Attachment 1 Specifications 16 Jan 09.doc

DOC document 234 KB Posted

Attached to
Maintain Maintenance Bay/Hangar Flooring at Seymour Johnson AFB, NC.
Solicitation number
FA4809-09-R-0008
Issued by

About this file

Attachment 1 Specifications Project No. VKAG 09-1301 dated 16 Jan 09

View the file

Other files

File Type Posted
Site Visit Minutes-Signed —
Attachment 7 1st TO Drawing Sh 2 of 2 VKAG 09-1070 A-1.pdf PDF
Attachment 7 1st TO Statement of Work.docx DOCX document
Attachment 7 1st TO Drawing Sh 1 of 2 VKAG 09-1070 G-1.pdf PDF
Amendment 02.doc DOC document
Attachment 7 1st TO Memo to All Offerors.doc DOC document
Attachment 6 PP Questionairre.doc DOC document
Revised 9 Apr 09 Solicitation.doc DOC document
Amendment 01 dtd 9 Apr 09.doc DOC document
Attachment 7 1st TO Drawing Sh 1 of 2 VKAG 05-1005 G-1.pdf PDF
Attachment 6 PP Questionairre.doc DOC document
Attachment 7 1st TO Memo to all Offerors.pdf PDF
Attachment 5 VKAG 09-1301 G-1.pdf PDF
Attachment 7 1st TO Offer Schedule.doc DOC document
Attachment 2 Ktr Respon.doc DOC document
Cover Sheet and Instructions .doc DOC document
Attachment 3 Wage Determination.doc DOC document
Attachment 7 1st TO Drawing Sh 2 of 2 VKAG 05-1005 A-1.pdf PDF
FA4809-09-R-0008.doc DOC document
Attachment 4 AF_66.xls XLS spreadsheet
Set-Aside Determination.doc DOC document
Response to Sources Sought Synopsis.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA4809-09-R-0008

Attachment 1, pg. 1 of 22

Solicitation No. FA4809-09-R-0008

Attachment 1, Pg. 14 of 22

SEYMOUR JOHNSON

AIR FORCE BASE

NORTH CAROLINA

Specifications for

DATE: 16 Jan 09

PROJECT NO: VKAG 09-1301

PROJECT TITLE: MAINTAIN MAINTENANCE BAY/HANGAR

FLOORS IDIQ

PROJECT ENGINEER: Lt James Rozzoni

VKAG 09-1301

MAINTAIN MAINTENANCE BAY/HANGAR FLOORS IDIQ

TABLE OF CONTENTS

SECTION

PAGES

01000

GENERAL

3-7 01560

ENVIRONMENTAL PROTECTION

8-15 09702

REFLECTIVE CHEMICALLY RESISTANT

16-22

URETHANE (CRU) FLOOR COATING

SECTION 01000

GENERAL

1. SCOPE OF WORK: The work covered by this specification consists of furnishing all plant, labor, equipment and material, and performing all work in connection with VKAG 09-1301, MAINTAIN MAINTENANCE BAY/HANGAR FLOORS IDIQ, in strict accordance with these specifications and drawings and subject to the terms and conditions of this contract.

2. LOCATION: The work is to be accomplished at Seymour Johnson Air Force Base, Goldsboro, North Carolina. This base is accessible by public highway.

3. WORKWEEK: The contractor shall observe the same regular workweek being observed by the Seymour Johnson AFB Civil Engineering shop forces, which is 7:30 a.m. to 4:30 p.m., Monday through Friday, with Federal holidays excluded. Any deviation from this schedule will require 72 hours advance notice and approval of the Contracting Officer.

4. PRINCIPLE FEATURES: The work covered by this contract includes, but is not limited to the following:

4.1 Remove and dispose of existing floor coatings on hangar and/or maintenance bay floors, and prepare surface to receive new coating. Any damage to the concrete surface and/or joints during stripping shall be repaired by the Contractor at no expense to the government. Damage is defined as spalling or cracking, and is not intended to include shot blast marks or overlap lines. Some Hangar Floors may contain metal shake. Water based materials shall not be used to prep these floors. Existing coatings/markings may contain Lead Based Paint and shall be removed accordingly (see paragraph 10).

4.1.1 Portable equipment and materials in the hangar and/or maintenance bay shall be relocated by government personnel prior to the contractor beginning work. The government requires a start of work notice a minimum of ten (10) business days before work will commence. Contractor shall coordinate with Contracting Officer’s representative to schedule relocation of equipment. Existing air handling units, interior fencing, and other permanently installed equipment will remain at floor level. Contractor shall protect intakes/drains/vents and the like from paint, dust, debris, and coating fumes during application.

4.2 Apply a chemical resistant urethane (CRU) finish system to the floor. Work includes marking lines, text, signs, and other markings as indicated in each task order’s specifications or plans. The standard color for CRU coating shall be light gray semi-gloss or white semi-gloss unless specifically stated differently in individual task order specifications/plans.

4.3 After the CRU coating has been applied, the contractor shall apply lines, signs, text, etc where indicated. The material shall be of the quality as the base CRU, but a higher gloss version to contrast the floor. Lines shown on each task order's plans are for reference only – exact location of the lines shall be field verified by the Contractor.

