Attachment_11_Additional_Spec_Sections.pdf
PDF 679 KB Posted
- Solicitation number
- FA4803-14-R-0003
About this file
Attachment 11 Additional Spec Sections
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_6.pdf | ||
| Attachment_12_Wage_Determination_-_Building.pdf | ||
| Attachment_10_Revised_Electrical_Drawings.pdf | ||
| Attachment_9_Questions_and_Answers.pdf | ||
| amendment_5.doc | DOC document | |
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| Attachment_8_Site_Vist_Minutes.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| Solicitation.pdf | ||
| Attachment_3.xls | XLS spreadsheet | |
| Attachment_6.pdf | ||
| Attachment_7.pdf | ||
| Attachment_4.pdf | ||
| Attachment_2.pdf | ||
| Attachment_1.pdf | ||
| Attachment_5.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS TOC - 3
Section 113100 Residential Appliances Section 116623 Gymnasium Equipment Section 116653 Gymnasium Dividers
DIVISION 12 FURNISHINGS
Section 122413 Roller Window Shades Section 124813 Floor Mats and Frames
DIVISION 13 SPECIAL CONSTRUCTION
Section 130320 Racquetball Glass
DIVISION 21 FIRE SUPPRESSION
Section 211300.0020 Wet Pipe Fire Suppression Sprinklers
DIVISION 22 PLUMBING
Section 220000 Plumbing, General Purpose Section 220548 Mechanical Sound, Vibration, and Seismic Control
DIVISION 23 MECHANICAL
Section 230300 Basic Mechanical Materials and Methods Section 230700 Thermal Insulation for Mechanical Systems Section 230800 Commissioning of HVAC Systems Section 230820 HVAC Testing/Adjusting/Balancing Section 230954 Direct Digital Control Systems Section 232300 Refrigerant Piping Section 233013 Ductwork and Ductwork Accessories Section 233700 Air Outlets and Inlets Section 237200 Air-to-Air Energy Recovery Equipment Section 238105.0020 Multi Indoor Unit Variable Refrigerant Flow Air Conditioning Equipment
DIVISION 26 ELECTRICAL
Section 260000 Basic Electrical Materials and Methods Section 260548 Seismic Protection for Electrical Equipment Section 262000 Interior Distribution System Section 265100 Interior Lighting
DIVISION 27 COMMUNICATIONS
Section 271000 Building Telecommunications Cabling System
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
Section 221423 Storm Drainage Piping Section
26 05 13.00 40 MEDIUM-VOLTAGE CABLES
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
FA4803-14-R-0003-
Attachment 11
1387621314C Line
1387621314C Line
STORM DRAINAGE PIPING SPECIALTIES 221423 - 1
SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Roof drains.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.4 QUALITY ASSURANCE
A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.
PART 2 - PRODUCTS
2.1 METAL ROOF DRAINS
A. Metal, Medium-Sump, Deck Roof Drains Insert drawing designation if any:
1. Standard: ASME A112.6.4, for deck roof drains; ASME A112.6.3, for floor drains.
2. Body Material: Metal.
3. Flange: Anchor.
4. Clamping Device: Not required.
5. Integral Backwater Valve: Not required.
6. Outlet: Bottom.
7. Grate Material: Cast iron.
8. Grate Finish: Painted.
9. Overall Dimension of Frame and Grate: Nominal 14 inches round.
10. Top-Loading Classification: Extra-Heavy Duty.
11. Vandal-Proof Frame and Grate: Not required.
PART 3 - EXECUTION
3.1 INSTALLATION
FA4803-14-R-0003-
Attachment 11
STORM DRAINAGE PIPING SPECIALTIES 221423 - 2
A. Install roof drains at low points of roof areas according to roof membrane manufacturer's written installation instructions.
1. Install flashing collar or flange of roof drain to prevent leakage between drain and adjoining roofing. Maintain integrity of waterproof membranes where penetrated.
2. Install expansion joints, if indicated, in roof drain outlets.
3. Position roof drains for easy access and maintenance.
3.2 CONNECTIONS
A. Comply with requirements for piping specified in Section 221413 "Facility Storm Drainage Piping."
Drawings indicate general arrangement of piping, fittings, and specialties.
3.3 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.
B. Place plugs in ends of uncompleted piping at end of each day or when work stops.
END OF SECTION 221423
SECTION 26 05 13.00 40
MEDIUM-VOLTAGE CABLES
08/10
PART 1 GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)
AEIC C8 (2000) Extruded Dielectric Shielded Power Cables Rated 5 Through 46 kV
AEIC CS1 (2012) Impregnated-Paper-Insulated, Metallic Sheathed Cable, Solid Type
ASTM INTERNATIONAL (ASTM)
ASTM B3 (2012) Standard Specification for Soft or Annealed Copper Wire
ASTM D746 (2007) Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 383 (2003; R 2008) Standard for Qualifying Class 1E Electric Cables and, Field Splices for Nuclear Power Generating Stations 2004
IEEE 400.2 (2004) Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF)
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)
RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance Guide
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA WC 71/ICEA S-96-659 (1999) Standard for Nonshielded Cables Rated 2001-5000 Volts for use in the Distribution of Electric Energy
NEMA WC 2 (1980; Rev 1 1989; R 1998; R 2005) Standard for Steel Armor and Associated Coverings for Impregnated Paper Insulated Cables (ICEA S-67-401 5th Edition)
NEMA WC 27500 (2012) Standard for Aerospace and Industrial Electrical Cable
NEMA WC 70 (2009) Power Cable Rated 2000 V or Less for the Distribution of Electrical Energy--S95-658
NEMA WC 74/ICEA S-93-639 (2012) 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric Energy
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2011; Errata 2 2012) National Electrical Code
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-228 (2000; Notices 1-5) Cable and Wire, Insulated; Methods of Testing
DEFINITIONS
Medium voltage power cables includes all cables rated above 600 to 35,000 volts.
