying requirements; topo or soil testing required?Topograhic
3Our understanding is we have 120-calendar days to complete, is that correct?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( D)
4Are we removing 3 panels back to the elevated section of the current walkway or starting the 600' addition from where it currently meets the sand?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
5Payment terms?Contact:: Thomas B. Elliott, GS-12, DAF, Contracting Officer / Base Infrastructure Flight
6Anticipated start date?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( D)
7Does a natrual species of vegetation need to be replanted in the disterbed work areas?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
8In addition to the original boardwalk drawings, would the Government please furnish the original permit(s) for the existing boardwalk ?NO
9Will as-builts of the existing boardwalk be shared with bidders?YES Contracting will send as-builts to contractors
10Will a topographic or geotechnical survey be shared with bidders? If not, are bidders required to provide these as part of the design?Topograhic
11Is the new boardwalk to be 17'-8" wide as stated on the conceptual drawings, or is it to match existing?No, Existing Width is 6' 6" outside to outside
12What is the intended elevation above grade for the surface of the proposed boardwalk? Is the proposed boardwalk to follow the contour of the dunes or will excavation be required should dune elevations interfere with boardwalk construction?YES SEE332 Conservation Measures for Dune Walkover Construction # 3
13Is a portion of the existing boardwalk to be demolished before tying in the proposed boardwalk? Will the limits of demolition be provided?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
14Is top-down construction required, or can construction occur from the access road and boardwalk footprint?YES SEE332 Conservation Measures for Dune Walkover Construction # 3
15What grade and treatment is desired for all lumber? What type of hardware is desired for all fasteners? Should new bench surfaces and top rail be HDPE to match existing? Is there a preferred manufacturer of HDPE material?See as-built drawings site Plan C2 ; Construction Material and Excution of WorkS
16Will an as-built survey be required upon completion of the project?YES red line as-built.
17Will there be limitations to pile installation methods, i.e. jetting, vibrating, augering, hammering? Can water be pulled form the gulf for jetting of pile?See As-Builts Drawing
18Can the existing access road be utilized for equipment and material transport? Can the existing boardwalk be utilized for equipment and material transport? Does the existing boardwalk have a load rating?Only the access road can be used for equipment and material transportation.
19Will there be a designated area in the parking lot for the contractor to use for material and equipment staging?Yes material storage and Parking in existing parking lot , Laid down area approved bt base.
20Is there a water source (hose bib) located at the bathroom in the parking lot that the contractor can utilize for rinsing of small tools and PPE?There is a water hose bib located by the restroom and Parking lot. Contractor must get area clean.
21Are there dead and live load and pile bearing requirements? Can you confirm that the conceptual drawings note for a 5' min embedment is correctSee As-Built Drawing s for information on Construction Material and Execution of work.
22In reviewing on site conditions during the 7/16/2024 site walk, it appears the handrail stanchions are lag screwed into the end grain of the cap. Over time, that type of construction may not age well. Please advise if we are to match existing or revise the existing design for handrail stanchions.See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A) YES MATCH EXISTING
23The existing boardwalk is one solid cement slat with no drainage grooves in it. The drawings are showing a cement walkway with grooves in it. Since this is a design build, would the base be willing to continue and follow the existing boardwalk?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
24It was mentioned during the 7/16/2024 site visit that we were to match the as-builts that were sent over after the site visit via amendment 2. Are we to match the existing as-builts for the design and construction of the new boardwalk extension? The drawings included in amendment 2 are labeled as construction drawings and not as-builts.Match the existing as-builts for the design and construction of the new boardwalk extension
25Please advise if an existing topographic survey can be shared with bidders. If not, are bidders required to provide a topographic survey as part of the design? It appears we are to provide a topographic survey per "Attachment+2_Appendix+A+-+Additional+Requiements" page 53 and 54 but please advise. In reviewing the amendments sent, it appears the existing construction drawings have topo's shown but please confirm we are to provide a topo survey in the new design.Bidders are required to provide topograhic suevey as part of design.
26Is there an existing geotechnical report that was completed for the existing boardwalk and can it be shared with bidders? If not, are bidders required to provide a geotechnical report as part of the design. Please advise if it will be acceptable to perform borings as part of the design to determine water level and discover soil conditions.Bibbers are requiredto provide a geotechnical report as part of design.