4.4 Restricted areas are defined by a 6” red stripe. Breaks in this stripe are considered Entry Control Points. The contractor shall paint the letters “ECP” (Entry Control Point) at all of the entry points on each hangar floor as existing and shown on drawings. “Restricted Area” signs shall be painted adjacent to these entry points. Each sign shall be approximately 18” wide and 18” high and face outward so as to be read from outside the restricted area. All other miscellaneous text shall be of a color and size determined in each specific task order. Locations of signs and text will be provided with each task order. Sign diagrams are provided in paragraph 15.

5. HAUL ROUTES: The Contractor shall use the haul routes indicated on individual task order plans.

6. DISPOSITION OF NONSALVABLE MATERIALS: All non-salvable, unusable and waste material generated by any work under this contract shall be handled, transported, stored, and disposed of off base, by the Contractor, in accordance with all applicable federal, state, and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.

7. SUBMITTALS REQUIRED: Required submittals are listed on AF Form 66.

8. SAFETY: All safety requirements of the U.S. Army Corps of Engineers Safety Manual 385-1-1 and these specifications will be strictly adhered to as related to all work covered under these specifications. If any conflict arises between the USCOE safety requirements and the manufacturer’s safety requirements, the more stringent shall apply.

9. MATERIALS CONTAINING ASBESTOS: In the event the Contractor discovers materials suspected of containing asbestos that is not identified to be removed in the individual task order plans and specifications, the Contractor shall notify the Contracting Officer. The Contractor’s work shall proceed unless the materials suspected of containing asbestos are damaged or disturbed. Any suspected materials damaged or disturbed by the Contractor without permission from the Contracting Officer shall be removed by the Contractor at his expense in accordance with all applicable Federal, State, and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.

10. LEAD BASED PAINT (LBP) REMOVAL: Existing paint will be tested for lead by the government. Each task order will include information on LBP removal requirements. If paint contains lead in excess of 0.5% the contractor shall treat removed paint as hazardous waste. This type of removal shall be paid for by the separate contract line item for Lead Based Paint Removal. If paint contains lead base paint under 0.5% the removal will be classified as standard floor coating removal and preparation. Lead Based and Lead Containing Paint removal and disposal must be in accordance with all applicable Federal, State, and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.

11. LABELING OF STORAGE DRUMS: All 55 gallon or larger drums brought on base for use under this contract and containing new material or used for storage of waste materials or hazardous waste must be labeled with a Department of Transportation (DOT) Proper Shipping Name, DOT Hazardous Identification Number, the Contractor’s name, a Contractor representative, and the Contractor’s telephone number. Label lettering should have a minimum height of one half inch painted in white paint or other color that is in contrast with the color of the drum. The label should be sufficiently durable to equal or exceed the life (including storage and disposal) of the drum.

12. CONTRACTOR STORAGE TRAILER(S) AND BUILDING(S): The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the Contractor can be reached. The trailer(s) and building(s) shall be complete with gates and/or doors, which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean and clear of all trash. This includes the mowing of grass during the growing season. The lawn mower shall be supplied by the Contractor.

12.1 The Contractor will be given a lot in the Contractor Storage Area for the life of the contract, if desired.

13. CONSTRAINTS:

13.1 Construction sites may be located within a secure area and all personnel will require escorts for entry. Contractor personnel shall display proper identification at all times. All vehicles operated by the contractor or subcontractors shall have visible identification showing name of represented company. The Contractor shall obtain Flight Line Driver's Passes for all personnel operating motor vehicles used for this project with Base Operations located in Bldg 4507.

13.2 A pre-construction meeting may be held prior to execution of each task order as determined by the Contracting Officer. A technically knowledgeable person shall represent the contractor at these meetings.

14. PERFORMANCE PERIOD:

14.1 After award of the contract, the contractor shall have thirty (30) days for submittal period. No on-site work shall be performed. All submittals must be submitted and approved prior to start of work.

14.2 Task orders will be issued on an as-needed basis. Performance period shall be negotiated for each task order.

14.3 The Contractor shall complete an entire hangar bay and/or maintenance bay to include re-striping before beginning another. Any deviation from this schedule must be approved by the Contracting Officer.

15. DIAGRAMS:

15.1 Hangar Door Striping.

15.2 Restricted Area Sign. Letters and border are black and red as shown. Background color shall match the rest of the floor on which it is applied.

15.3 Miscellaneous Text. Any text not already specified shall be defined per individual task order and quantified by overall square footage that the text occupies.

END OF SECTION 01000

SECTION 01560

ENVIRONMENTAL PROTECTION

1.

DEFINITIONS:

1.1 Sediment: Soil and other debris that has been eroded and transported by runoff water.

1.2 Solid Waste: Rubbish, debris, garbage, and other discarded solid materials resulting from industrial, commercial, and agricultural operations, and from community activities.

1.3 Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

1.4 Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.

1.5 Chemical Wastes: Includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

1.6 Water

1.6.1 Sanitary Water: A pipe or conduit which carries sewage and to which stormwaters, surface waters and groundwaters are not intentionally admitted

1.6.2 Storm Water: A pipe or conduit which carries storm or surface waters and drainage, but excludes sewage and industrial wastes.

1.6.3.

Sewage: Wastes characterized as domestic sanitary sewage.

1.6.4 Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

1.7

POL: Petroleum, Oils, and Lubricants (regulated by the SJAFB SPCC plan)

1.7.1 Oily Waste: Includes petroleum products and bituminous materials.

1.7.2 Oil: Any kind of oil in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil.

1.7.3 Spill Prevention Control, and Countermeasures Plan (SPCC): Guidance for preventing spills of POL products to navigable waters. The plan includes controls countermeasures that are required for activities performed on the installation.

1.8 Hazardous Material (HAZMAT): Includes all items (including medical supply items, but excluding drugs in their finished form and pharmaceuticals in individually-issued items) covered under Emergency Planning & Community Right-To-Know Act (or other host nation, federal, state, or local) tracking requirement, the OSHA HAZCOM Standard, and all Class I and Class II Ozone Depleting Substances.

2.

ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain during the life of the contract, environmental protection as defined herein. Provide environmental protection measures as required to control pollution that develops during normal construction practice. Provide also environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with all federal, state, and local regulations pertaining to environmental requirements. Develop proposals for an environmental protection plan for the project and, prior to the commencement of the work, meet with the Contracting Officer and discuss the proposed environmental protection plan. The meeting shall develop mutual understanding relative to details of environmental protection, including measures for protecting natural resources, required reports, and measures to be taken should the Contractor fail to provide adequate protection in an adequate and timely manner. Perform a preconstruction survey of the project site and take photographs as necessary to enhance the survey.

3.

ENVIRONMENTAL MANAGEMENT SYSTEM – Seymour Johnson AFB has an Environmental Management System (EMS) in place. The Contractor shall support and comply with the EMS operational and administrative requirements. The contractor and all associated employees shall maintain an awareness of potential environmental impacts associated with the duties they are performing. Actions must be taken to minimize those environmental impacts during any service, design and/or construction activity. The Contractor and all appropriate personnel shall complete Environmental Management System awareness training and ensure all employees working on SJAFB are knowledgeable of EMS policies and procedures. An Executive Summary of Seymour Johnson’s EMS shall be provided to the contractor. EMS awareness training is available to contract personnel at the following Air Force sponsored training site: http://esohtn.com. The contractor shall provide written certification of training completion to the Contracting Officer within 30 days of contract start up.

4.

PROTECTION OF NATURAL RESOURCES: The natural resources within the project boundaries and outside the limits of permanent work performed under this contract shall be preserved in their existing condition or restored to an equivalent or improved condition upon completion of the work.

4.1 Land Resources: Except in areas indicated to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without special permission from the Contracting Officer. Do not fasten or attach ropes, cables, or guys to any existing nearby trees for anchorages unless specifically authorized. Where such special emergency use is authorized, the Contractor shall be responsible for any resultant damage.

4.1.1 Protection: Protect existing trees which are to remain and which may be injured, bruised, defaced, or other wise damaged by construction operations.

4.1.2 Repair or Restoration: Repair or restore to their original condition all trees or other landscape features scarred or damaged by the equipment or operations. Obtain approval of the repair or restoration from the Contracting Officer prior to its initiation.

4.1.3 Temporary Construction: Obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and all other vestiges of construction. Temporary roads, parking areas, and similar temporary use areas shall be graded in conformance with surrounding areas, tilled, and seeded. Include topsoil of nutriment during the seeding operation as necessary to reestablish a suitable stand of grass.

4.2 Water Resources: Perform all work in such a manner than any adverse environmental impact on water resources is reduced to a level acceptable to the Contracting Officer.

4.2.1 POL Products: Take special measures to prevent oils or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Surround all temporary fuel oil, petroleum, or liquid chemical storage tanks greater than or equal to 55 gallons with secondary containment of sufficient size and strength to contain the contents of the tanks and freeboard precipitation (4” per 24 hour period) in the event of content leakage of spillage. Contractors are required to adhere to the SJAFB Spill Prevention, Control, and Countermeasures plan.

4.2.2 Petroleum stained areas: At the completion of this project, the contractor shall confirm that no petroleum stained soil is present in or around the area affected by the project. This includes leaks or drips from heavy equipment used during the project. In the event petroleum stained soil is identified, the contractor is responsible for complete removal and disposal of such soil, and the replacement with non-contaminated soil.

4.3 Fish and Wildlife Resources: During the performance of the work take such steps as required to prevent interference or disturbance to fish and wildlife. Do not alter water flows or otherwise significantly disturb native habitat adjacent to the project area which are critical to fish and wildlife except as may be indicated or specified.

5.

EROSION AND SEDIMENT CONTROL MEASURES: If the work associated with this project disturbs more than one acre of land, the contractor shall follow all requirements set forth in North Carolina General Statute 143-215.1, Permit No. NCG010000. This includes but is not limited to the design/application of an erosion and sedimentation control plan, paying the associated fee, the proper control of the Certificate of Approval (granted by NCDENR), implementation of the plan, and all the inspection type requirements during the actual construction period along with the proper documentation. These required documents shall be provided and/or made available to appropriate government personnel upon request. At least one copy of each NOI, NPDES Permit, SWPPP PLAN, Certificate of Approval, and Certificate of Termination Document shall be given to the 4 CES/CEV Office.

5.1 If the work associated with this project disturbs less than one acre of land, the contractor shall provide properly and adequately designed/implemented erosion and sedimentation control practices as to not contribute pollution to the base’s regulated storm water discharges. This includes but is not limited to protection of storm drains, ditches, or other waters of the State from sedimentation runoff; and controlling disposal of discarded building materials, concrete truck washout, chemicals, litter, and sanitary wastes at the construction sites that may cause adverse impacts to water quality.