GENERAL REQUIREMENTS
Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to work specified in this section.
Provide Certificates for the following showing that the cable manufacturer has made factory-conducted tests on each shipping length of cable. Provide certified copies of test data that shows conformance with the referenced standards and is approved prior to delivery of cable.
SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that reviews the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Provide equipment and performance data and manufacturer's catalog data for the following items:
Single-Conductor Shielded Cables; G
SD-06 Test Reports
Provide test reports for the following in accordance with the paragraph entitled, "Field Testing," of this section.
Dielectric Absorption Tests; G
High-Voltage Tests; G
Radiographic Tests; G
SD-07 Certificates
Provide listing of products installed showing qualifications of Cable Splicers to the Contracting Officer prior to specified work.
Provide Certificates; G for the following:
Lead Sheath; G
Flammability; G
Minimum Bending Radius; G
High-Voltage Tests; G
Dielectric Absorption Tests; G
Cable Splicers; G
SD-08 Manufacturer's Instructions
Provide manufacturer's instructions showing the recommended sequence and method of installation for the following:
Medium-Voltage Power Cables; G
Pothead Terminations; G
QUALIFICATIONS
Cable splicers performing splicing are required to have 5 years experience in cable splicing and terminations. Once a termination or splice has been started by a worker, the same person completes that particular splice.
Start and complete each termination and splice in one continuous work period.
CABLE VOLTAGE RATINGS
Provide Medium-voltage power cables including multiple- and single-conductor cables rated as follows, phase-to-phase, for grounded and ungrounded neutral systems:
Use cables rated 15,000 volts, ungrounded neutral, on 12,470-volt, three-phase, 60-hertz distribution systems.
SHIPMENT
Ship cables on reels such that the cable is protected from mechanical injury. Hermetically seal and securely attach each end of each length of cable to the reel.
Make minimum reel drum diameter 14 times the overall diameter of the cable. Provide a pulling eye that is installed by the manufacturer for each length of cable supplied for installation in ducts, manholes, and utility tunnels.
PART 2 PRODUCTS
CONDUCTORS
Provide conductors that are solid copper conforming to ASTM B3.
CABLE IDENTIFICATION
Provide cables that have a tape placed immediately under the lead sheath or outer jacket showing the name of the manufacturer, the year in which the cable was manufactured, and a unique number for identification purposes.
Closely group information on the tape at 1-foot intervals to permit complete identification.
MULTIPLE-CONDUCTOR SHIELDED CABLES
SINGLE-CONDUCTOR SHIELDED CABLES
Ethylene-Propylene-Rubber-Insulated with PVC Jacket
Provide single-conductor 15 KV cable assemblies that consist of: Class B stranded copper conductors, an extruded semiconducting shield over the conductors, 220 mils of ethylene propylene rubber insulation, an extruded or other approved semiconducting shield, a 5 mil minimum copper tape shield wrapped helically with a minimum 12.5 percent overlap and a PVC jacket.
Provide single-conductor, ethylene-propylene-insulated, polyvinylchloride-jacketed, shielded cable that conforms to NEMA WC 70, ANSI/NEMA WC 71/ICEA S-96-659, NEMA WC 74/ICEA S-93-639 and AEIC C8.
PORTABLE CABLES
Provide type SHD multiple-conductor, butyl-rubber-insulated, neoprene-jacketed, shielded portable cable conforming to NEMA WC 70, ANSI/NEMA WC 71/ICEA S-96-659 and NEMA WC 74/ICEA S-93-639.
CABLE SUPPORTS AND FITTINGS
Provide cable supports, related fittings, and accessories for use in corrosive underground locations, such as manholes and utility tunnels, with a factory applied coating of polyvinylchloride of at least 20 mils thick.
Provide polyvinylchloride (PVC) coated items that have a uniform thickness and be free of blisters, breaks, and holidays. Provide PVC compound that conforms to ASTM D746.PART 3 EXECUTION
INSTALLATION
Install medium-voltage cables in accordance with NFPA 70.
Install cable in underground duct banks; in conduit above and below grade;
inside buildings; by open wire method; on insulator hooks; on racks; in wall and ceiling mounted cable trays in utility tunnels and manholes; and by direct burial.
Secure cables with heavy duty cable ties in existing or new trays mounted horizontally, where cable rests on tray bottom. Install cable ties at minimum of 10 foot intervals.
Secure cables with non-metallic cable clamps, straps, hangers, or other approved supporting devices to tunnel walls, ceilings, and in new or existing cable trays mounted vertically, where tray bottom is in a vertical plane.
When field cuts or other damage occurs to the PVC coating, apply a liquid PVC patch to maintain the integrity of the coating. After the installation is complete, perform an inspection to ensure the absence of voids, pinholes, or cuts.
