FA4814-11-R-0006 MacDill AFB Flooring IDIQ Solicitation.pdf
PDF 291 KB Posted
- Attached to
- MacDill AFB Flooring IDIQ Solicitation
- Solicitation number
- FA4814-11-R-0006
About this file
FA4814-11-R-0009 MacDill AFB Flooring IDIQ Soliciation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Flooring Bid Schedule rev 2.xlsx | XLSX spreadsheet | |
| Attachment 1 Flooring Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 8 Seed Project RFP.docx | DOCX document | |
| Attachment 2 SOW Flooring IDIQ MacDill AFB.docx | DOCX document | |
| Attachment 4 Climatic Data Summary.doc | DOC document | |
| Attachment 7 MacDill AFB Contractor Security.docx | DOCX document | |
| Attachment 5 Financial Info.docx | DOCX document | |
| Attachment 6 Green procurement.doc | DOC document | |
| Attachment 1 Flooring Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 3 General Decision Number FL 117 Building.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOORING INDEFINITE DELIVERY- INDEFINITE QUANTITY (IIDIQ) CONTRACT
SECTIONS K, L AND M WILL BE REMOVED FROM ANY RESULTANT AWARD.
THE SOLICITATION IS ISSUED AS 100% COMPETTIVE SMALL BUSINESS SET-ASIDE IAW FAR 19.502.
SOLICITATION WILL RESULT IN A SINGLE AWARD FIRM-FIXED PRICE CONTRACT
ALL ITEMS MUST BE BID TO BE EVALUATED, SCORED, AND CONSIDERED RESPONSIVE.
NOTE: PRICING OF SEED PROJECT WILL BE IN LINE WITH ATTACHMENT #1 BID SCHEDULE PRICING. SEED PROJECT TOTAL PRICE WILL NOT
DETERMINE AWARD RECIPIENT.
KENNY L. SIBERNAGEL 813-828-1037
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-May-2011
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescr ibed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Jun 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
6TH CONTRACTING SQUADRON
2606 BROWN PELICAN AVE.
MACDILL AFB FL 33621-5000
FA4814
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
813-828-5485FAX:TEL: 813-828-2925 TEL: FAX:
FA4814-11-R-0006 51
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4814-11-R-0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Lump Sum
Base Year - Flooring IDIQ
FFP
Base Year - Flooring IDIQ. See attached Bid Schedule to input unit prices. Total CLIN price will be the agregate of CLINs 0001AA - 0005BI.
FOB: Destination
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 1 Lump
OPTION Option Year 1 - Flooring IDIQ
Option Year 1 - Flooring IDIQ. See attached Bid Schedule to input unit prices.
Total CLIN price will be the agregate of CLINs 1001AA - 1005BI.
UNIT UNIT PRICE MAX AMOUNT
2001 1 Lump
OPTION Option Year 2 - Flooring IDIQ
Option Year 2 - Flooring IDIQ. See attached Bid Schedule to input unit prices.
Total CLIN price will be the agregate of CLINs 2001AA - 2005BI.
UNIT UNIT PRICE MAX AMOUNT
3001 1 Lump
OPTION Option Year 3 - Flooring IDIQ
Option Year 3 - Flooring IDIQ. See attached Bid Schedule to input unit prices.
Total CLIN price will be the agregate of CLINs 3001AA - 3005BI.
UNIT UNIT PRICE MAX AMOUNT
4001 1 Lump
OPTION Option Year 4 - Flooring IDIQ
Option Year 4 - Flooring IDIQ. See attached Bid Schedule to input unit prices.
Total CLIN price will be the agregate of CLINs 4001AA - 4005BI
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,000.00 $1,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 30 dys. After Date of
Contract Award
1 6TH CIVIL ENGINEERING SQUADRON
JOHN CAMPBELL
6 CES
7621 HILLSBOROUGH LOOP
BLDG 11
MACDILL AFB FL 33621-5207
813-828-0990
F2V3F9
1001 30 dys. After Date of
Contract Award
1 (SAME AS PREVIOUS LOCATION)
2001 30 dys. After Date of
1 (SAME AS PREVIOUS LOCATION)
3001 30 dys. After Date of
1 (SAME AS PREVIOUS LOCATION)
4001 30 dys. After Date of
1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date of award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than to be stated on each individual task order The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
WIDE AREA WORKFLOW – RECEIPT AND ACCEPTANCE (WAWF-RA)
ELECTRONIC RECEIVING REPORT AND INVOICING INSTRUCTIONS
IN ACCORDANCE WITH DFARS 232.7002, USE OF ELECTRONIC PAYMENT REQUESTS ARE
MANDATORY. USE OF WAWF WILL ALLOW YOU TO MONITOR YOUR PAYMENT STATUS
ONLINE. THERE ARE NO CHARGES OR FEES TO USE WAWF.
Requests for payments must be submitted electronically via the Internet through the Wide Area WorkFlow – Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil .
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Limestone through the DFAS Centralized Customer Service number (800) 756-4571 (select option 2) or faxed to (866) 392- 7091. Please have your order number and invoice number ready when contacting DFAS about payment status. You can also access payment information using the DFAS myInvoice web site at http://www.dod.mil/dfas/contractorpay/myinvoice.html.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR RECEIVING
REPORTS, INVOICES AND ADDITIONAL E-MAILS CORRECTLY THROUGH WAWF. (TO
BE COMPLETED UPON AWARD)
CONTRACT NUMBER:
DELIVERY ORDER NUMBER:
TYPE OF DOCUMENT: CONSTRUCTION INVOICE
CAGE CODE:
ISSUE BY DODAAC: FA4814
ADMIN DODAAC: FA4814
PAY OFFICE DODAAC: F67100
SERVICE ACCEPTOR / SHIP TO: F2V3F9
THESE ARE NOT TYPICIALLY USED – VERIFY PRIOR TO INSERTING INTO CONTRACT
LOCAL PROCESSING OFFICE:
CONTRACT ADMINISTRATOR: kenny.silbernagel@us.af.mil
CONTRACTING OFFICER:
BPN ver 08/02/13 Please contact the POCs above if you have any questions regarding the invoicing process.
https://wawf.eb.mil/�
Section H - Special Contract Requirements
6 CONS – HAZMAT HAZARDOUS MATERIAL
All HAZMAT contemplated for use or brought on base for the purpose of this contract, must be coordinated through the HAZMAT Pharmacy, located in bldg. 49 at Paperclips, Etc. Contractor must provide the Quality Assurance Personnel with a copy of the MSDS (Material Safety Data Sheet) prior to using the HAZMAT and maintain a copy at the work site at all times that work is being performed. Failure to comply with these requirements may result in withholding of payment.
1.1 FEDERAL LEGAL HOLIDAYS
SPECIAL REQUIREMENTS
The following Federal legal holidays are observed by this base:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday of November Christmas Day 25 December
NOTE: Any of the above holidays falling on Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday
1.2 MINIMUM/ MAXIMUM CONTRACT AMOUNTS
The contract minimum guarantee is $2,000.00 for the life of the contract. The Government makes no representation as to the number of Task Orders or actual amount of work to be ordered in excess of the minimum guarantees specified herein. The maximum aggregate amount of the Flooring IDIQ program, inclusive of all task orders, including options, shall not exceed $1,000,000.00.
1.3 COMMENCEMENT OF WORK
No work under this contract will commence until such time as the Contracting Officer issues a written Task Order and Notice to Proceed under the Task Order.
1.4 PLACE OF PERFORMANCE
The place of performance will be designated on each individual Task Order.
1.5 PROPOSAL PREPARATION COSTS
The costs for preparation of Task Order proposals shall be the responsibility of the contractor and not directly reimbursable. Each Task Order awarded will include at a minimum all labor wages, management, supervision, mobilization, material and equipment costs, and any costs associated with any required design effort. The contractor shall furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirements of the Task Order.
1.6 REQUIRED INSURANCE (IAW FAR 28.306(b))
Reference FAR clause entitled "52.228-5 Insurance – Work On A Government Installation" the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
(a) Workmen's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
(b) General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
(c) Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
(d) The contractor agrees to execute an insurance certificate with the Contracting Office in accordance with Section H, Required insurance. This certificate shall be executed on the form entitled “Acknowledgement and Certification of compliance with Contract Insurance Requirements”. The Certificate of Insurance shall provide for thirty (30) days written notice to the Contracting Officer by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned “Insurance” clause.
1.7 DAVIS BACON WAGE DETERMINATION
Individual task orders will be subject to one or more of the applicable Wage Determinations at the time of contract award (see Section J, List of Attachments).