5.1.1 Burn-off: Burn-off of ground cover is not permitted.

5.2 Protection of Erodible Soils: All earthwork brought to final grade shall be immediately finished as indicated or specified. Protect immediate side slopes and backslopes upon completion of rough grading. Plan and conduct all earthwork in such a manner as to minimize the duration of exposure of unprotected soils.

5.3 Temporary Protection of Erodible Soils. Utilize the following methods to prevent erosion and control sedimentation.

5.3.1 Mechanical Retardation and Control of Runoff. Mechanically retard and control the rate of runoff from the construction site. This includes construction of diversion ditches, benches, and berms, to retard and divert runoff to protected drainage courses.

5.3.2 Sediment Basins: Trap sediment in temporary sediment basins. Select basin size to accommodate the runoff of a local 5 year storm. Pump dry and remove accumulated sediment after each storm. Use a paved weir or vertical overflow pipe for overflow. Remove collected sediment from the site. Institute effluent quality monitoring programs as required by state and local environmental agencies.

5.3.3 Vegetation and Mulch: Provide temporary protection on all side and back slopes as soon as rough grading is completed or sufficient soil is exposed to require protection to prevent erosion. Such protection shall be by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding or such combination of these and other methods necessary for effective erosion control.

6.

CONTROL AND DISPOSAL OF SOLID, CHEMICAL, AND SANITARY WASTES: Pick up solid wastes and place in containers which are emptied by the contractor on a regular schedule. The preparation, cooking, and disposing of food are strictly prohibited on the project site. Conduct handling and disposal of wastes to prevent contamination of the site and other areas. On completion, leave areas clean and natural looking. Obliterate signs of temporary construction and activities incidental to construction of the permanent work in place.

6.1 Disposal of Rubbish and Debris: Dispose of rubbish and debris in accordance with the requirements specified herein.

6.1.1 Removal from Government Property: Remove rubbish and debris from Government property and dispose of it in compliance with federal, state, and local requirements.

6.1.2 Chemical Waste: Store chemical waste in corrosion resistant containers labeled to identify type of waste, date filled, and contractor name. Remove containers from the project site, and dispose of chemical waste in accordance with federal, state, and local regulations. Chemical waste has the potential to become hazardous waste. The contractor shall conduct sample analysis sufficient to determine if the waste is a hazardous waste as defined in 40 CFR Part 261. Any waste meeting the definition of hazardous shall be accumulated and manifested in accordance with federal, state, and local regulations and coordinated with the 4 CES/CEAN office. The contractor shall notify the Contracting Officer immediately in the event of any chemical waste spill.

6.1.3 Petroleum Products: Conduct fueling and lubricating of equipment and motor vehicles in a manner that affords the maximum protection against spills and evaporation. Dispose of lubricants to be discarded and excess oil in accordance with approved procedures meeting federal, state, and local regulations.

7.

AIR EMISSION SOURCES: Any new construction which includes air emission sources such as natural gas, propane, or liquid fuel fired heaters, industrial water heaters, boilers, emergency generators, painting operations, solvent cleaning, dust collection systems, abrasive cleaning systems, fuel storage or dispensing units, or any other air emission or combustion source, the Contractor shall coordinate with 4 CES/CEAN, via project Government Inspector, on State of North Carolina permitting requirements. Permitting requirements and timelines, and any associated delays associated with obtaining such, shall be considered in all design and construction schedules.

7.1 DUST CONTROL: Keep dust down at all times, including non-working hours, weekends, and holidays. Sprinkle or treat, with dust suppressors, the soil at the site, haul roads, and other areas disturbed by operations. No dry power brooming is permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air Blowing is permitted only for cleaning non-particulate debris, such as steel reinforcing bars. No sandblasting is permitted unless dust there from is confined. Only wet cutting of concrete blocks, concrete, and asphalt is permitted. No unnecessary shaking of bags is permitted where bagged cement, concrete mortar and plaster is used.

8. NOISE: When available, make the maximum use of “low-noise-emission products” as certified by EPA. No blasting or use of explosives is permitted.

9.

SOLID WASTE DIVERSION AND RECYCLING

All solid waste generated as a result of project activities are the responsibility of the Contractor. The Contractor shall provide necessary dumpsters, roll-offs, containers, etc. for proper storage, removal, and ultimate disposal the solid waste. The Contractor shall not use base dumpsters, roll-offs, or containers for the disposal of solid waste. Solid waste debris, including construction & demolition debris shall be recycled and/or diverted away from landfill disposal to the extent practical for the project.

A. Construction debris that cannot be recycled: Demolition and/or construction materials that cannot be reused, recycled, or otherwise diverted must be segregated from other solid waste and disposed at an approved C&D landfill. The Wayne County C&D landfill is adjacent to the Municipal Solid Waste Landfill. The Contractor shall maintain records of construction debris diverted and disposed.

B. Recyclables: The contractor shall remove recyclables from the solid waste stream to the extent practicable. Disposing of recyclables in a municipal solid waste landfill (MSWLF) is not acceptable and may constitute violation of the contract. Local county ordinance prohibits the disposal of solid waste with greater than 10% recyclables. In the event the county sites the Contractor for excessive recyclables within a load, the Contractor is solely responsible for fines and/or increased tipping fees. Recyclables shall be taken to off-base facilities for recycling with all profit from those materials being those of the Contractor. The Contractor shall maintain records (by weight) of all materials recycled and disposed.

Use of demolition debris (rubble) as fill material is considered recycling. The contractor shall report reuse of such material in the monthly Solid Waste Diversion report (see format below).

