Attachment 13-First Site Visit Questions-Answers.pdf

PDF 92 KB Posted

Attached to
Georgetown Airport Threat Emitter Operating Sites and Maintenance Location
Solicitation number
FA480325R0022
Issued by

About this file

This document is a Questions and Answers (Q&A) attachment for Solicitation FA480325R0022 for Georgetown Mini Mute Emitters, containing six specific questions and answers related to the project. The questions address utility providers, permitting authority, modular office requirements, site-specific infrastructure details, and electrical infrastructure. Key details include confirmation that the contractor must install a new modular office, install a 36" culvert at site #1 across a drainage ditch, and establish a new electrical feeder from the nearest utility connection point at site #2. The document provides contact information for the local utility provider (Santee) and the building official (Steven Elliott), and directs potential bidders to consult with the local MS4 regarding storm water protection plan requirements.

View the file

Other files

File Type Posted
Solicitation - FA480325R0022.pdf PDF
Solicitation Amendment FA480325R00220006 SF 30-16 Jul 25.pdf PDF
Attachment 15- 2nd Site Visit Additional Questions-Answers 8 Jul 25.pdf PDF
Solicitation Amendment FA480325R00220005.pdf PDF
Attachment 02 Proposal Price Breakout Sheet-17 Jun 25.xlsx XLSX spreadsheet
Attachment 04-MiniMute Site Plan 24 Feb 25.pdf PDF
Attachment 07- AF Form 66 Material Submittal Schedule-30 May 25.xlsx XLSX spreadsheet
Attachment 11-SF 1413 Statement of Acknowledgment-01 Oct 23.pdf PDF
Attachment 12-WD-Georgetown Heavy 20250001-3 Jan 25.pdf PDF
Solicitation FA480325R00220004.pdf PDF
Attachment 03-MiniMute Site Plan 24 Feb 25B.pdf PDF
Attachment 06-DD Form 1354 - 1 Aug 22.pdf PDF
Attachment 08-Progress Report Blank-1 Apr 96.pdf PDF
Attachment 14-Second Site Visit Questions-Answers.pdf PDF
Solicitation Amendment FA480325R00220004.pdf PDF
Attachment 09-Progress Schedule Blank-1 Jun 90.xlsx XLSX spreadsheet
Solicitation Amendment FA480325R00220001.pdf PDF
Solicitation Amendment FA480325R00220003.pdf PDF
Attachment 01-SOW 17 Jun 25.pdf PDF
Attachment 05-DD1354 Equipment Warranty.xlsx XLSX spreadsheet
Attachment 10-Shaw AFB SC Design Standards-21 Aug 18.pdf PDF
Solicitation Amendment FA480325R00220002.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA480325R0022

Georgetown Mini Mute Emitters

QUESTION 1: Please provide the utility providers for electric, water and sewer.

ANSWER:

Mailing address: P.O. Box 548, Kingstree, SC 29556 Street address: 424 Sumter Hwy, Kingstree, SC 29556-4980 Telephone: 843-355-6187 Website: www.santee.org

District offices:

Georgetown Office - 92 West Virginia Rd, Georgetown, SC 29440 Lake City Office - 349 West Main St, Lake City, SC 29560

QUESTON 2: Regarding permitting, who is the authority having jurisdiction?

ANSWER:

Steven Elliott

Building Official

Phone: 843-545-3116

Physical Address View Map 129 Screven Street Room 249 Georgetown, SC 29440

Mailing Address P.O. Drawer 421270 Georgetown, SC 29440

QUESTION 3: Will the government accept a refurbished used modular office in lieu of newly manufactured?

ANSWER: No. The contractor shall install a new modular office.

tel:843-355-6187 http://www.santee.org/ tel:8435453116

QUESTION 4: Regarding Mini Mute site #1, please confirm that it is the government’s intent that the access road cross an existing drainage ditch requiring installation culvert.

ANSWER: Yes the drainage ditch will require the installation of a 36” culvert. Approx 24’ wide.

The crossing shall be level with the surrounding ground and shall be hydro seeded.

QUESTION 5: Given the limited size of the construction sites, will the government require a Storm Water Protection Plan? Please reach out to the local MS4 if this will be required.

QUESTION 6: Regarding Mini Mute site #2, can it be confirmed that the existing facility adjacent to the site has sufficient excess electric power to service the required panel, or should a new feed be planned from the nearest utility connection point and cross the existing taxiway?

ANSWER: Please install a New Feeder from the nearest utility connection point.