See attached blank construction cost estimate sheet.

View the file

Other files

File Type Posted
Attachment_11_Additional_Spec_Sections.pdf PDF
Amendment_6.pdf PDF
Attachment_12_Wage_Determination_-_Building.pdf PDF
Attachment_10_Revised_Electrical_Drawings.pdf PDF
Attachment_9_Questions_and_Answers.pdf PDF
amendment_5.doc DOC document
Amendment_4.pdf PDF
Amendment_3.pdf PDF
Attachment_8_Site_Vist_Minutes.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Solicitation.pdf PDF
Attachment_6.pdf PDF
Attachment_7.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_1.pdf PDF
Attachment_5.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FA4803-14-R-0003Attachment 3
VLSB 10-0001
REPAIR FITNESS CENTER B80620th CENM
DEMO B901, B910 AND B39630-Dec-13
Line No.ItemUnit of MeasureQuantityMaterial CostsLabor CostsDirect CostLine Total
Unit CostTotalLabor Hours per UnitLabor Cost per UnitLabor-HoursAvg. Rate ($/hr)Total
BLDG 396. 910 AND 901 DEMO
1ASBESTOS TESTINGSF$0.00
2ABAITMENT FLOOR TILESF$0.00
3ABAITMENT ROOF FLASHINGLF$0.00
4DEMO 396SF$0.00
5DEMO 901SF$0.00
6DEMO 910SF
7DEMO 910 FENCE/ SITESF
8DEMO RETAINING/ CURBLF$0.00
9PARKING LOT OVERLAYTN
10STRIPPINGEA
11CURBINGLF
12SITEWORK/ DRAINAGE/ BOLLARDSY
13LIGHTINGEA$0.00
14SUPERINTENDANTHR
FITNESS CENTER
A10 FOUNDATION SYSTEM
15A1010 Standard FoundationsSF
16A1030 Slab On GradeSF
B10 SUPERSTRUCTURE
17B1010 Floor ConstructionSF
18B1020 Roof ConstructionSF
B20 EXTERIOR CLOSURE
19B2010 Exterior WallsSF
20B2020 Exterior WindowsSF
21B2030 Exterior DoorsSF
B30 ROOFING
22B3010 Roof CoveringsSF
C10 INTERIOR CONSTRUCTION
23C1010 PartitionsSF
24C1020 Interior DoorsSF
25C1030 Fittings (Specialties)SF
C30 INTERIOR FINISHES
26C3010 Wall FinishesSF
27C3020 Floor FinishesSF
28C3030 Ceiling FinishesSF
D20 PLUMBING
29D2010 Plumbing FixturesEA
30D2020 Domestic Water DistributionEA
31D2030 Sanitary Waste & VentEA
32D2040 Rain Water DrainageEA
33D2050 Special Plumbing SystemsSF
D30 HVAC
34D3030 Cooling Generating SystemsTN
35D3040 Distribution SystemsTN
36D3060 Controls & InstrumentationTN
37D3070 Special HVAC Systems & EquipmentTN
D40 FIRE PROTECTION
38D4010 Fire Protection & Sprinkler SystemsSF
D50 ELECTRICAL
39D5010 Electrical Service & DistributionSF
40D5020 Lighting & Branch WiringSF
41D5030 Communication & Branch WiringSF
42D5040 Special Electrical SystemsSF
E10 EQUIPMENT
43E1010 Gym EquipmentSF
44E1090 Kitchen EquipmentSF
E20 FURNISHINGS
45E2010 Fixed Furnishings
F20 SELECTIVE BUILDING DEMOLITION
46F2010 Building Elements DemolitionSF$0.00
47SUPERINTENDANTHR$0.00$0.001$50.000.0$50.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total Material Cost:$0.00
Total Labor Cost:$0.00
Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:%$0.00
Subtotal:$0.00
Profit:%$0.00
Subtotal:$0.00
Bond:%$0.00
Total Contract Price:$0.00