Atch 03-B1130 Floor Plan (FA480326Q0100).pdf
PDF 2 MB Posted
- Attached to
- B1130 Vindicator System Upgrade - Shaw AFB
- Solicitation number
- FA480326Q0100
About this file
This document consists of architectural floor plans for the Addialter USAF/CENT Headquarters facility across multiple levels. The plans include the 1st Floor, 2nd Floor, and associated mechanical/HVAC systems diagrams.
The floor plans depict the physical layout of the headquarters building with detailed room configurations, access control points, emergency exit routes, secondary access control door locations, and mechanical/duct penetrations marked with colored annotations. Key features identified include the Access Control Door on the 1st Floor, the Secondary Access Control Door on the 2nd Floor, elevator locations, stairwell positioning, and various utility infrastructure elements shown through mechanical schematic overlays. The plans also indicate vent and duct perimeter details and structural dimensions. These architectural drawings appear to serve as reference documentation for understanding the facility's physical configuration, security access points, emergency egress routes, and mechanical systems distribution throughout the building. The document does not contain solicitation information, performance requirements, pricing terms, contract vehicles, or agency procurement details.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .