Attachment_3.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- FA4803-14-R-0003
About this file
See attached blank construction cost estimate sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_11_Additional_Spec_Sections.pdf | ||
| Amendment_6.pdf | ||
| Attachment_12_Wage_Determination_-_Building.pdf | ||
| Attachment_10_Revised_Electrical_Drawings.pdf | ||
| Attachment_9_Questions_and_Answers.pdf | ||
| amendment_5.doc | DOC document | |
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| Attachment_8_Site_Vist_Minutes.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| Solicitation.pdf | ||
| Attachment_6.pdf | ||
| Attachment_7.pdf | ||
| Attachment_4.pdf | ||
| Attachment_2.pdf | ||
| Attachment_1.pdf | ||
| Attachment_5.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA4803-14-R-0003 | Attachment 3 | |||||||||||
| VLSB 10-0001 | ||||||||||||
| REPAIR FITNESS CENTER B806 | 20th CENM | |||||||||||
| DEMO B901, B910 AND B396 | 30-Dec-13 | |||||||||||
| Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | |||||
| Unit Cost | Total | Labor Hours per Unit | Labor Cost per Unit | Labor-Hours | Avg. Rate ($/hr) | Total | ||||||
| BLDG 396. 910 AND 901 DEMO | ||||||||||||
| 1 | ASBESTOS TESTING | SF | $0.00 | |||||||||
| 2 | ABAITMENT FLOOR TILE | SF | $0.00 | |||||||||
| 3 | ABAITMENT ROOF FLASHING | LF | $0.00 | |||||||||
| 4 | DEMO 396 | SF | $0.00 | |||||||||
| 5 | DEMO 901 | SF | $0.00 | |||||||||
| 6 | DEMO 910 | SF | ||||||||||
| 7 | DEMO 910 FENCE/ SITE | SF | ||||||||||
| 8 | DEMO RETAINING/ CURB | LF | $0.00 | |||||||||
| 9 | PARKING LOT OVERLAY | TN | ||||||||||
| 10 | STRIPPING | EA | ||||||||||
| 11 | CURBING | LF | ||||||||||
| 12 | SITEWORK/ DRAINAGE/ BOLLARD | SY | ||||||||||
| 13 | LIGHTING | EA | $0.00 | |||||||||
| 14 | SUPERINTENDANT | HR | ||||||||||
| FITNESS CENTER | ||||||||||||
| A10 FOUNDATION SYSTEM | ||||||||||||
| 15 | A1010 Standard Foundations | SF | ||||||||||
| 16 | A1030 Slab On Grade | SF | ||||||||||
| B10 SUPERSTRUCTURE | ||||||||||||
| 17 | B1010 Floor Construction | SF | ||||||||||
| 18 | B1020 Roof Construction | SF | ||||||||||
| B20 EXTERIOR CLOSURE | ||||||||||||
| 19 | B2010 Exterior Walls | SF | ||||||||||
| 20 | B2020 Exterior Windows | SF | ||||||||||
| 21 | B2030 Exterior Doors | SF | ||||||||||
| B30 ROOFING | ||||||||||||
| 22 | B3010 Roof Coverings | SF | ||||||||||
| C10 INTERIOR CONSTRUCTION | ||||||||||||
| 23 | C1010 Partitions | SF | ||||||||||
| 24 | C1020 Interior Doors | SF | ||||||||||
| 25 | C1030 Fittings (Specialties) | SF | ||||||||||
| C30 INTERIOR FINISHES | ||||||||||||
| 26 | C3010 Wall Finishes | SF | ||||||||||
| 27 | C3020 Floor Finishes | SF | ||||||||||
| 28 | C3030 Ceiling Finishes | SF | ||||||||||
| D20 PLUMBING | ||||||||||||
| 29 | D2010 Plumbing Fixtures | EA | ||||||||||
| 30 | D2020 Domestic Water Distribution | EA | ||||||||||
| 31 | D2030 Sanitary Waste & Vent | EA | ||||||||||
| 32 | D2040 Rain Water Drainage | EA | ||||||||||
| 33 | D2050 Special Plumbing Systems | SF | ||||||||||
| D30 HVAC | ||||||||||||
| 34 | D3030 Cooling Generating Systems | TN | ||||||||||
| 35 | D3040 Distribution Systems | TN | ||||||||||
| 36 | D3060 Controls & Instrumentation | TN | ||||||||||
| 37 | D3070 Special HVAC Systems & Equipment | TN | ||||||||||
| D40 FIRE PROTECTION | ||||||||||||
| 38 | D4010 Fire Protection & Sprinkler Systems | SF | ||||||||||
| D50 ELECTRICAL | ||||||||||||
| 39 | D5010 Electrical Service & Distribution | SF | ||||||||||
| 40 | D5020 Lighting & Branch Wiring | SF | ||||||||||
| 41 | D5030 Communication & Branch Wiring | SF | ||||||||||
| 42 | D5040 Special Electrical Systems | SF | ||||||||||
| E10 EQUIPMENT | ||||||||||||
| 43 | E1010 Gym Equipment | SF | ||||||||||
| 44 | E1090 Kitchen Equipment | SF | ||||||||||
| E20 FURNISHINGS | ||||||||||||
| 45 | E2010 Fixed Furnishings | |||||||||||
| F20 SELECTIVE BUILDING DEMOLITION | ||||||||||||
| 46 | F2010 Building Elements Demolition | SF | $0.00 | |||||||||
| 47 | SUPERINTENDANT | HR | $0.00 | $0.00 | 1 | $50.00 | 0.0 | $50.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Total Material Cost: | $0.00 | |||||||||||
| Total Labor Cost: | $0.00 | |||||||||||
| Direct Cost: | $0.00 | |||||||||||
| Total Line Item Cost: | $0.00 | |||||||||||
| Overhead: | % | $0.00 | ||||||||||
| Subtotal: | $0.00 | |||||||||||
| Profit: | % | $0.00 | ||||||||||
| Subtotal: | $0.00 | |||||||||||
| Bond: | % | $0.00 | ||||||||||
| Total Contract Price: | $0.00 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .