Attachment 06-Price Breakdown Repair Interior B1601-1.pdf
PDF 83 KB Posted
- Attached to
- FA480325Q0064 - Repair Interior B1601 (Amended)
- Solicitation number
- FA480325Q0064
About this file
This document is a cost breakdown template for a B1601 Asbestos Removal and New Flooring project located at B1601, dated 4-Sep-25. The project involves comprehensive flooring renovation, including asbestos abatement and new floor installation. Specific scope items include 8,000 square feet of asbestos removal and clearance testing, floor preparation with leveling compound, moisture testing, vapor barrier installation, and new flooring installation using luxury vinyl plank (LVP) and carpet. Additional work includes cove base installation, drywall repair, threshold placement, and project mobilization. The document is marked as Controlled Unclassified Information (CUI) and was created by Jill Fox from the 20 CES/CENP department. Notably, all line items currently show $0.00 for both material and labor costs, suggesting this is a preliminary pricing template awaiting cost details.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: B1601 Asbestos Removal and New Flooring Location: B1601 Contractor TBD Date Created: 4-Sep-25
Labor Costs Unit Cost Total Avg. Rate Total
Asbestos Removal 1 Abatement / Clearance Testing SF 8000 $0.00 New Flooring (LVT and Carpet) 2 Floor Prep / Leveling Compound SF 3000 $0.00 3 Moisture Test / Vapor Barrier SF 2200 $0.00 4 LVP and Install SF 2200 $0.00 5 *Carpet and Adhesives SF 6548 $0.00 6 Carpet Install SF 6548 $0.00 7 Cove Base and Install LF 2000 $0.00 8 Drywall Repair LF 70 $0.00 9 Thresholds EA 2 $0.00
10 Mobilization EA $0.00 11 Dumpster Rental Month 12 Shipping Charges (Carpet, LVT, Adhesives) EA 1 13 Supervision Days $0.00
Totals: $0.00 $0.00 $0.00 $0.00
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
Line No.
Material Costs
Item Line TotalQuantity Unit of
Measure Direct Cost
Project Engineer:
Department:
Jill Fox
20 CES/CENP
IGE
File details come from the government source that posted it. Updated .