Attachment 3_APPENDIX B - CONCEPT ONLY Drawings EXTEND NCO BASE BOARDWALK XLWU25-4009.pdf
PDF 2 MB Posted
- Attached to
- Extend NCO Beach Boardwalk Federal contract opportunity
- Solicitation number
- FA481924R0020
About this file
This document contains "Concept Only" drawings for the project to extend the Tyndall NCO Beach Boardwalk at Tyndall Air Force Base in Florida. The intent of this Design-Build project is to extend the existing boardwalk by 600 feet to reduce negative impacts to the dune and surrounding environment caused by personnel accessing the beach. The new construction will match the existing boardwalk design and be compliant with current building codes, including the DoD Building Code and Florida Building Code's High Velocity Hurricane Zone (HVHZ) provisions. The drawings provide details on the boardwalk structure, railing, benches, and lighting. The document also outlines conservation measures to be taken during construction, such as limiting equipment storage on the beach, using a top-down construction method, and avoiding sea turtle nesting season. This appears to be an attachment or appendix to a larger solicitation for the Extend NCO Beach Boardwalk project at Tyndall AFB.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX – B
"CONCEPT ONLY" DRAWINGS
For
REQUEST FOR PROPOSAL
EXTEND TYNDALL NCO
BEACH BOARDWALK
TYNDALL AFB FLORIDA
FOR PROJECT XLWU 25-4009
TY
ND
AL
L A
IR
F
OR
CE
B
AS
E
EXTEND TYNDALL NCO BEACH BOARDWALK
PROJECT No. XLWU 25-4009
PROJECTLOCATION PROJECT NARRATIVE
THE Intent of this project tis o extend the Tyndall NCO Beach Boardwalk by 600 feet to reduce negative impact to the dune and surrounding environment caused by personnel accessing the beach of Tyndall AFB. New Construction is Design Built o extend the existing Boardwalk and its supporting facilities in full compliance with current building codes, including the DOD Building codes. and the porsitions of the Florida Building Codes that contains the High Velocity Hurricane Zone (HVHZ) provisions. New Construction will match existing boardwalk design.
DRAWING INDEX
SHEET
GULF OF MEXICO
DESCRIPTION OF SHEET
T1 COVERSHEET
T2 CONCEPT DETAILS
T3 Extension of Boardwalk T4 Pictures T5 Pictures
CONCEPT ONLY - NOT FOR CONSTRUCTION
RE
VI
SI
ON
S
BY
DA
TE
DE
SC
RI
PT
IO
N
No
SY
MB
OL
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
5T
H
CI
VI
L E
NG
IN
EE
RI
NG
S
QU
AD
RO
N
M
IS
SI
SS
IP
PI
A
VE
NU
E
TY
ND
AL
L A
FB
, F
LO
RI
DA
TE
L:
(8
) 2
-2
SI
GN
ED
B
Y:
BU
TC
HE
R
DR
AW
N
BY
BU
TC
R
VI
EW
ED
SH
AR
KE
Y
CO
VE
RS
ET
AP
PE
ND
IX
C
RI
TA
GE
P
AR
K
PI
ER
TY
ND
AL
L
AI
R
FO
RC
E
BA
SE
, F
LO
SCALE H: NTS V: NTS
PROJECT: XLWU 21-4006
T1 SHEET 1 of 6
F
EB
2 SCALE: " = 1'-0"
4 4
3 SCALE: " = 1'-0"
4 4
4 SCALE: " = 1'-0"
SS SCREWS EACH RAILING JOINT (TYP)
2x4 TOP RAIL
4x6 RAILING SUPPORT
2x4 RAILING
2x6 RAILING
MEMBERS
(4 EACH)
2X4 TOP RAIL
(4) 2X6 RAIL
ALUMINUM HAND RAIL
SCREWS CONTERSUNK
SS SCREWS EACH
RAILING JOINT (TYP)
PILING W/CHAMFER
(TYP)
INTERIOR RAILING
SUPPORT W/CHAMFER
(TYP)
4X6 PANEL EDGING BEAM
(SHIM WITH TREX FASCIA
BOARD AS REQUIRED)
~17'-8"
LAG BOLTS & WASHERS AT
PILINGS AND INTERMEDIATE
VERTICAL SUPPORTS (TYP)
SS SCREWS EACH
INTERMEDIATE SUPPORT (TYP)
WOOD GIRDER
(TYP)
TURTLE SAFE WALKWAY
LIGHTING (TYP)
PRECAST
CONCRETE PANEL
TIMBER
PILING TYP
4x10 GIRDER
TURTLE SAFE WALKWAY
LIGHTING (TYP)
CARRIAGE BOLT,
WASHER & NUT (TYP)
LAG BOLTS & WASHERS
AT BASE OF INT. RAILING
SUPPORT
CARRIAGE BOLT, OGEE
LONGITUDINAL SECTION - BOARDWALK & RAILING
BOARDWALK & HAND RAILING
SCALE: 1" = 1'-0"
BOARDWALK & HAND RAILING
SCALE: 1" = 1'-0"
10'-0"
TYPICAL SPAN
10'-0"
TYPICAL SPAN
PILING (TYP)
2X4 TOP RAIL
2X6 RAIL
BEYOND
2X6 SIDE BRACE (TYP)
2X6 TOP (TYP)
1X6 TREX COMPOSITE
BACKING OR EQUAL (TYP)
2X12 CUT SEAT
FRAME (TYP)
15°
2X12 CUT SEAT
FRAME (TYP)
WOOD GIRDER
MULTIPLE TIMBER
PILINGS (AS
NEEDED TO
SUPPORT
DESIGNED LOAD
REQUIREMENTS)
2X6 LOWER
BENCH FACING
CONCRETE
PANEL
1X6 TREX COMPOSITE
