Attachment 3 General Decision Number FL 117 Building.docx
DOCX document 17 KB Posted
- Attached to
- MacDill AFB Flooring IDIQ Solicitation
- Solicitation number
- FA4814-11-R-0006
About this file
Attachment 3 Wage Determination FL117 Construction
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Flooring Bid Schedule rev 2.xlsx | XLSX spreadsheet | |
| Attachment 1 Flooring Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 6 Green procurement.doc | DOC document | |
| Attachment 8 Seed Project RFP.docx | DOCX document | |
| Attachment 4 Climatic Data Summary.doc | DOC document | |
| Attachment 5 Financial Info.docx | DOCX document | |
| Attachment 1 Flooring Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2 SOW Flooring IDIQ MacDill AFB.docx | DOCX document | |
| Attachment 7 MacDill AFB Contractor Security.docx | DOCX document | |
| FA4814-11-R-0006 MacDill AFB Flooring IDIQ Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: FL100117 10/08/2010 FL117
Superseded General Decision Number: FL20080117
State: Florida
Construction Type: Building
County: Hillsborough County in Florida.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 04/09/2010 3 05/21/2010 4 07/23/2010 5 10/08/2010
CARP1000-002 07/01/2008
Rates Fringes
MILLWRIGHT.......................$ 26.93 10.49
ELEC0915-002 12/01/2009
Rates Fringes
ELECTRICIAN
All building work other than Industrial Work which includes Telephone, Utility Companies, and Water Treatment Plants and also excludes Educational, Theme Park, Hospital Facilities, and all building work under $200,000 or less............$ 22.07 34%+$0.22 Educational, Theme Park, Hospital Facilities, and all building work under $200,000 or less, excluding Telephone, Utility Companies and Water Treatment plants......$ 19.69 34%+$0.22
* ENGI0925-003 07/01/2010
Rates Fringes
OPERATOR: Crane Crawler Cranes; Truck Cranes; Pile Driver Cranes; Rough Terrain Cranes; and Any Crane not otherwise described below...$ 27.91 10.59 Hydraulic Cranes Rated 100 Tons or Above but Less Than 250 Tons; and Lattice Boom Cranes Less Than 150 Tons if not described below.$ 28.91 10.59 Lattice Boom Cranes Rated at 150 Tons or Above;
Friction Cranes of Any Size; Mobile Tower Cranes or Luffing Boom Cranes of Any Size; Electric Tower Cranes; Hydraulic Cranes Rated at 250 Tons or Above; and Any Crane Equipped with 300 Foot or More of Any Boom Combination.................$ 29.91 10.59 OPERATOR: Mechanic..............$ 27.91 10.59 OPERATOR: Oiler.................$ 21.38 10.59 OPERATOR: Boom Truck.............$ 27.91 10.59
IRON0397-001 07/01/2010
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 26.67 11.16
PAIN0088-002 07/01/2008
Rates Fringes
PAINTER: Spray Only.............$ 16.00 6.85
PAIN1010-003 07/01/2006
Rates Fringes
GLAZIER..........................$ 20.00 6.65
PLUM0123-001 05/01/2010
Rates Fringes
PIPEFITTER (HVAC Pipe Installation Only)...............$ 23.65 10.55
SHEE0015-002 07/01/2009
Rates Fringes
SHEETMETAL WORKER (HVAC Duct Installation Only)...............$ 21.52 12.49
* SUFL2009-014 05/22/2009
Rates Fringes
ACOUSTICAL CEILING MECHANIC......$ 13.00 0.00
BRICKLAYER.......................$ 18.00 0.00
CABINET INSTALLER................$ 17.75 0.00
CARPENTER, Includes Form Work (Excludes Acoustical Ceiling Installation, Cabinet Installation, and Drywall Hanging).........................$ 17.23 4.23
CEMENT MASON/CONCRETE FINISHER...$ 13.76 0.00
DRYWALL FINISHER/TAPER...........$ 13.00 0.00
DRYWALL HANGER...................$ 14.00 0.00
FENCE ERECTOR....................$ 7.25 0.19
INSULATOR - PIPE & PIPEWRAPPER...$ 13.13 3.03
LABORER: Asphalt Shoveler.......$ 7.88 0.00
LABORER: Common or General......$ 12.23 2.42
LABORER: Concrete Saw...........$ 12.63 0.00
LABORER: Mason Tender - Brick...$ 15.12 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 12.83 1.90
LABORER: Pipelayer..............$ 12.31 1.19
LABORER: Roof Tearoff...........$ 8.44 0.00
LABORER: Landscape and Irrigation.......................$ 12.00 0.00
OPERATOR: Blade/Grader, Including Finishing..............$ 13.73 0.00
OPERATOR: Asphalt Spreader......$ 11.41 0.00
OPERATOR: Backhoe/Excavator.....$ 11.00 0.00
OPERATOR: Bulldozer.............$ 15.01 0.00
OPERATOR: Distributor...........$ 12.37 0.00
OPERATOR: Forklift..............$ 14.00 0.00
OPERATOR: Loader................$ 13.80 1.79
OPERATOR: Paver.................$ 11.69 0.00
OPERATOR: Pump..................$ 19.00 0.00
OPERATOR: Roller................$ 10.68 0.00
OPERATOR: Screed................$ 11.34 0.00
OPERATOR: Tractor...............$ 9.91 0.00
OPERATOR: Trencher..............$ 11.75 0.00
PAINTER, Including Brush and Roller...........................$ 15.00 0.00
PIPEFITTER (Excluding HVAC Pipe Installation)...............$ 17.83 0.00
PLUMBER (Excluding HVAC Pipe Installation)....................$ 14.39 2.16
ROOFER (Metal Roofs Only)........$ 14.26 0.59
ROOFER, Including Built Up, Hot Tar, Modified Bitumen, Shake & Shingle, Single Ply and Slate & Tile (Excluding Metal Roof)......................$ 13.68 0.00
SHEETMETAL WORKER (Excluding HVAC Duct Installation)..........$ 18.79 3.21
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.75 4.90
TILE SETTER......................$ 15.63 0.00
TRUCK DRIVER: Dump Truck........$ 10.00 0.00
TRUCK DRIVER: Lowboy Truck......$ 12.09 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Attachment 3
File details come from the government source that posted it. Updated .