This document is a Questions and Answers (Q&A) attachment for Solicitation FA480325R0022 for Georgetown Mini Mute Emitters, containing six specific questions and answers related to the project. The questions address utility providers, permitting authority, modular office requirements, site-specific infrastructure details, and electrical infrastructure. Key details include confirmation that the contractor must install a new modular office, install a 36" culvert at site #1 across a drainage ditch, and establish a new electrical feeder from the nearest utility connection point at site #2. The document provides contact information for the local utility provider (Santee) and the building official (Steven Elliott), and directs potential bidders to consult with the local MS4 regarding storm water protection plan requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation FA480325R0022
Georgetown Mini Mute Emitters
QUESTION 1: Please provide the utility providers for electric, water and sewer.
ANSWER:
Mailing address: P.O. Box 548, Kingstree, SC 29556 Street address: 424 Sumter Hwy, Kingstree, SC 29556-4980 Telephone: 843-355-6187 Website: www.santee.org
District offices:
Georgetown Office - 92 West Virginia Rd, Georgetown, SC 29440 Lake City Office - 349 West Main St, Lake City, SC 29560
QUESTON 2: Regarding permitting, who is the authority having jurisdiction?
ANSWER:
Steven Elliott
Building Official
Phone: 843-545-3116
Physical Address View Map 129 Screven Street Room 249 Georgetown, SC 29440
Mailing Address P.O. Drawer 421270 Georgetown, SC 29440
QUESTION 3: Will the government accept a refurbished used modular office in lieu of newly manufactured?
ANSWER: No. The contractor shall install a new modular office.
tel:843-355-6187 http://www.santee.org/ tel:8435453116
QUESTION 4: Regarding Mini Mute site #1, please confirm that it is the government’s intent that the access road cross an existing drainage ditch requiring installation culvert.
ANSWER: Yes the drainage ditch will require the installation of a 36” culvert. Approx 24’ wide.
The crossing shall be level with the surrounding ground and shall be hydro seeded.
QUESTION 5: Given the limited size of the construction sites, will the government require a Storm Water Protection Plan? Please reach out to the local MS4 if this will be required.
QUESTION 6: Regarding Mini Mute site #2, can it be confirmed that the existing facility adjacent to the site has sufficient excess electric power to service the required panel, or should a new feed be planned from the nearest utility connection point and cross the existing taxiway?
ANSWER: Please install a New Feeder from the nearest utility connection point.