27Are we to design NPDES/BMP's/Erosion Control Measures and implement and inspect for construction? It appears we are to include them as part of the design in reading "Attachment+5_NCO+Beach+Boardwalk-FINAL+ENVIRONMENTAL+ASSESSMENT", pages 3-38 and 3-39 but please advise.Yes, this is referenced on Pages 3-38 and 3-39. The contractor shall provide a Stormwater Pollution Prevention Plan (SWPPP) which will be reviewed by base environmental first and upon concurrence, the contractor will apply for a Construction Generic Permit (CGP) with the Florida Department of Environmental Protection (FDEP).
28In reviewing "Attachment+_APPENDIX+B+-+CONCEPT+ONLY+...NCO+BASE+BOARDWALK+XLWU25-4009" number 6 and 7, it appears we are to have no activity on existing healthy dunes during any time of the year except as needed to repair the walkover/boardwalk (number 6) and that if dune restoration is needed for this project we are to contact USFWS, etc. (number 7). In reviewing conditions on site, it appears that we will construct the new walkover/boardwalk through and over existing healthy dunes. Number 6 notes that we cannot have any activity on existing healthy dunes unless it is for repair to the walkover/boardwalk. Would repair and construction be considered the same thing? Additionally, what will warrant dune restoration and what remediations will need to take place if restoration is warranted?In accordance with the completed Environmental Assessment, no work shall take place in the dunes, to include driving and equipment storage. Extension of the boardwalk does not require any work to the dunes.
29In reviewing "Attachment+_APPENDIX+B+-+CONCEPT+ONLY+...NCO+BASE+BOARDWALK+XLWU25-4009" conceptual drawings it appears we are to provide turtle safe walkway lighting but number 9 calls out for no lighting to be utilized on the dune walkover. In reviewing the existing conditions on site, it appears there were no turtle safe walkway lighting. Please advise if we are to provide turtle safe walkway lighting. Additionally, the existing walkway precast concrete panels as found at the site visit were not slotted. Per 4/T2, we are to provide precast concrete panels with 3/8" slots. Please advise if we are to provide slotted or unslotted precast concrete panels. Furthermore, the existing walkway was 6' wide precast concrete panels and 7' total width and 4/T2 calls out for precast concrete panels to be 15' wide with the out to out being 17'-8" wide per 6/T2. Are we to match the existing precast concrete panel width and total width or follow the conceptual drawings?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
30What height shall the new walkway/boardwalk be (top of precast concrete panel)? In reviewing the conceptual drawings, 2/T2, it appears the top of precast varies in height and number 1 calls out they should be a minimum of three feet above grade. In reviewing conditions on site, it appears the top of precast concrete panel was approximately 3'-8" before the walkway ramped down to the beach.YES SEE 332 Conservation Measures for Dune Walkover Construction # 1
31Please advise for where we are to tie into the existing walkway/boardwalk. It appears documents given on sam.gov do not show but do call for the new walkway/boardwalk to be 600' in length. Are we to tie into the existing boardwalk at the bottom of the ramp near beach level or are we to tie into the boardwalk before the ramp begins to slope down? If we are to tie into the boardwalk before the ramp begins to slope down, please provide a location and distance of what will be required to demolish the existing boardwalk to make the tie in.See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
32Would it be acceptable for minor grading to take place to allow for the height of boardwalk to remain consistent or is the goal for there to be as little disturbance on the beach as possible? If the goal is for as little disturbance on the beach as possible, will it be acceptable for the boardwalk to vary in height?YES SEE 332 Conservation Measures for Dune Walkover Construction # 1
33In reviewing "Attachment+_APPENDIX+B+-+CONCEPT+ONLY+...NCO+BASE+BOARDWALK+XLWU25-4009" number 3, it appears we are to construct the walkway/boardwalk in a top down method. Is this required or recommended? Number 3 notes that it should be utilized but not that it is required. Can we utilize equipment on the access road and/or ground beneath the boardwalk footprint during construction?Top down method is required. Access road can be use to move equipment and material. Do not block access road.
34In reviewing "Attachment+_APPENDIX+B+-+CONCEPT+ONLY+...NCO+BASE+BOARDWALK+XLWU25-4009" 7/T2, it appears benches (min of 2) are required at observations areas, either side of pier entrance to observation areas, and others distributed down the pier walk area. Please confirm where observations areas are to be located within the 600' extension and if any other benches are to be distributed down the pier walk area.No obervation area on boardwalk extention. Benches are required .
35In reviewing "Attachment+5_NCO+Beach+Boardwalk-FINAL+ENVIRONMENTAL+ASSESSMENT", pages 3-52 it appears that the southern portion of the LOD for the extension of the NCO Beach Boardwalk has not been surveyed for archaeological resources. Are bidders to include a survey for this southern portion of the LOD to confirm if archaeological resources are present?The bidders are not required to perform surveys in the southern portion of the LOD.
36It was mentioned during the 7/16/2024 site visit that the design review process could be lessened to one submission. However, "Attachment+2_Appendix+A+-+Additional+Requiements" lays out a 35%, 65%, 95% and 100% submittal process. Would it be acceptable to do one 100% submittal in lieu of 4 different submissions?See SOW 1.3 Other Requirements; (B) Only 100% Design Drawings request.
37In reviewing "Attachment+2_Appendix+A+-+Additional+Requiements" it appears specifications will be required as part of the design. Will design drawings be sufficient or will be specifications be required as well?Design drawings and Specifications will be required.
In reviewing "Attachment+5_NCO+Beach+Boardwalk-FINAL+ENVIRONMENTAL+ASSESSMENT", there are several references to backfilling the area washed out by storm activity (approximately 190 cubic yards) with a clean sand material similar to the native surficial sands. Is this required and if so where are we to backfill 190 CY as it appears no area is shown on the conceptual drawings or other documents? Is this area what is shown in the newly issued attachment 14?Not part of this project.
39In reviewing "Attachment+5_NCO+Beach+Boardwalk-FINAL+ENVIRONMENTAL+ASSESSMENT" it appears that a draft EA has been completed and approved by the SHPO and Native American Tribes but please advise the final EA has been approved. Per A-62 and A-63 it appears the draft EA was approved but the Native American Tribe wants bidders to have archaeological monitors in place. Please confirm what archaeological monitors are to be put in place. It is mentioned that a Phase I Archaeological Survey was completed by the Air Force but will a Phase II survey be required?The Final EA was completed March 2024, and does not require monitoring for the NCO Beach Boardwalk Project.
40What grade and treatment is desired for all lumber? What type of hardware is desired for all fasteners? Should new bench surfaces and top rail be HDPE to match existing? Is there a preferred manufacturer of HDPE material?See As-Built Drawing Boardwalk Details( S4) Contruction Material and Execution of work
41Will an as-built survey be required upon completion of the project?YES as-built drawing
42Will there be limitations to pile installation methods, i.e. jetting, vibrating, augering, hammering? Can water be pulled form the gulf for jetting of pile?See Appendix_B Conservation Measures for Dune Walkover Construction # 3 Construction
43Can the existing access road be utilized for equipment and material transport? Can the existing boardwalk be utilized for equipment and material transport? Does the existing boardwalk have a load rating?Only the access road can be used equipment and material transportation.
44Will there be a designated area in the parking lot for the contractor to use for material and equipment staging?See question # 9
45Is there a water source (hose bib) located at the bathroom in the parking lot that the contractor can utilize for rinsing of small tools and PPE?There is a water hose bib located by the restroom and Parking lot. Contractor must get area clean.
46Are their dead and live load and pile bearing requirements? Can you all please confirm that the conceptual drawings note for a 5' min embedment is correct?See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
47In reviewing on site conditions during the 7/16/2024 site walk, it appears the handrail stanchions are lag screwed into the end grain of the cap. Over time, that type construction may not age well. Please advise if we are to match existing or revise the existing design for handrail stanchions.See SOW 1.0 SCOPE; Section 1.1 PURPOSE ( A)
48It was mentioned during the 7/16/2024 site walk that we were to fill out a form that had all divisions to submit with the bid along with financials. Would this be attachments 9 and 10?Contact:: Thomas B. Elliott, GS-12, DAF, Contracting Officer / Base Infrastructure Flight

File details come from the government source that posted it. Updated .