The contractor will report, monthly, no later than the last day of the following month, the total weight of solid waste and construction/demolition waste he disposed, and percentage diverted through recycling. The report will be made in two copies. The following format will be used:

Solid Waste Report

Project #:

Contract #:

Facility #:

Contractor :

Contractor Point of Contact:

Contractor Phone #:

4 CES Construction Inspector:

Report Period: dd/mm/yyyy to dd/mm/yyyy

LBS
RECEIVING FACILITY

A. Total Amount of Solid Waste Taken to Municipal Solid Waste Landfill

B. Total Amount of C&D Debris Taken to C&D Landfill For Disposal

C. Total Amount of Recyclables Retained for Consumption by Contractor

D. Total Amount of Recyclables Taken to Wayne County Recycling Center

1. Cardboard

2. Scrap Metal

3. Other

E. Total Amount of C&D/Recyclables Taken/Sold to Other Recycling Points or

Reused On-Site

1. Cardboard

2. Scrap Metal

3. Other

4. Fill Material

F. Total Solid Waste Generated (A+B+C+D+E) (includes all material generated from the project)

G. % Diverted from Municipal Solid Waste Landfill ((C+D+E)/F) *100

This report must be submitted to the 4 CES Construction Inspector monthly.

4CES/CEPM: 1 copy; 4CES/CEAN 1 copy as distributed by Construction Inspector 10.

HAZARDOUS MaterialS/HAZARDOUS WASTES. The Contractor shall obtain approval from the Hazardous Material Management Program (HMMP) team prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products for this contract that require an MSDS. The Contractor shall identify these materials on a Contractor Hazardous Material Authorization, Inventory, & Usage Form (AF Form 3952 – Contractor Equivalent). The Contractor shall provide this inventory list and one copy of the MSDS for each item to HAZMART for review and HMMP approval prior to any chemicals being brought onto Seymour Johnson AFB.

This Inventory & Usage Form will also be used by the Contractor to report hazardous material usage. At project completion, the contractor shall submit a final report (AF Form 3952 – Contractor Equivalent) to the Contracting Officer detailing overall project hazardous material usage.

For projects extending over 6 months in duration, the inventory (AF Form 3952 – Contractor Equivalent) shall be used to provide monthly usage reports to the Contracting Officer and a final report at project completion. The Contractor shall maintain one copy of the MSDS for each hazardous material line item used within the work center.

Contractor Hazardous Material Authorization, Inventory, and Usage Form (AF Form 3952 – Contractor Equivalent)

1. Prime Contractor/Organization:
2. PriMe Cont/POC

3. Phone

4. Fax

5. Date

2.
6. Prime CONT EMAIL
7. CONTRACT NUMBER
8. EXPECTED START DATE

9. EXPECTED END DATE

10. CONTRACTOR SIGNATURE

11. WORKPLACE/BLDG

12. SUB-CONTRACTOR

13. DELIVERY ORDER

14. CONTRACT ADMINISTRATOR

15. CONTRACTING ADMINISTRATOR SIGNATURE

16. PHONE

17. FAX

18. DATE

19. Government Inspector/OPR

20. SIGNATURE

21. PHONE

22. FAX

23. DATE

24. PROJECT/TASK DESCRIPTION

25. Usage Reporting Schedule

FORMCHECKBOX

Contract Term FORMCHECKBOX Monthly ______________(month reported)

Product Name/Part Number
Manufacturer
Storage Location While On-base2
Physical Form (S,L,G)
Amount & Unit of Issue3
Container Type
Max Amount Onsite at any Time 4
Anticipated Amount Used for Project
Actual Amount Used During

Period5 Intended Use

FOOTNOTES: 1. This form is used for initial notification of hazardous materials intended for use on associated project and to report subsequent actual usage. Include all materials, which contain an EHS, TRI, CERCLA hazardous substance, toxic chemical, generates a hazardous waste after use, and/or requires a Material Safety Data Sheet.
2. Will temporary storage be established or kept in vehicles and taken off-base daily.

3. Identify amount in container & the units item is measured in, i.e. gallon, ounces, lbs, etc.

4. Identify maximum amount present (stored and used) at any one time on SJAFB.

5. Report actual quantities used. Quantities should reflect the reporting schedule identified in line 25.

SECTION 09702

REFLECTIVE CHEMICALLY RESISTANT URETHANE (CRU) FLOOR COATING

1. GENERAL: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

1.1 American Society for Testing and Materials (ASTM):

ASTM D 1308

Effect of Household Chemicals on Clear and Pigmented Organic Finishes

ASTM D 1640

Drying, Curing, or Film Formation of Organic Coatings at Room Temp.

ASTM D 2370

Tensile Properties of Organic Coatings

ASTM D 2697

Method for Volume of Nonvolatile Matter in Clear or Pigmented Coatings

ASTM D 3363

Film hardness by pencil test

ASTM D 4060

Abrasion Resistance of Organic Coatings by the Taber Abraser

ASTM E 97-7745

O-Deg. Directional Reflectance Factor of Opaque Specimens by Board-Band Filter Reflectometry

1.2 American National Standards Institute (ANSI)

ANSI B74-12

Specifications for the Size of Abrasive Grains, Grinding Wheels, Polishing and General Industrial Uses

ANSI Z87-1

Practice for Occupational and Educational Eye and Face Protection

1.3 U. S. Department of Labor Occupational Safety and Health Administration (OSHA)

OSHA 29 CFR

Occupational Safety and Health Standards 1910.134

1.4 Military Specifications (MIL)

MIL-H 8328b

Hydraulic Fluid, Fire Resistance, Synthetic Hydrocarbon Base, Aircraft, NATO Code Number H-537

1.5 Federal Specification

TT-S-00227E

Glazing Compound: Elastomeric type, Two Compound Caulking, Sealing and Glazing on Buildings and (for other structures)

2. SUBMITTALS: The following submittals shall be submitted as listed (see also AF Form 66).

2.1 Manufacturer’s brochures and product data, certifying compliance with these specifications for materials to be used on this project. Data shall also include the corresponding drying times and solids content of the primer, and applications instruction for the urethane coating system. No water-based materials shall be used if metal flake is in the concrete. A statement to that effect from the manufacturer of the reflective coating systems shall be included.

2.2 Complete surface preparation and application instructions prepared by the manufacturer of the reflective coating system. Also include care and maintenance instructions (see para 11.4).

2.3 The coating applicator shall be certified by the manufacturer of the floor coating product and be experienced and competent in the application of their systems.

2.3.1 More specifically, relevancy to this procurement would involve work such as: furnishing all plant, labor, equipment and material for removal and disposal of existing floor coatings on hangar and/or maintenance bay floors and preparation of surfaces to receive new coating, abatement of lead based paint, and applying a chemical-resistant urethane (CRU) finish system to the floor, marking lines, text, signs, and other markings, applied by an experienced applicator. Contractor work experience would include an overall total for “like jobs” at least 100,000 square feet. References will be requested and a contact will be required before the award.

2.3.2 The Contractor shall additionally submit evidence of successful completion of the same or similar work, indicating the specific parameters of the work, a complete description of the Floor Surfacing Urethane System installed, location of the work and the address and telephone number of a current representative of the facility where the Contractor's work was performed. References of previous work for Federal, State or Local Government entities are preferred over contracted work with commercial or private entities.

2.3.3 The Government reserves the right to contact any or all such referenced locations for verification of the work performed, and to discuss with informed parties the quality of the Contractor's previously installed work.

2.3.4 The Government additionally reserves the right to make, or send a duly appointed representative to make, a site visit, with the Owner's permission, to inspect and evaluate the Contractor's previously installed work.

2.4 Certification stating the contractor is qualified to abate lead based paint.

2.5 The Contractor shall warranty the applied coating system against film defects, such as blisters, bubbles, and craters and against peeling or loss of adhesion for a period of two years. The Contractor shall warranty the coating materials to be free of formulation or manufacturing defects.

3. DELIVERY AND STORAGE OF MATERIALS: The Contractor may store materials in the Contractor’s open storage area. The Contractor shall provide his own storage trailer and is responsible for keeping the trailer environmentally conducive to the materials. Materials shall be delivered to the job site in factory sealed containers in sufficient quantity to allow continuity of work and shall be protected from the weather as necessary. The containers shall be clearly labeled with the manufacturer’s name, product identifications, date of manufacture, shelf expiration date, and lot number, and they shall be stored so as to permit access for inspection and handling.

4. COORDINATION OF OPERATIONS: All of the required coordination during the execution of the contract will be with the contracting officer or contracting officer’s representative. The maintenance bay areas of the building under contract will be turned over to the Contractor one at a time. Any Contractor equipment or material temporarily stored in that area will be moved by Contractor’s personnel.

5. SAFETY PROVISIONS: The Contractor shall provide health and fire safety precautions for his own personnel and shall conduct his operations so that no base personnel are exposed to hazardous amounts of solvent vapors. During coating application, the following shall be required unless in conflict with a manufacturer’s recommendation or other requirements of a recognized legal authority, in which case those requirements take precedence.

5.1 Ventilation: Proper ventilation of the work area shall be maintained at all times to prevent the accumulation of hazardous fumes.

5.2 Protection Against Vapors: Wear canister type or fresh air supply masks when applying coatings in the confined location, when spraying coatings, or when handling hazardous liquid materials. Respiratory protective devices shall be as recommended by OSHA 1910-134 and approved by the Mining Enforcement and Safety Administration or be acceptable to the U.S. department of Labor for the specific contaminant to which a person is exposed. Instruct personnel required to use respiratory protective devices in their use and provide adequate supply of replacement cartridges. Maintain such equipment and inspect regularly. The Contractor shall notify the user to keep area clear of traffic prior to work start and shall provide warning signs for all doorways and openings.

5.3 Protect Against Liquids: When spraying coatings or when handling hazardous liquid materials, wear protective clothing and gloves and use eye and face protections. Face protective equipment shall meet the requirements of ANSI Z87.1.

5.4 Preparation for and application of the CRU Flooring shall be safe for all government personnel working in adjacent areas (offices and other maintenance areas in the same facility) so that full production can be maintained without interruption, evacuation, or the use of safety equipment.

6. PROTECTION AND CLEANUP: The contractor shall protect adjacent areas from his surface preparation and coating materials and shall protect his work by barricades and signs. Post and enforce WORK AREA // NO ENTRY // WET FLOOR or other applicable and suitable warning signs or barriers during all floor preparation procedures and until flooring has cured and passed inspection by the Contracting Officer. After completion of the work, the Contractor shall remove all such protective devices, including masking tape, etc., and all debris generated from this operation.

6.1 Masking of Adjacent Areas: The Contractor shall provide and install masking tape or other protective materials for adjacent sites, devices or items that are not to be coated. The Contractor will provide proper masking materials, masking tape, polyethylene sheet, etc., as required, to protect these areas from splatter, foot tracking, and spills. Some areas that should not be painted include, but are not necessarily limited to, static grounding points and drainage gratings, etc.

6.2 The Contractor shall remove from the premises all liquid waste material from cleaning operations that cannot be safely flushed into the sewer systems and all coatings or solvent residues and containers.

7. WASTE DISPOSAL: All material and waste products shall be disposed of off-base by the Contractor in accordance with applicable local, state, and national regulations, statues, executive orders or codes. The Contractor shall be held responsible for any chemicals improperly disposed of and will be held liable for all costs associated with clean-up of chemicals.

8. ENVIRONMENTAL CONDITIONS: Coating applications shall be started in conditions according to manufacturer’s recommendations. If the applications must be performed under other environmental conditions, a statement from the coating manufacturer shall be submitted with certification that these environmental conditions are acceptable.

9. PRODUCTS:

9.1 Coating System: The reflective CRU floor coating system shall consist of an epoxy-urethane primer, a two component aliphatic urethane topcoat that incorporates grit to provide slip resistance, and one additional urethane topcoat. The primer shall be a different tint than the coating. The system components shall be applied in the quantities recommended by the manufacturer and in the sequence further described in Para 11. The complete reflective coating system, including all coatings shall be supplied by the same manufacturer. Only the specified type of grit shall be used; no sand or other silica grit shall be used.

9.1.1 Coating Properties: The top coats and intermediate coats shall be aliphatic polyester polyurethane. Coating system shall be applied at a thickness so it does not show any concrete damage or overlap marks. They shall have properties that meet the following requirements.

Property

Value

Test Method

Solids Content % by Volume (Min.) 53

ASTM D 2697

Dry-to-Touch time, Hr.

(Max.) 4

ASTM D 1640

Dry-To-Re-Coat time, Hr

(Max.) 8

ASTM D 1640

Reflectance, %

(Min.) 85

ASTM E 97

Elongation, %

(Min.) 6

ASTM D 2370

Abrasion Resistance:

CS17 Wheel 1,000-gm.

(Mi.) 1600

ASTM D 4060

Load Wear cycles per mil

Chemical Resistance, spot Tested Covered 24-hr Exposure to the Materials Listed; No visual effects and the following changes in pencil hardness unless (Maximum).

Hydraulic Fluid, MIL-H-83292

ASTM D 1308

Skydrol 500B4* (a product of

ASTM D 3363

The Monsanto Company)

9.1.2 CRU Color: The standard color for CRU coating shall be light gray semi-gloss (satin), or white semi-gloss, unless specifically stated differently in individual task order specifications/plans. Line markings, text, and other signs are defined in section 1000, para. 15. Tow lines and restricted area lines shall be of a higher gloss characteristic so as to contrast the rest of the floor, but retain their chemically resistant properties. Submittals are required (see AF Form 66).

9.1.3 Other Materials: All materials required to complete the contract shall be furnished by the Contractor. All coatings, chemicals, and sealants that are used shall be products that are approved by the manufacturer of the reflective coating system.

9.1.3.1 Materials for Surface Preparation: Various chemicals are used in the surface preparation of the concrete prior to the coating application, see Para 10. These include alkaline detergents for cleaning, solvents for oil and grease removal and acids for etching of the surface. These chemicals cannot go down drains and must be vacuumed and hauled off the site.

9.1.3.2 Materials for Sealing of Joints: Joint sealants shall be a solvent resistant polysulfide, polyurethane or epoxy materials and shall conform to TT-S 002227. Joint sealants shall be compatible with existing asphaltic material and must be approved by contracting officer or contracting officer’s representative (see AF Form 66).

9.1.3.3 Grit Material: Use aluminum oxide as recommended by the coating system manufacturer. Grit. Alumina grit (Nos. [36][46][54]) is preferred and must be mechanically broadcast into the wet-applied midcoat.

Note: To obtain even distribution, grit may be applied in any 0.023 square meters (36 square inches) as follows: Grit No. 36 at 250 particles; Grit No. 46 at 500 particles; Grit No. 54 at 750 particles. Grit No. 46 bleached alumina is suitable for a typical aircraft maintenance hangar floor. For a floor that is more slip resistant but will lose grit more easily in rough or even normal usage, Grit No. 36 alumina can be used. Grit No. 56 alumina can be used for a less slip resistant floor, but is easier to clean and maintain.

9.1.3.4 Striping Coatings: Traffic Markings and other Striping coatings shall be CRU coatings or moisture-cured urethane coatings. Traffic marking paints for roads or runways are not acceptable.

9.2 The concrete CRU Floor Surfacing System shall provide resistance to chemical spills no more than 7 days after application, with no effect or a limited adverse effect from exposure to: battery acids, citric or acetic acids, alkaline cleaning solutions, JP4, JP5, JP8, gasoline, aromatic solvents, and miscellaneous chemicals such as chlorine bleach, SAE #20, brake fluid, Skydrol 500B, hydraulic fluid, tire marking/staining, and ethylene glycol.

10. MATERIALS AND METHODS: All materials and methods of CRU applications shall be in strict accordance with the recommendations of the manufacturer of the products used. Complete product data on all products to be used shall be presented to the Contracting Officer or authorized representative to include a material safety data sheet or OSHA, Form 20, on solvents, thinners, etc. (see AF Form 66).

10.1 Surface Preparation: The Contractor shall thoroughly clean all surfaces to be coated before application of the coating system. The Contractor shall be responsible for correcting any damage to the concrete floor during the surface preparation. The surface preparation instructions of the manufacturer of the reflective coating system shall be followed.

10.1.1 Removal of Absorbed Contaminants: The concrete floor surface shall be made free of any curing compound, sealants, and any oil or grease or similar contaminants with solvents and surface active agents assigned to remove these contaminants. The cleaning mixture shall soak for 30 minutes before being dry vacuumed, swept, or removed by another means approved by the Contracting Officer or authorized representative. The procedure shall be repeated as often as necessary. Special attention shall be given to the expansion joints, as indicated below.

10.1.2 Preparation of Expansion Joints: CAUTION: Care shall be taken to avoid applying CRU coating directly over control/expansion joints and crack filler compounds which have not been properly prepared per manufacturer’s recommendations. When working adjacent to, or over an asphaltic expansion joint, and the sealer from the joint continues to contaminate the areas near the joint, the joint shall be removed and the joint sealer shall be replaced with a solvent resistant two-component sealer. Contaminated expansion joints that are not compatible with the CRU coating shall be removed and replaced. Any joint removed and replaced, as approved by the Contracting Officer, will be paid for by the separate contract line item for expansion joint replacement.

10.1.3 Expansion Joint Repairs: Any joints determined to need repair shall be routed out and completely cleaned. The contractor shall install new backer rod and reseal all joints.

10.1.4 Surface Repairs: After the removal of contaminants, any cracks/spalls that are approximately 1/16 inch wide and larger shall be filled with epoxy patching compounds approved by the floor coating manufacturer. This type of repair shall be paid for by the separate contract line item for spall repair. Any cracks/spalls under 1/16 inch wide shall be corrected and considered overall floor preparation. It is the desire to have a final product where the concrete is smooth and free from any floor imperfections.

10.1.5 Cleaning of Floor: The floor shall be swept and free of debris and shall be cleaned with a mechanical scrubber and a heavy duty alkaline detergent. The detergent solution shall soak for 20 minutes before final scrubbing and shall be vacuumed to remove any residue. This process shall be repeated until all floors are clean and approved by the Contracting Officer or authorized representative. All grease, oils, and other contaminants must be removed.

10.1.6 Existing Coating Removal: The present floor coating shall be removed to the specification of an on-site manufacturer’s representative or technician. The contractor shall guarantee that the floor is sufficiently clean to receive the new coating. Clean the entire substrate area of existing coat system materials so that the chosen method of coating removal will provide a floor surface that is sound, dry, free of dust, dirt, grease, paint, oil, and other foreign substances. If mechanical removal of paint is to be utilized, such removal shall not significantly alter the surface texture of the concrete. If the concrete surface texture is changed due to mechanical removal, the surface of the concrete shall be restored to its original surface texture with a compatible material designed for concrete repair. The removal equipment shall be a dry, closed-cycle with residue and abrasive vacuumed up or otherwise recycled. During removal, airborne dust, debris, or other particulate matter shall be fully contained. Equipment shall be suitable for use in sensitive areas where airborne contaminants are not acceptable.

11. COATING SYSTEM APPLICATION: The Contractor shall carefully supply the coating system in accordance with the instructions of the manufacturer of the reflective coating system. Apply the coating over the entire floor surface including joints. The floors must be completely dry and all masking completed to provide a sharp demarcation between coated and un-coated surfaces. Coatings shall be applied under conditions recommended by the manufacturer. The Contractor shall notify the Contracting Officer of any conflicts between manufacturer instructions and the following general instructions before work begins.

11.1 Preliminaries: It shall be ascertained that there will be no interference in the coating operations from other trades, that doors operate properly for adjusting of ventilation and that applicable general instructions have been met. It shall be ascertained that the concrete is sufficiently dry for the primer application which for solvent-based coatings requires a Delmhorst moisture reading of no more than 18% using the probe and scale intended for wood. Water dispersed primers may require less drying. The floor shall be vacuumed or swept as required to provide a clean surface.

11.2 Application of Primer and Top Coats: Two component coatings shall be completely mixed prior to application and any pigmented component shall be mixed separately before the hardener, activator, catalyst, or part is added. No more materials shall be mixed than can be used in a 3-hour period. A 1-minute induction period shall be allowed before the mixing coating is applied. No thinner shall be added unless specified for a first coat. The mixed coating shall be applied with a medium nap roller or by another suitable method. All coats shall be cut fully to edges, around pipes, structural supports, conduits, and other items not to be coated. The manufacturer’s minimum recommended drying times should be observed. If any coat dries more than 24 hours before re-coating, the surface shall be buffed with No. 1 steel wool or with No. 100 sandpaper and shall be vacuumed or swept thoroughly before re-coating. Apply floor-marking striping as shown on drawings.

11.2.1. Primer Application: Apply primer to flooring space at 7.0 mils (175 microns) minimum Dry Film Thickness (DFT)

11.2.2. First Topcoat: Apply a full coat of the urethane topcoat at a spreading rate from 2.5 to 3.2 mils (62.5 to 80 microns ) DFT.

11.2.3. Second Topcoat: Apply a second coat of the urethane topcoat at a spreading rate from 2.5 to…