Ensure that all cable tray is properly secured and supported prior to installing new armored cable. Add new permanent and/or temporary tray support devices as required to preclude cable tray failure during cable pulling or after cable is installed.
Cable or conductors of a primary distribution system will be rejected when installed openly in cable trays or openly racked along interior walls; in the same raceway or conduit with ac/dc control circuits or ac power circuits operating at less than 600 volts; or in a manner allowing cable to support its own weight.
Moisture-Testing Before Pulling
Moisture-test cable that has paper insulation before before pulling it into underground ducts. Ensure that radii of bends, potheads, fittings, cable risers, and other conditions are suitable for the cable and conform with the recommendations of the cable manufacturer.
Protection During Splicing Operations
Provide blower to force fresh air into manholes or confined areas where free movement or circulation of air is obstructed. Make waterproof protective coverings available on the work site to provide protection against moisture while a splice is being made. Use pumps to keep manholes dry during splicing operations. Never make a splice or termination with the interior of a cable exposed to moisture. Moisture-test conductor insulation paper before the splice is made. Use a manhole ring at least 6 -inches above ground around the manhole entrance to keep surface water from entering the manhole. Plug unused ducts and stop water seepage through ducts in use before the splice is started.
Duct Cleaning
Thoroughly clean ducts before installation of power cables. Pull a standard flexible mandrel through each duct to loosen particles of earth, sand, or foreign material in the line. Provide not less than 12-inches long mandrel with a diameter 1/2 inch less than the inside diameter of the duct. Then pull a brush with stiff bristles through each duct to remove the loosened particles. Provide brush diameter that is the same as or slightly larger than the diameter of the duct.
Pulling Cables in Ducts, Manholes and Utility Tunnels
Pull medium-voltage cables into ducts and utility tunnels with equipment designed for this purpose, including power-driven winch, cable-feeding flexible tube guide, cable grips, and lubricants. Employ a sufficient number of trained personnel and equipment to ensure the careful and proper installation of the cable.
Set up cable reel at the side of the manhole or tunnel hatch opening and above the duct or hatch level, allowing the cable to enter through the opening without reverse bending. Install flexible tube guide through the opening in a manner that prevents the cable from rubbing on the edges of any structural member.
Allow for a pulling force for a cable grip on lead-sheathed cable that does not exceed 1,500 pounds per square inch of sheath cross-sectional area.
Use a dynamometer in the pulling line to ensure that the pulling force is not exceeded. Allow for a pulling force for a nonmetallic-sheathed cable that does not exceed the smaller of 1,000 pounds or a value computed from the following equation:
TM = 0.008 X N X CM
Where: TM = maximum allowable pulling tension in pounds
N = number of conductors in the cable
CM = cross-sectional area of each conductor in circular mils
Unreel cable from the top of the reel. Carefully control payout. Make cable to be pulled be attached through a swivel to the main pulling wire by means of a pulling eye.
Use woven-wire cable grips to grip the cable end when pulling small cables and short straight lengths of heavier cables.
Attach pulling eyes to the cable conductors to prevent damage to the cable structure.
Use pulling eyes and cable grips together for nonmetallic sheathed cables to prevent damage to the cable structure.
Provide a minimum bending radius in accordance with the following:
MINIMUM BENDING RADIUS MULTI-
CABLE TYPE PLIER TIMES CABLE DIAMETER
RUBBER- AND PLASTIC-IN-
SULATED CABLE WITH OR
WITHOUT INTERLOCKED ARMOR
Nonshielded cables 8 Shielded cables with 12 shielding tape
Shielded cables with 8 shielding wire
Liberally coat cables with a suitable cable-pulling lubricant as it enters the tube guide or duct. Use grease and oil lubricants only on lead-sheathed cables. Cover nonmetallic sheathed cables with wire-pulling compounds when required which have no deleterious effects on the cable.
Provide rollers, sheaves, or tube guides around which the cable is pulled that conform to the minimum bending radius of the cable.
Pull cables into ducts at a speed not to exceed 50 feet per minute and not in excess of maximum permissible pulling tension specified by the cable manufacturer. Cable pulling using a vehicle is not permitted. Stop pulling operations immediately with any indication of binding or obstruction and do not resume until such difficulty is corrected. Provide sufficient slack for free movement of cable due to expansion or contraction.
Make cable splices made up in manholes or utility tunnels that are firmly supported on cable racks as indicated. Do not pull cable splices in ducts. Overlap cable ends at the ends of a section to provide sufficient undamaged cable for splicing. Make cables to be spliced in manholes or utility tunnels overlap the centerline of the proposed joint by not less than 2 feet.
Provide cables cut in the field that have the cut ends immediately sealed to prevent entrance of moisture. Seal nonleaded cables with rubber tape wrapped down to 3 inches from the cable end. Cover-wrap rubber tape with polyvinylchloride tape. Seal lead-covered cables with wiping metal making a firm bond with the end of the sheath or with a disk of lead fitted over the end and wiped to the sheath.
Splices and Terminations
Make splices in manholes or tunnels except where cable terminations are specifically indicated. Expedite splicing and terminating of cables to minimize exposure and cable deterioration.
Terminate cables in potheads. Dry terminations with medium voltage pennants, preformed, and hand wrapped stress cones are allowed for terminating cables. Provide potheads with adequate means for making external connections to the cable conductors of single- conductor cables;
protecting the cable insulation against moisture, oil, or other contaminant; physically protecting and supporting cables, and maintaining the insulation level of the cable.
Field-fabricate Pothead terminations from termination kits supplied by and in accordance with the pothead manufacturer's recommendations for the type, size, and electrical characteristics of the cable.
Installation includes built-up or prefabricated heat or cold shrink stress-relief cones at the terminals of all shielded cables and at the terminals of single-conductor lead-covered cables rated 15 kV and above, ungrounded.
Field fabricate cable splices from splicing kits supplied by and in accordance with the cable manufacturer's recommendations for the type, size, and electrical characteristics of the cable specified. Locate cable splices in manholes midway between cable racks on walls of manholes and supported with cable arms at approximately the same elevation as the enclosing duct.
Cable splices in the tunnel which are not installed in cable trays, install on cable racks or by other approved methods which minimize physical stress on the splice connections. Support splices at approximately the same elevation as the installed cable except where space limitations or existing cable length limitations make this method impractical or impossible.
Support all universal demountable splices in such manner so as to minimize physical stress on the splice connections. Support each cable end termination using a pair of saddle type supports under the cable end termination and/or cable with a minimum 12 inches and a maximum 30 inches separation between the supports. Secure cable end termination and cable to the supports in such a manner as to prevent movement of termination or cable at the support. Install saddle type supports on galvanized steel framing channel anchored to the wall or securely fastened to the cable tray or installed by other approved methods.
Single-Conductor Potheads
Provide single-conductor potheads that are the hermetically sealed capnut type and that are suitable for the type, size, and electrical characteristics of the cable specified. Provide potheads that consist of cast bodies, bushings, cable connectors, lugs, and entrance fittings.
Provide pothead bodies that are metal castings with mounting brackets, when required, pipe plugs for filling and vent holes, and machined flanged surface for cable-entrance fitting. Provide bodies that are cast iron for cables up to 250 kc mils, and cast nonmagnetic metal casting for cable of larger size and higher current ratings.
Provide bushings that are glazed wet-process electrical porcelain insulators, factory assembled and hermetically sealed to the pothead body.
Provide cable connectors that are high-conductivity copper accurately machined and threaded for internal and external electrical connections.
Provide adequate cross-sectional and contact areas to carry the full-load current rating of the conductors. Provide solder type cable connectors with gasket seal between the connector and bushing.
Completely fill potheads, leaving no gaps or voids, with an insulating compound suitable for the type of cable, insulation, voltage rating, and ambient operating temperatures in accordance with the pothead manufacturer's recommendations. Ground pothead parts that do not carry current.
FIELD TESTING
Perform PT&I tests and provide submittals as specified in Section
01 86 26.07 40 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS.
Subject each to dielectric-absorption tests and high-voltage tests after the installation of high-voltage power cables has been completed, including splices, joints, and terminations, and before the cable is energized.
Provide test equipment, labor, and technical personnel as necessary to perform the electrical acceptance tests.
Make arrangements to have tests witnessed and approved by the Contracting Officer.
Completely isolate each power-cable installation from extraneous electrical connections at cable terminations and joints. Observe safety precautions.
First give each power cable a full dielectric-absorption test with 5000-volt insulation-resistance test set. Apply test for a long enough time to fully charge the cable. Record readings every 15 seconds during the first 3 minutes of test and at 1 minute intervals thereafter. Continue test until three equal readings, 1 minute apart, are obtained. Minimum reading is 200 megohms at an ambient temperature of 68 degrees F. Correct readings taken at other than 68 degrees F ambient temperatures.
Upon successful completion of the dielectric absorption tests, subject the cable to a direct-current high-potential test for 5 minutes with test voltages applied in accordance with AEIC CS1 and IEEE 400.2 for paper-impregnated, lead-covered cable; AEIC C8 and IEEE 400.2 for cross-linked, polyethylene-insulated cable; and AEIC C8 and IEEE 400.2 for ethylene propylene rubber-insulated cable.
Record leakage current readings every 30 seconds during the first 2 minutes and every minute thereafter for the remainder of the test. When the leakage current continues to increase after the first minute, immediately terminate the test and take steps to find and correct the fault. When a second test becomes necessary, repeat this test procedure.
Upon satisfactory completion of the high-potential test, give the cable a second dielectric-absorption test as before.
Provide results of the second dielectric-absorption test that agree with the first test and that indicate no evidence of permanent injury to the cable caused by the high-potential test.
Record test data and include identification of cable and location, megohm readings versus time, leakage current readings versus time, and cable temperature versus time.
Final acceptance depends upon the satisfactory performance of the cable under test. Do not energize cable until recorded test data has been approved by the Contracting Officer Provide final test reports to the Contracting Officer. Provide reports with a cover letter/sheet clearly marked with the System name, Date, and the words "Final Test Report - Forward to the Systems Engineer/Condition Monitoring Office/Predictive Testing Group for inclusion in the Maintenance Database."
Perform Radiographic tests on all potheads at the discretion of the Contracting Officer to determine if voids exist in the pothead. Rework unacceptable terminations at no additional expense to the Government.