1.8 SUBCONTRACTING RESPONSIBILITIES
The contractor shall be responsible for the management and performance of all subcontractors. The contractor shall ensure Task Orders are completed within the stated requirements. The contractor is responsible for ensuring subcontracting opportunities are made available to small, small disadvantaged, women owned businesses, service disabled veterans, and HUBZone businesses in accordance with the goals of the contract.
1.9 NOTICE OF CONSTRUCTIVE CHANGES
No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
1.10 PRE-DESIGN AND/OR PRE-CONSTRUCTION CONFERENCE
Prior to commencing work under a Task Order, the Contractor shall meet with the Contracting Officer and/or designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning schedule and administering work.
1.11 PARTNERING
Partnering is a structured process, as well as philosophy of doing business with contractors and customers, that recognizes common goals through communication and teamwork. It helps create an environment where trust and teamwork prevents disputes, fosters good working relationships to everyone’s benefit, and facilitates the completion of a successful contract. In support of the command’s goals of teamwork and customer satisfaction, our policy is to practice the philosophy of Partnering on every contract we administer. Formal partnering may be required prior to and/or during performance of an individual Task Order, if determined necessary by the Government. Partnering shall be held during normal work hours.
1.12 PERFORMANCE EVALUATIONS
At the conclusion of each Task Order for construction over $500,000.00, the Contracting Office will complete a contractor’s performance evaluation and input into CCASS/ACCAS. The evaluation will take into account all aspects of the contractor’s performance. Performance evaluations may be completed at any time the Contractor’s performance is considered less than satisfactory. Contractors will be provided a copy of the performance evaluation and an opportunity to discuss the evaluation. The performance evaluations may have an impact on the award of future Task Orders.
1.13 SUBSTITUTIONS OF KEY PERSONNEL AND KEY SUBCONTRACTORS
The Contractor shall provide complete resumes for proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced and shall be no less than the standard established in the hiring criteria described in the contractor’s proposal. No change in task order pricing may occur as a result of key personnel substitutions.
The contractor shall notify the contracting office of the proposed substitution of key subcontractors (including design subcontractors) at least 30 days in advance of the substitution.
1.14 PAYMENT FOR MATERIALS STORED ON SITE
(a) This clause implements, but does not replace, FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, with regard to material payments.
(b) Consideration for payment under this contract for materials stored on site is subject to the following conditions:
(1) The contractor shall furnish the contracting officer a list of the major high-cost items to be incorporated into the contract and for which payment, prior to installation, will be requested. Those items approved by the contracting officer will be entered on the AF Form 3064, Contract Progress Schedule, as a percentage factor, or factors if items are listed individually.
(2) Payment is limited to major high-cost items. Payment of major high-cost items does not include contractor overhead and profit. Such costs as sales tax, freight, handling, pallets, etc., are excluded.
(3) Payment requests shall be consistent with approved material submittals and shall be supported by the following documents:
Certified paid vendor invoices Inventory checklists, jointly validated by the contractor, contract administrator, and/or construction inspector.
Accepted delivery tickets, if applicable.
(4) All material for which payment is requested shall be delivered to an approved location on-site, and certified that none will be removed without written permission of the contracting officer. Materials may also be stored in a bonded warehouse offsite if there no adequate storage space is available on base.
(5) Payments will be made monthly, or at more frequent intervals as determined by the contracting officer.
(6) The contractor shall remain responsible and retain title to the materials until incorporated into the work.
1.15 TASK ORDER ISSUANCE PROCEDURES
(a) Work under this contract will be ordered by written Task Orders issued on DD Form 1155 (Order for Supplies or Services) to the contractor by the Contracting Officer.
(b) Each award as a result of this solicitation will cite an individual contract number. Individual Task Orders will be placed in a sequential numbering system, which relate back to the basic contract and their assigned Task Order Number.
(c) The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders.
(d) Task Orders will be firm fixed price and clearly define the specific services to be performed or the performance desired. Each Task Order may contain additional, site or project specific, provisions. Any such additional provisions shall be a part of the Request for Proposal.
Requests for proposals will indicate funds availability. The government may request proposals with no assurance of funding and provides no assurance that task orders will be issued.