SEAT OR EQUAL (TYP)
2X6 SEAT FRAME (TYP)
5°
15°
CARRIAGE BOLT
PLAN AT TOP OF GIRDERS
4X6 PANEL
EDGING BEAM
WOOD PILING (TYP)
CARRIAGE BOLT,
INTEGRATED BENCH
VERTICAL NOTCHS FOR
FASTENERS
INTEGRATED BENCH
WASHER & NUT (TYP)
4X6 RAILING SUPPORT (TYP)
PILING (TYP)
4X6 EDGING BEAM (TYP)
* INTEGRATED BENCHES; (MIN OF 2) AT OBSERVATION AREA
EITHER SIDE OF PIER ENTRANCE TO OBSERVATION AREA, OTHERS
DISTRIBUTED DOWN THE PIER WALK AREA
5'-0" (TYP) 5'-0" (TYP)
CONCRETE PANELS
WITH 3" SLOTS
PLAN AT TOP OF PRECAST CONCRETE PANELS
CONCEPT ONLY - NOT FOR CONSTRUCTION
SCALE H: NTS V: NTS
PROJECT: XLWU 21-4006
T2 SHEET 3 of 6
~1 7'-
8"
~1 6'-
0"
'-0
PA
NE
L(
S) W
ID
TH
VA
ES
MI
N 5'-
0" 3'-
6"
VA
ES
3'- 6"
CO
NC
EP
T
ON
LY
VI
SI
ON
S
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
TY
ND
AL
L A
IR
F
OR
CE
B
AS
E
5T H
CI
VI
L E
NG
IN
EE
RI
NG
S
QU
AD
RO
N
M
IS
SI
SS
IP
PI
A
VE
NU
E
TY
ND
AL
L A
FB
, F
LO
RI
DA
TE
L:
(8
) 2
-2
DE
SI
GN
ED
BU
TC
HE
R
SY
MB
OL
No
D
ES
CR
IP
TIO
N
BY
EX
ND
TY
ND
AL
L N
CO
BE
AC
H
BO
AR
DW
AL
K
DR
AW
N
BY
BU
TC
HE
R
RE
VI
EW
ED
SH
AR
KE
Y
F
EB
5 6
Figure 2-2 Tyndall AFB Various Construction Project Location #2 – Extend Tyndall NCO
Boardwalk
2-4 Proposed Action and Alternatives
Final E
Looking at Service Road and Boardwalk
End of Boardwalk with Handicap Ramp
Conservation Measures for Dune Walkover Construction September 2015
1. Walkovers/Boardwalks. Dune walkovers shall be constructed at a height (minimum three feet above grade – higher if habitat has been impacted from storms) to accommodate natural dune growth and associated vegetation.
2. Equipment storage. No storage of equipment or materials shall occur on the beach or dunes throughout the entire year.
3. Construction. A top down construction method should be utilized. This would limit human and mechanical impacts to the dunes by allowing the new construction to progress outward from the previous construction.
4. Sea turtle nesting. No walkover/boardwalk construction shall occur on the beach during the sea turtle nesting season from May 1 through November 1.
5. Sand fence. Minimal use of sand fence is encouraged. When used, the fence must be used for restoration of dune blowouts. Post and rope is preferred for beach visitor access, pedestrian traffic control, and wildlife exclusion zones (i.e., bird wintering areas). If used for dune restoration, the fence shall be placed in a sea turtle compatible design and be made of biodegradable material.
6. Dune protection. No activity, except as needed to repair the walkover/boardwalk, shall occur on existing healthy dunes during any time of the year. Limit activities within this area to maintenance and restoration of the habitat. Use appropriate signs to designate and indicate the purpose of the conservation area, if necessary.
7. Restoration. If dune restoration is needed for the dune walkover construction project, contact the USFWS Panama City Field Office for further assistance.
8. Refuse. Install and maintain sturdy animal-proof garbage containers to prevent the invasion of house mice, non-native rats and predators (cats, raccoons, fox, coyotes).
9. Lighting. No lighting shall be utilized on the dune walkover.
T5 OF 6
U.S. Fish and Wildlife Service 1601 Balboa Avenue Panama City, Florida 32405
(850) 769-0552 http://www.fws.gov/panamacity/ http://www.fws.gov/panamacity/
End of Boardwalk with Handicap Ramp
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service’s Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes (e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824- 5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006 O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
T6 OF 6
| 7 |
| T2 |
| Looking at Service Road and Boardwalk |
| End of Boardwalk with Handicap Ramp |
| UNITED STATES DEPARTMENT OF COMMERCE |
| SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS |
File details come from the government source that posted it. Updated .