-- End of Section --
SECTION 26 12 19.10
THREE-PHASE PAD-MOUNTED TRANSFORMERS
02/12
PART 1 GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 318M (2011; Errata 2013) Building Code Requirements for Structural Concrete & Commentary
ASTM INTERNATIONAL (ASTM)
ASTM A240/A240M (2012a) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
ASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM D117 (2010) Standard Guide for Sampling, Test Methods, Specifications and Guide for Electrical Insulating Oils of Petroleum Origin
ASTM D1535 (2013) Specifying Color by the Munsell System
ASTM D3487 (2009) Standard Specification for Mineral Insulating Oil Used in Electrical Apparatus
ASTM D877 (2002; R 2007) Standard Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes
ASTM D92 (2012b) Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester
ASTM D97 (2012) Pour Point of Petroleum Products
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 386 (2006; INT 1 2011) Standard for Separable Insulated Connector Systems for Power Distribution Systems Above 600V
IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5 2013) National Electrical Safety Code
IEEE C37.47 (2011) Standard for High Voltage Current-Limiting Type Distribution Class Fuses and Fuse Disconnecting Switches
IEEE C57.12.00 (2010) Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.28 (2005; INT 3 2011) Standard for Pad-Mounted Equipment - Enclosure Integrity
IEEE C57.12.29 (2005) Standard for Pad-Mounted Equipment
- Enclosure Integrity for Coastal Environments
IEEE C57.12.34 (2009) Standard for Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 5 MVA and Smaller; High Voltage, 34.5 kV Nominal System Voltage and Below; Low Voltage, 15 kV Nominal System Voltage and Below
IEEE C57.12.90 (2010) Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.13 (2008; INT 2009) Standard Requirements for Instrument Transformers
IEEE C57.98 (2011) Guide for Transformer Impulse Tests
IEEE C62.11 (2012) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (>1kV)
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2013) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C12.1 (2008) Electric Meters Code for Electricity Metering
ANSI C12.7 (2005) Requirements for Watthour Meter Sockets
NEMA LI 1 (1998; R 2011) Industrial Laminating Thermosetting Products
NEMA/ANSI C12.10 (2011) Physical Aspects of Watthour Meters
- Safety Standards
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2011; Errata 2 2012) National Electrical Code
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT (OECD)
OECD Test 203 (1992) Fish Acute Toxicity Test
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 712-C-98-075 (1998) Fate, Transport and Transformation Test Guidelines - OPPTS 835.3100- "Aerobic Aquatic Biodegradation"
EPA 821-R-02-012 (2002) Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 431 Energy Efficiency Program for Certain Commercial and Industrial Equipment
UNDERWRITERS LABORATORIES (UL)
UL 467 (2007) Grounding and Bonding Equipment
RELATED REQUIREMENTS
Section 26 08 00 APPARATUS INSPECTION AND TESTING applies to this section, with the additions and modifications specified herein.
DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in
IEEE 100.
SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Pad-mounted transformer drawings; G
SD-03 Product Data
Pad-mounted transformers; G
Submittal shall include manufacturer's information for each component, device, insulating fluid, and accessory provided with the transformer.
SD-06 Test Reports
Acceptance checks and tests; G
Submittal shall include acceptance criteria and limits for each test in accordance with NETA ATS "Test Values".
SD-07 Certificates
Transformer Efficiencies; G
Submit certification, including supporting calculations, from the manufacturer indicating conformance with the paragraph entitled "Specified Transformer Efficiencies."
SD-09 Manufacturer's Field Reports
Pad-mounted transformer design tests; G
Pad-mounted transformerroutine and other tests; G
SD-10 Operation and Maintenance Data
Transformer(s), Data Package 5; G
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein.
SD-11 Closeout Submittals
Transformer test schedule; G
Submit report of test results as specified by paragraph entitled "Field Quality Control."
Reduced Submittal Requirements
Transformers designed and manufactured by ABB in Jefferson City, MO; by Cooper Power Systems in Waukesha, WI; by ERMCO in Dyersburg, TN; or by Howard Industries in Laurel, MS need not submit the entire submittal package requirements of this contract. Instead, the following items shall be submitted:
a. A certification, signed by the manufacturer, stating that the technical requirements of this specification shall be met.
b. An outline drawing of the transformer with devices identified (paragraph entitled "Pad-Mounted Transformer Drawings", item a).
c. ANSI nameplate data of the transformer (paragraph entitled "Pad-Mounted Transformer Drawings", item b).
d. Manufacturer's published time-current curves (properly overlaid on one full size logarithmic paper) of the transformer high side fuses (paragraph entitled "Pad-Mounted Transformer Drawings", item e) with transformer damage curve, inrush curve, and thru fault current indicated.
e. Routine and other tests (in PART 2, see paragraph entitled "Source Quality Control", subparagraph entitled "Routine and Other Tests"), shall be conducted by the manufacturer and may be witnessed by the government. Provide transformer test schedule required by submittal item "SD-11 Closeout Submittals". Provide certified copies of the tests.
f. Provide acceptance test reports required by submittal item "SD-06 Test Reports".
g. Provide operation and maintenance manuals required by submittal item "SD-10 Operation and Maintenance Data".
QUALITY ASSURANCE
Pad-Mounted Transformer Drawings
Drawings shall indicate, but not be limited to the following:
a. An outline drawing, with front, top, and side views.
b. ANSI nameplate data.
c. Elementary diagrams and wiring diagrams with terminals identified of watthour meter and current transformers.
d. One-line diagram, including switch(es), current transformers, meters, and fuses.
e. Manufacturer's published time-current curves (on full size logarithmic paper) of the transformer high side fuses.
Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
MAINTENANCE
Additions to Operation and Maintenance Data
In addition to requirements of Data Package 5, include the following on the actual transformer(s) provided:
a. An instruction manual with pertinent items and information highlighted
b. An outline drawing, front, top, and side views
c. Prices for spare parts and supply list
d. Routine and field acceptance test reports
e. Fuse curves for primary fuses
f. Information on watthour demand meter, CT's, and fuse block
g. Actual nameplate diagram
h. Date of purchase
WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
PART 2 PRODUCTS
PRODUCT COORDINATION
Products and materials not considered to be pad-mounted transformers and related accessories are specified in Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION, Section 33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION.
THREE-PHASE PAD-MOUNTED TRANSFORMERS
IEEE C57.12.34, IEEE C57.12.28 and as specified herein.
Compartments
The high- and low-voltage compartments shall be separated by steel isolating barriers extending the full height and depth of the compartments.
Compartment doors: hinged lift-off type with stop in open position and three-point latching.
High Voltage, Dead-Front
High-voltage compartment shall contain the incoming line, insulated high-voltage load-break connectors, bushing well inserts, feed-thru inserts, six high-voltage bushing wells configured for loop feed application, load-break switch handle(s), access to oil-immersed bayonet fuses, dead-front surge arresters, tap changer handle, connector parking stands with insulated standoff bushings, protective caps, and ground pad.
a. Insulated high-voltage load-break connectors: IEEE 386, rated 15 kV, 95 kV BIL. Current rating: 200 amperes rms continuous. Short time rating: 10,000 amperes rms symmetrical for a time duration of 0.17 seconds. Connector shall have a steel reinforced hook-stick eye, grounding eye, test point, and arc-quenching contact material.
c. Bushing well inserts and feed-thru inserts: IEEE 386, 200 amperes, 15 kV Class. Provide a bushing well insert for each bushing well unless indicated otherwise.
ARRANGEMENT
NO.
DESCRIPTION OF
SWITCH ARRANGEMENT
SWITCH POSITION
LINE A SW. LINE B SW XFMR. SW
OPEN CLOSE OPEN CLOSE OPEN CLOSE
1 Line A connected to Line B and both lines connected to transformer
X X X
2 Transformer connected to Line A only
X X X
3 Transformer connected to Line Bonly
X X X
4 Transformer open and loop closed
X X X
ARRANGEMENT
NO.
DESCRIPTION OF
SWITCH ARRANGEMENT
SWITCH POSITION
LINE A SW. LINE B SW XFMR. SW
OPEN CLOSE OPEN CLOSE OPEN CLOSE
5 Transformer open and loop open
X X X
f. Provide bayonet type, oil-immersed, expulsion fuses in series with oil-immersed, partial-range, current-limiting fuses. Bayonet fuse links shall sense both high currents and high oil temperature in order to provide thermal protection to the transformer. Coordinate transformer protection with expulsion fuse clearing low-current faults and current-limiting fuse clearing high-current faults beyond the interrupting rating of the expulsion fuse. In order to eliminate or minimize oil spills, the bayonet fuse assembly shall include an oil retention valve inside the housing which closes when the fuse holder is removed and an external drip shield. Warning shall be conspicuously displayed within the high-voltage compartment cautioning against removing or inserting fuses unless the load-break switch is in the open position and the tank pressure has been released.
Bayonet fuse assembly: 150 kV BIL.
Oil-immersed current-limiting fuses: IEEE C37.47; 50,000 rms amperes symmetrical interrupting rating at the system voltage specified.
Connect current-limiting fuses ahead of the radial-feed load-break switch.
h. Surge arresters: IEEE C62.11, rated 6 kV, fully shielded, dead-front, metal-oxide-varistor, elbow type with resistance-graded gap. Provide three arresters for radial feed circuits. Provide three arresters for loop feed circuits.
i. Parking stands: Provide a parking stand near each bushing. Provide insulated standoff bushings for parking of energized high-voltage connectors on parking stands.
j. Protective caps: IEEE 386, 200 amperes, 15 kV Class. Provide insulated protective caps (not shipping caps) for insulating and sealing out moisture from unused bushings.
Low Voltage
Low-voltage compartment shall contain low-voltage bushings with NEMA spade terminals, accessories, metering, stainless steel or laser-etched anodized aluminum diagrammatic transformer nameplate, and ground pad.
a. Accessories shall include drain valve with sampler device, fill plug, pressure relief device, liquid level gage, pressure-vacuum gage, and dial type thermometer with maximum temperature indicator.
c. Metering: NEMA/ANSI C12.10. Provide a socket-mounted electronic programmable outdoor watthour meter, surface mounted flush against the side of the low-voltage compartment as indicated. Meter shall either be programmed at the factory or shall be programmed in the field. When field programming is performed, turn field programming device over to the Contracting Officer at completion of project. Meter shall be coordinated to system requirements.
1. Design: Provide meter designed for use on a 3-phase, 4-wire, 208Y/120 volt system with 3 current transformers. Include necessary KYZ pulse initiation hardware for Energy Monitoring and Control System (EMCS).
2. Coordination: Provide meter coordinated with ratios of current transformers and transformer secondary voltage.
3. Class: 20; Form: 9S; Accuracy: plus or minus 1.0 percent;
Finish: Class II
4. Cover: Polycarbonate and lockable to prevent tampering and unauthorized removal.
5. Kilowatt-hour Register: five digit electronic programmable type
6. Demand Register:
(a) Provide solid state
(b) Meter reading multiplier: Indicate multiplier on the meter face.
(c) Demand interval length: shall be programmed for 15 minutes with rolling demand up to six subintervals per interval.
7. Meter fusing: Provide a fuse block mounted in the secondary compartment containing one fuse per phase to protect the voltage input to the watthour meter. Size fuses as recommended by the meter manufacturer.
8. Socket: ANSI C12.7. Provide NEMA Type 3R, box-mounted socket having automatic circuit-closing bypass and having jaws compatible with requirements of the meter. Cover unused hub openings with blank hub plates. Paint box Munsell 7GY3.29/1.5 green to match the pad-mounted transformer to which the box-mounted socket is attached. The Munsell color notation is specified in ASTM D1535.
9. Current transformers: IEEE C57.13. Provide butyl-molded window type current transformers with 600-volt insulation, 10 kV BIL and mount on the low-voltage bushings. Route current transformer leads in a location as remote as possible from the power transformer secondary cables to permit current measurements to be taken with hook-on-ammeters. Provide three current transformers per power transformer with characteristics listed in the following table.
kVA Sec. Volt CT Ratio RF Meter Acc. Class
750 208Y/120 2000/5 1.5 0.3 thru B-1.8
Transformer
a. Less-flammable liquid-insulated or oil-insulated, two winding, 60 hertz, 65 degrees C rise above a 30 degrees C average ambient, self-cooled type.
b. Transformer shall be rated 750 kVA.
c. Transformer voltage ratings: 12470Grdy/7200V - 208Grdy/120V. For GrdY
- GrdY transformers, provide transformer with five-legged core design for third harmonic suppression.
d. Tap changer shall be externally operated, manual type for changing tap setting when the transformer is de-energized. Provide four 2.5 percent full capacity taps, two above and two below rated primary voltage. Tap changers shall clearly indicate which tap setting is in use.
e. Minimum tested percent impedance at 85 degrees C shall not be less than the following values:
2.50 for units rated 75kVA and below
2.87 for units rated 112.5kVA to 300kVA
4.03 for 500kVA rated units
5.32 for units rated 750kVA and above
f. Audible sound levels shall comply with the following:
kVA DECIBELS
(MAX
75 51
112.5 55
150 55
225 55
300 55
500 56
750 57
1000 58
1500 60
2000 61
2500 62
g. Transformer shall include lifting lugs and provisions for jacking under base. The transformer base construction shall be suitable for using rollers or skidding in any direction. Provide transformer top with an access handhole. Transformer shall have its kVA rating conspicuously displayed on its enclosure. The transformer shall have an insulated low-voltage neutral bushing with NEMA spade terminal, and with removable ground strap.
Specified Transformer Efficiencies
Provide transformer efficiency calculations utilizing the actual no-load and load loss values obtained during the routine tests performed on the actual transformer(s) prepared for this project. No-load losses (NLL) shall be referenced at 20 degrees C. Load losses (LL) shall be referenced at 55 degrees C and at 50 percent of the nameplate load. The transformer is not acceptable if the calculated transformer efficiency is less than the efficiency indicated in the "KVA / Efficiency" table below. That table is based on requirements contained within 10 CFR 431, Subpart K.
kVA EFFICIENCY (percent)
15 98.36
30 98.62
45 98.76
75 98.91
112.5 99.01
150 99.08
225 99.17
300 99.23
500 99.25
750 99.32
1000 99.36
1500 99.42
2000 99.46
2500 99.49 above 2500 99.50
Insulating Liquid
a. Less-flammable transformer liquids: NFPA 70 and FM APP GUIDE for less-flammable liquids having a fire point not less than 300 degrees C tested per ASTM D92 and a dielectric strength not less than 33 kV tested per ASTM D877. Provide identification of transformer as "non-PCB" and "manufacturer's name and type of fluid" on the nameplate.
The fluid shall be a biodegradable electrical insulating and cooling liquid classified by UL and approved by FM as "less flammable" fluids.
The fluid shall meet the following fluid properties:
1. Pour point: ASTM D97, less than -15 degree C
2. Aquatic biodegradation: EPA 712-C-98-075, 100 percent
3. Trout toxicity: OECD Test 203, zero mortality of EPA 821-R-02-012, pass
Liquid-Filled Transformer Nameplates
Distribution transformers shall be provided with nameplate information in accordance with IEEE C57.12.00 and as modified or supplemented by this section.
Corrosion Protection
Bases and cabinets of transformers shall be corrosion resistant and shall be fabricated of stainless steel conforming to ASTM A240/A240M, Type 304 or 304L. Base shall include any part of pad-mounted transformer that is within 3 inches of concrete pad.
Paint entire transformer assembly Munsell 7GY3.29/1.5 green. Paint coating system shall comply with IEEE C57.12.28 regardless of base, cabinet, and tank material. The Munsell color notation is specified in ASTM D1535.
WARNING SIGNS
Provide warning signs for the enclosures of pad-mounted transformers having a nominal rating exceeding 600 volts.
a. When the enclosure integrity of such equipment is specified to be in accordance with IEEE C57.12.28, such as for pad-mounted transformers, provide self-adhesive warning signs on the outside of the high voltage compartment door(s). Sign shall be a decal and shall have nominal dimensions of 7 by 10 inches with the legend "DANGER HIGH VOLTAGE" printed in two lines of nominal 2 inch high letters. The word "DANGER" shall be in white letters on a red background and the words "HIGH VOLTAGE" shall be in black letters on a white background. Decal shall be Panduit No. PPSO710D72 or approved equal.
b. When such equipment is guarded by a fence, mount signs on the fence.
Provide metal signs having nominal dimensions of 14 by 10 inches with the legend "DANGER HIGH VOLTAGE KEEP OUT" printed in three lines of nominal 3 inch high white letters on a red and black field.
Arc Flash Warning Label
Provide warning label for the enclosure of pad-mounted transformers.
Locate this self-adhesive warning label on the outside of the high voltage compartment door warning of potential electrical arc flash hazards and appropriate PPE required. The label format shall be as indicated.
GROUNDING AND BONDING
UL 467. Provide grounding and bonding as specified in Section
33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION.
PADLOCKS
Padlocks shall be provided for pad-mounted equipment and for each fence gate.
Padlocks shall be keyed as directed by the Contracting Officer. Padlocks shall comply with Section 08 71 00 DOOR HARDWARE.
CAST-IN-PLACE CONCRETE
Concrete associated with electrical work for other than encasement of underground ducts shall be 4000 psi minimum 28-day compressive strength unless specified otherwise. All concrete shall conform to the requirements of Section 03 30 00 CAST-IN-PLACE CONCRETE.
Shall be composed of fine aggregate, coarse aggregate, portland cement, and water so proportioned and mixed as to produce a plastic, workable mixture.
Fine aggregate shall be of hard, dense, durable, clean, and uncoated sand.
The coarse aggregate shall be reasonably well graded from 3/16 inch to 1 inch. The fine and coarse aggregates shall be free from injurious amounts of dirt, vegetable matter, soft fragments or other deleterious substances.
Water shall be fresh, clean, and free from salts, alkali, organic matter, and other impurities. Concrete associated with electrical work for other than encasement of underground ducts shall be 4000 psi minimum 28-day compressive strength unless specified otherwise. Slump shall not exceed 4 inches. Retempering of concrete will not be permitted. Exposed, unformed concrete surfaces shall be given a smooth, wood float finish. Concrete shall be cured for a period of not less than 7 days, and concrete made with high early strength portland cement shall be repaired by patching honeycombed or otherwise defective areas with cement mortar as directed by the Contracting Officer. Air entrain concrete exposed to weather using an air-entraining admixture conforming to ASTM C260/C260M. Air content shall be between 4 and 6 percent.
SOURCE QUALITY CONTROL
Transformer Test Schedule
The Government reserves the right to witness tests. Provide transformer test schedule for tests to be performed at the manufacturer's test facility. Submit required test schedule and location, and notify the Contracting Officer 30 calendar days before scheduled test date. Notify Contracting Officer 15 calendar days in advance of changes to scheduled date.
a. Test Instrument Calibration
1. The manufacturer shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy.
2. The accuracy shall be directly traceable to the National Institute of Standards and Technology.
3. Instrument calibration frequency schedule shall not exceed 12 months for both test floor instruments and leased specialty equipment.
4. Dated calibration labels shall be visible on all test equipment.
5. Calibrating standard shall be of higher accuracy than that of the instrument tested.
6. Keep up-to-date records that indicate dates and test results of instruments calibrated or tested. For instruments calibrated by the manufacturer on a routine basis, in lieu of third party calibration, include the following:
(a) Maintain up-to-date instrument calibration instructions and procedures for each test instrument.
(b) Identify the third party/laboratory calibrated instrument to verify that calibrating standard is met.
Design Tests
IEEE C57.12.00 states that "design tests are made only on representative apparatus to substantiate the ratings assigned to all other apparatus of basically the same design." Submit design test reports (complete with test data, explanations, formulas, and results), in the same submittal package as the catalog data and drawings for each of the specified transformer(s).
Design tests shall have been performed in accordance with IEEE C57.12.90 prior to the award of this contract.
a. Tests shall be certified and signed by a registered professional engineer.
b. Temperature rise: "Basically the same design" for the temperature rise test means a pad-mounted transformer with the same coil construction (such as wire wound primary and sheet wound secondary), the same kVA, the same cooling type (ONAN), the same temperature rise rating, and the same insulating liquid as the transformer specified.
c. Lightning impulse: "Basically the same design" for the lightning impulse dielectric test means a pad-mounted transformer with the same BIL, the same coil construction (such as wire wound primary and sheet wound secondary), and a tap changer, if specified. Design lightning impulse tests shall include the primary windings only of that transformer.
1. IEEE C57.12.90, paragraph 10.3 entitled "Lightning Impulse Test Procedures," and IEEE C57.98.
2. State test voltage levels.
3. Provide photographs of oscilloscope display waveforms or plots of digitized waveforms with test report.
d. Lifting and moving devices: "Basically the same…