(e) Task Orders may be modified by the Contracting Officer. Modifications to task orders will be issued on Standard Form (SF) 30 and cite the Task Order Number.
1.16 Special Advanced Authority or Normal Straddle Bid
Occasionally, (generally during the last quarter of the fiscal year), the government will solicit offers for projects for which funds are not certified nor readily available. Air Mobility Command refers to these acquisitions as “Special Advance Authority” (SAA) or “Normal Straddle Bid” (NSB) projects. Under SAA funds are not available and may not become available. The Government makes no promise to award a contract. If funds do not become available for SAA projects, the Request for Quote is cancelled and no award is made. Under NSB funds may be available in the current fiscal year or the next fiscal year. If a contract is not awarded in the currentfiscal year, it will be awarded in the following fiscal year.(See AFFARS MP5332.7, Contract Funding). Submission of proposals for these acquisitions is at the sole discretion of the respective MACC contractors and their declination to participate in any or all such solicitations will not reflect negatively upon them. This includes projects that are in whole or in part “SAA” projects.
1.17 DESCRIPTION OF SUBSEQUENT TASK ORDERS
Task Orders will range from $2,000.00 to $200,000.00, with most Task Orders falling in the range below $100,000.00
1.18 PERFORMANCE AND PAYMENT BONDS – APPLICABLE TO INDIVIDUAL TASK
ORDERS
Contractor shall furnish Performance and Payment Bonds (Standard Form 25/25A) with good and sufficient surety or sureties, acceptable to the Government. The penal sums of the bond will be as shown below. A notice to proceed shall not be issued and no work shall begin until good and sufficient surety, as identified below has been received and accepted by the Contracting Officer.
(a) Performance Bond: Unless the Contracting Officer determines that a lesser amount is adequate for the protection of the Government, the penal sum of the performance bonds (Standard Form 25) shall equal one hundred percent (100%) of the contract price for each Task Order.
(b) Payment Bond:
(1) Shall equal 100% of the contract price for each Task Order.
(2) One of the following is required:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor's escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required.
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the Contracting Officer, in an acceptable form, executable by the Contracting Officer.
(v) A deposit of the types of security listed in FAR 28.204-1 and 28.204-2.
(3) Bonds are due within 10 days of the receipt of the task order.
1.19 ENVIRONMENTAL COMPLIANCE
Offerors are reminded of the environmental requirements contained in the solicitation to comply with all applicable federal state, and local environmental statutes and regulations. In addition to the scrutiny of civil environmental regulatory agencies, environmental compliance incidental to Air Force activities or on Air Force Property is subject to Air Force scrutiny. The Air Force routinely investigates environmental violations and compliance.
1.20 INSTALLATION RULES AND REGULATIONS
The rules and regulations of the installation where services are performed shall apply to the contractor and his employees while on the premises of such installation. These regulations included but are not limited to: presenting valid identification for base entrances, obtaining and using vehicle passes for all contractor-owned and/or privately owned vehicles, obeying all posted directives, and providing strict adherence to security police direction in instances where security police have been dispatched to a particular location.
1.21 UTILITY SERVICES (IAW FAR 36.514)
The Contractor will be required to participate in all Air Force energy conservation programs. Utility services furnished to the contractor by the Government from the Government’s existing system outlets and supplies will be at no cost to the Contractor, but see contract clause titled FAR 52.236-14, “Availability and Use of Utility Services,” in Section I.
1.22 SPECIAL UTILITY PROVISION
The contractor shall be responsible for any and all damages to accurately marked utilities resulting from its operations. Further, the contractor shall be held liable for all costs associated with such damages. Such costs include not only the costs to properly repair the damaged utility, but any direct costs incurred by the government to provide emergency response to the site, as well as for any other monetary losses. Such loss may also include the value of loss of productivity experienced by the government due to loss of power and /or facility evacuation arising from the utility damage. Contractors are to field verify and mark location of utilities shown on construction permit.
1.23 DESIGNATION OF GOVERNMENT INSPECTOR
The Base Civil Engineer or his authorized representative (Base Civil Engineering Support contractor is designated as the representative of the Contracting Officer for the purpose of performing Construction Contract Quality Assurance for the Government, which includes performing technical surveillance and monitoring workmanship and compliance with the plans and specification under this contract. This provision in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of this contract.
1.24 PREPARATION OF SCHEDULES FOR CONSTRUCTION CONTRACTS
The reports contemplated by FAR Clause 52.236-15 titled "Schedules for Construction Contracts" in Section I shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, “Contract Progress Schedule,” and AF Form 3065, “Contract Progress Report” unless a network schedule is specifically requested.
1.25 PHYSICAL DATA/WEATHER CONDITIONS (SEE ATTACHMENT #4)
The Operational Climatic Data Summary is furnished for the contractor’s information. The Climatic Data shows the average weather pattern at MacDill AFB FL. These charts will be used to evaluate any request for time extension due to unusually severe weather. Climatic data may be updated once a year at the time options are exercised.
Section I - Contract Clauses
52.202-1 Definitions JUL 2004 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
JUN 2010
52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000 52.204-7 Central Contractor Registration APR 2008 52.204-9 Personal Identity Verification of Contractor Personnel SEP 2007 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2010
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements
JUL 2010
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.209-8 Updates of Information Regarding Responsibility Matters APR 2010 52.211-13 Time Extensions SEP 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
OCT 2010
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-21 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data-- Modifications
OCT 2010
52.216-7 Alt I Allowable Cost and Payment (Dec 2002) - Alternate I FEB 1997 52.217-2 Cancellation Under Multiyear Contracts OCT 1997 52.219-8 Utilization of Small Business Concerns JAN 2011 52.219-14 Limitations On Subcontracting DEC 1996 52.219-25 Small Disadvantaged Business Participation Program--
Disadvantaged Status and Reporting
DEC 2010
52.219-27 Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside
MAY 2004
52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records JUN 2010 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005
52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)
DEC 2001
52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SEP 2010
52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-50 Combating Trafficking in Persons FEB 2009 52.222-54 Employment Eligibility Verification JAN 2009 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003 52.223-6 Drug-Free Workplace MAY 2001 52.223-14 Toxic Chemical Release Reporting AUG 2003 52.223-16 Alt I IEEE 1680 Standard for the Environmental Assessment of
Personal Computer Products (Dec 200&0 Alternate I
DEC 2007
52.223-18 Contractor Policy to Ban Text Messaging While Driving SEP 2010 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Engaging in Sanctioned Activities Relating to
Iran--Certification.
SEP 2010
52.226-1 Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets SEP 2009 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-13 Alternative Payment Protections JUL 2000 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes APR 2003 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-9 Limitation On Withholding Of Payments APR 1984 52.232-17 Interest OCT 2010 52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984 52.232-25 Prompt Payment OCT 2008 52.232-27 Prompt Payment for Construction Contracts OCT 2008 52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.243-5 Changes and Changed Conditions APR 1984 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Items DEC 2010 52.245-1 Government Property AUG 2010 52.245-9 Use And Charges AUG 2010 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2010 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
52.249-2 Termination For Convenience Of The Government (Fixed- Price)
MAY 2004
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
JAN 2009
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.211-7007 Reporting of Government-Furnished Equipment in the DoD Item Unique Identification (IUID) Registry
NOV 2008
252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.215-7000 Pricing Adjustments DEC 1991 252.219-7004 Small Business Subcontracting Plan (Test Program) JAN 2011 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
252.225-7002 Qualifying Country Sources As Subcontractors APR 2003 252.225-7006 Quarterly Reporting of Actual Contract Performance Outside the United States
OCT 2010
252.225-7012 Preference For Certain Domestic Commodities JUN 2010 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment MAR 1998 252.244-7000 Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
NOV 2010
252.247-7023 Transportation of Supplies by Sea MAY 2002 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of “will be completed for each task order” and the calculations will be done separately for each task order, for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Indefinite Delivery - Indefinite Quantity (IDIQ) contract resulting from this solicitation.
(End of provision)
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through expiration date of the last option exercised .
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $200,000.00;
(2) Any order for a combination of items in excess of $1,000,000.00; or
(3) A series of orders from the same ordering office within 30 days that together call for dollar amounts exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and
Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after expiration date of the last option exercised .
(End of clause)
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after the latest completion date of any order issued during the effective period of this contract.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days before contract expires.
(End of clause)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 calendar days ; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)
(a) Definitions. As used in this clause--
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts--
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code - assigned to contract number .
(Contractor to sign and date and insert authorized signer's name and title).
(End of clause)
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause--
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .