Attachment_5-SpecSection01000.pdf

PDF 46 KB Posted

Attached to
Multiple Award Construction Contract, Shaw AFB, SC FY13 Federal contract opportunity
Solicitation number
FA4803-13-R-0005
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, Shaw AFB, SC FY13, newest first.
File Type Posted
Attch._51 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch._50 _B912_Revised_SOW_Oct_18_2013.pdf PDF
Attch._47 _PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE_UPDATE.pdf PDF
Attch _52 _MACC_Contracting_Questions_and_Answers.pdf PDF
Amendment_8.pdf PDF
Attch_48 _MACC_Technical_Questions_and_Answers.pdf PDF
Attch_49 _MACC_Contracting_Questions_and_Answers.pdf PDF
Attch_41 _B912_Revised_SOW_Sept_25_2013.pdf PDF
Attch_43 _AutoCAD_2.dwg DWG drawing
Attch_42 _AutoCAD_1.dwg DWG drawing
Attch_46 _912_FLOOR_PLAN.dwg DWG drawing
Amendment_7 _MACC.pdf PDF
Attch_45 _AutoCAD_4.dwg DWG drawing
Attch_44 _AutoCAD_3.dwg DWG drawing
Atch_40 _MACC_Site_Visit_2_10_September_2013_Sign-in.pdf PDF
Amendment_6.pdf PDF
Atch_38 _tech_Qs.pdf PDF
Atc_37 _B912_Revised_SOW_Sept_20_2013.pdf PDF
Atc_31_Floor_Plan_Title_Block_Template.dwt —
Atc_36_B912_Revised_SOW_Aug_29_2013.pdf PDF
Atc_28_Electrical2.pdf PDF
Atc_32_ShawDrawingCoverSheet.dwg DWG drawing
Atc_30_Electrical4.pdf PDF
Amendment_5.pdf PDF
Atc_29_Electrical3.pdf PDF
Atc_35_Contracting_Questions.pdf PDF
Atc_27_Electrical1.pdf PDF
Attch_25-MACC_Meeting_Minutes.pdf PDF
Attch_20-Chapel_Contours.pdf PDF
Attch_22-Chapel_Utility_with_all_area_markings.pdf PDF
Attch_17-Revised_SOW.pdf PDF
Attch_26-Shaw_AFB_ID2_Handbook.pdf PDF
Amendment_4 _FA4803-13-R-0005.pdf PDF
Attch_19-_Technical_Q A.pdf PDF
Attachment_16 _Questions_ _Answers_set__2.pdf PDF
MACC_amendment__3.pdf PDF
Attachment_15 _Base_Map_to_pre-bid_site.pdf PDF
Attachment_14_Blank_Cost_Estimate.xls XLS spreadsheet
Attch_13_MACC_Technical_Questions.pdf PDF
amendment_1 _MACC.pdf PDF
Attachment_8_WD_SC130043_Highway.pdf PDF
Attachment_2_MACC_Provisions_Feb_26_2013.pdf PDF
Attachment_3-_Shaw_AFB_Design_Standards.pdf PDF
Attachment_01_Executive_Summary.pdf PDF
Attachment_9_WD_SC130054_Heavy.pdf PDF
Attachment_4-SpecSection01800.pdf PDF
Attachement_10_Past_Performance_Questionaire.pdf PDF
Attachment_12_Security_Requirements.pdf PDF
Attachment_7_WD__SC130037_Bldg.pdf PDF
FA4803-13-R-0005_FY_13_MACC_Solicitation.pdf PDF
Show all 50

Multiple Award Construction Contract, Shaw AFB, SC FY13 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4803-13-R-0005

Attachment 5 Special Provisions

01000-1

SECTION 01000

SPECIAL PROVISIONS

26 Feb 13

Index

1. Principal Features

2. Scope

3. Field Measurements

4. Availability of Utilities

5. Continued Use of Facilities

6. Sequence of Work

7. Disposal of Materials

8. Contractor Submittals

9. Construction Permits

10. Layout of Project

11. Sampling and Testing

12. Identification of Employees

13. Contractor's Storage Area

14. Temporary Staging Area

15. Contractor's Haul Routes

16. Temporary Toilets

17. Construction Signage

18. Existing Conditions

19. Work Schedule

20. Daily Clean up

21. Contractor Damages

22. Utility Adjustments

23. Utility Outages

24. DD Form 1354, Real Estate Checklist

25. Notification Requirement

26. Refuse Collection

27. Mobile Phone

28. Storage Units

29. Site Maintenance

01000-2

1. PRINCIPAL FEATURES: The work covered by these specifications and accompanying drawings consists of furnishing all plant, labor, materials, tools, and equipment necessary in performing all operations in connection with Project VLSB XX – XXXX(Project number), (Insert project title here).

2. SCOPE: In general, the principal features of the work are outlined but not limited to this paragraph.

Unless otherwise indicated, it is not the intent of this listing to include technical data for materials or the installation of these materials. The project includes (insert the description of the project here).

3. FIELD MEASUREMENTS: The Contractor shall verify all measurements at the site and shall be responsible for dimensions and proper installation of all materials.

4. AVAILABILITY OF UTILITIES: All reasonable quantities of water, natural gas, and electricity will be made available to the contractor without charge. Connections to the utilities are the contractor’s responsibility and shall be coordinated with, and approved by, the appropriate Civil Engineering utility shop. The water fill stand located north of facility 7510 may be used for filling tank trucks. If connections are made to base fire hydrants, the contractor shall notify the base fire department and install a backflow prevention device as part of the connection.

5. CONTINUED USE OF FACILITIES: All Contractor operations must be closely coordinated with the using agency. Unless otherwise stated in the task order (TO), The Contractor shall not start work before 7:30 a.m. each morning. All utilities shall remain in operation during construction unless specifically noted otherwise.

6. SEQUENCE OF WORK: Work under this contract shall be sequenced and performed in accordance with the following requirements. (Contractor shall insert any relevant sequencing information in this section.)

7. DISPOSAL OF MATERIALS: Unless otherwise stated in the TO, all materials removed under this contract shall be disposed of off base in such a manner that meets federal, state and local environmental codes.

8. CONTRACTOR SUBMITTALS: Submittals are to be signed by the contractor and provided in accordance with the requirements of the Submittal Schedule. Submit in electronic format. All colors to be submitted at one time or will be disapproved and returned.

9. CONSTRUCTION PERMITS

9.1 Work Permits: The contractor will be responsible for coordinating a government supplied, Base Civil Engineer Work Clearance Request (AF Form 103) prior to performing digging of any type. The contractor shall process the digging permit by coordinating with and obtaining signatures from responsible representatives of the organizations listed on the AF Form 103 prior to obtaining final approval from the Air Force Base Civil Engineer or his approved representative. The area requested for clearance for each individual permit shall be limited to a maximum of two (2) weeks production for an individual permit. The Contractor will be given assistance, by the government, in the execution of the initial Work Clearance Request.

Thereafter, government assistance will be limited to an as-needed basis in the event of unusual circumstances. It will be the contractor's responsibility to coordinate the completion of the necessary AF Form 103 and arrange to have existing utilities located as indicated on the

01000-3 completed form, prior to the beginning of digging operations in the individual areas. This coordination is anticipated to take approximately three (3) working days to complete per request, and may require coordination with as many as twenty (20) individuals located on or near the base. A copy of the AF Form 103 is attached for reference. Any unusual delay in obtaining approval from any particular organization will be reported immediately to the contracting officer’s representative for assistance.

9.2 Utility Staking Requirements: The Contractor shall layout and mark his intended area(s) of excavation before calling for field coordination by utility personnel. This shall be done a minimum of five working days in advance of when digging is expected to begin. Once all responsible utility representatives have field located crossover and/or interference points between the proposed work and existing utilities, and signed off on the digging permit to signify completion of the field coordination of the digging permit, then digging in the area represented by the digging permit may begin. Any utility service markers or markings established by the utility representatives must be maintained by the contractor through the completion of the digging operations.

9.3 Digging Operations: Digging near established interference or crossover points shall be done by hand, three (3) feet either side of the point along the intended route, in order to prevent disturbing the existing utility. If the existing utility is uncovered in the new excavation, it shall be protected from damage and movement while in the open excavation and during backfill. The Contractor shall be responsible for the repairs and associated costs for repairs of any utility damaged by construction, whose location was made known to the contractor.

10. LAYOUT OF PROJECT: All surveying and layout work is the responsibility of the contractor. The government will assist the contractor only in providing elevations or location to begin the work.

11. SAMPLING AND TESTING: All quality control sampling and testing shall be the responsibility of the contractor. Sampling and testing shall be performed by an approved commercial testing laboratory. Copies of all test results shall be submitted to the contracting officer.

12. IDENTIFICATION OF EMPLOYEES

(a) Entry Authority List (EAL): These lists are kept at the gates to verify access to the base. The EAL Day Pass form is attached and shall be used for allowing entry to the base for delivery on the date and time indicated. The following guidelines apply:

(1) Submit a file electronically to both the Contracting Office and Civil Engineering

(2) Two (2) days are required for processing of EALs.

(b) The EAL Badge Info form, attached, will be used to verify employment and provide Badges for access to the base. This is for contractors that will be regularly going on and off base in support of the contract.

13 CONTRACTORS STORAGE AREA: The contractor will be authorized the use of an area adequate for his materials and equipment storage at the site shown on the Title Sheet of the drawings.

The contractor shall set up and maintain his operation within the area in an orderly manner and upon

01000-4 completion of the project, shall restore the premises to its original condition free of all excess materials, debris and excavations or embankments resulting from his operations. The contractor will also be responsible for his own equipment security.

14. TEMPORARY STAGING AREA: The contractor may be allowed to utilize certain locations within the project area as approved by the contracting officer to park equipment and store construction materials. Staging areas shall be maintained in a neat, orderly manner including erection of temporary fencing around the areas and restored after use.

15. CONTRACTOR'S HAUL ROUTES: Access to the project will be by the SAFB Commercial

Vehicle Gate during the week (Monday through Friday). The SAFB Commercial Vehicle Gate may open when prearranged during weekends (Saturday and Sunday) and Federal Holidays. The designated routes shall be used by both loaded and unloaded vehicles.

16. TEMPORARY TOILETS: Unless otherwise directed by the contract documents, the Contractor shall provide and maintain sanitary temporary toilets for all work accomplished under the project.

These toilets shall be located as directed by the contracting officer. The temporary toilets shall be portable, enclosed and weatherproofed and kept in a sanitary condition at all times. Toilets need to be secured in a manner that does not allow for overturn from wind.

17. CONSTRUCTION SIGNAGE: The contractor shall furnish, install and maintain traffic control signage for street and highway construction operations per the requirements of the Manual on Uniform Traffic Control Devices for Street and Highways. Prior to the contractor beginning construction, a detailed traffic control plan showing all construction signage shall be submitted to the contracting officer for review and comment.

18. EXISTING CONDITIONS: The plans represent the best available information at the time they were prepared. While every effort has been made to correctly show all major existing items which will affect the work, it is recommended that prospective bidders examine the site prior to submitting a bid. No additional payment will be made for extra work required by obstacles which were in place and clearly visible at the time of bidding.

19. WORK SCHEDULE: Working hours for the contractor will normally be between the hours of 7:30 a.m. and 4:30 p.m. excluding Saturdays, Sundays and federal holidays. If the contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor shall make a request to the Contracting Officer three work days in advance of their intention to work outside the standard work schedule to allow assignment of additional inspection personnel. The Contracting Officer shall determine, at his discretion, whether such inspection forces are available and whether work will be allowed on a non-scheduled day. The Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours and/or days; however, if inspectors are required to perform in excess of their normal duty work schedule solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.

20. DAILY CLEAN-UP: The contractor shall at all time keep the premises free from accumulations of waste materials or rubbish caused by his employees or work. At completion of each work day, he shall remove all rubbish from the construction site. All his tools, equipment, and surplus materials, 01000-5 etc., shall be stored in the storage area or temporary staging area.

21. CONTRACTOR DAMAGES: Areas not identified to be removed and/or worked under this contract that are disturbed or damaged during construction shall be removed and replaced at no additional cost to the Government.

23. UTILITY ADJUSTMENTS: The contractor shall adjust or shall arrange to have adjusted, utilities that are in conflict with new construction. The contractor shall be responsible for adjusting any water, gas, communication line, and electrical line. The contractor shall employ qualified personnel to perform these adjustments.

24. UTILITY OUTAGES: The Contractor shall perform the work under this contract with a minimum of outage time for all utilities. The contractor shall schedule any work that requires utility outages (electrical, water, gas, etc.) which will close down or limit normal activities in the building, construction area, or other affected areas at a time other than regular work periods of the organization occupying the facility including nights, weekends and holidays. The Contractor shall be responsible for coordination of all utility outages required to execute the contract. This will include execution of a government furnished utility outage coordination form, which must be reviewed and signed by representatives of all appropriate base organization prior to approval by the Contracting Officer’s representative. The Contractor will be provided a list of building managers and other appropriate points of contact, and will be given assistance by the government on an as needed basis. It shall be the Contractor’s responsibility to initiate and coordinate utility outages forms. Coordination of the outage form must be completed a minimum of fourteen (14) calendar days prior to the requested outage date, and may require coordination with as many as twenty (20) individuals located on or near base. Any unusual delays in obtaining clearance from any particular organization shall be reported immediately to the Contracting Officer or Contracting Officer’s representative for assistance. Submit an electronic copy of the completed utility outage form to Civil Engineering construction management. Following completion of the outage coordination, the contractor shall request shutdown from the utility company or Civil Engineer shop responsible for the service. The Contractor shall pay any fees associated with the required shutdown and shall comply with all instructions pertaining to the shutdown. Once work begins on an approved outage, work must continue without interruption until the contractor restores utility services to the affected lines and/or facilities.

25. DD FORM 1354, REAL ESTATE CHECKLIST: The contractor is required to fill out the DD

1354 entirely and must be submitted 2 weeks prior to final acceptance. Help with the DD form 1354 can be found in the Real Property office, 803-895-5132. The checklist must be completed and submitted to the Contracting Officer for approval. The final version of the DD 1354 will be due BEFORE closing. Once approved, the contractor will receive a receipt which must be included with his request for final inspection of the project. The final inspection WILL NOT be scheduled until the DD Form 1354 has been satisfactorily completed and submitted by the contractor and approved by the Government. All model and serial numbers for new installed equipment are to be added to the 1354 and can be on a separate attached sheet. Submit the 1354 electronically to the construction management office.

28. MOBILE PHONE: The Contractor shall provide an emergency site representative (superintendent or foreman), throughout the execution of the project, shall be accessible via a mobile phone. The number to the phone shall be provided to the Contracting Officer prior to the start of work.

01000-6

29. STORAGE UNITS: The contractor shall request the Contracting Officer’s approval for the siting, size and color of storage units, CONEX boxes, office/storage trailers and dumpsters. During Hurricane season, all CONEX’s are to be tied down when delivered. The Contractor shall not bring any such items to the job site without the Contracting Officer’s approval of all particulars noted above. A nameplate shall be visually displayed on the exterior of all storage units, with the following information: Contractor’s Company, name for Contractor’s Point(s) of Contact (POC) and telephone number(s) where he/she can be reached, (during and after normal working hours) and Contract number. During Hurricane season, all CONEX’s are to be tied down when delivered.

30. SITE MAINTENANCE: Contractor shall keep the construction site cleaned daily of all construction trash, trash generated by employees, debris, and/or demolished building materials. Grass and weed growth in excavated materials that are stockpiled on site shall be controlled and/or cut weekly. Weeds and grass within the construction site shall also be controlled and/or cut weekly. For the duration of each DO and on a daily basis, Contractor shall remove from all base roads and/or streets mud, soil, rocks, trash and debris that result from his/her construction operation on base. All roads and/or streets affected shall be cleaned before close of business on the particular day affected.

Contractor or Contractor’s employees, including subcontractors, shall not park any personally owned vehicles (POVs) or company and/or delivery vehicles on grassy areas near or in the construction site without prior approval from the CO, or his/her designated representative. When allowed, parking on grassy areas will only be for short-term delivery purposes (to include heavy tools, equipment, construction materials, etc.). Use designated hard surfaces or existing parking lots near or within the project site for parking of POVs or company and/or delivery vehicles. Permission to park on grassy areas does not relieve the contractor of the responsibility to restore affected areas to original condition. Tire and track impressions (ruts) created on wet or soft soil by vehicles and/or equipment used in the Contractor’s operation shall be repaired. Contractor shall restore the affected area(s) to its original condition within a timely manner. Final payment shall not be made until all repairs have been completed to satisfaction of the Contracting Officer. All areas of the site will be raked prior to seeding (or sodding) or for leveling of topsoil to rid the site of mounds, clods and/or ruts, the Contractor shall ensure that no clods larger than 1” are left on the site. Contractor shall restore the site to a condition and appearance similar or equal to existing before the damages occurred. Such restoration work will not be considered complete until approved by the CO or his/her designated representative. The Government will not accept sites that have not been raked and restored to this standard. At any given construction site, the Contractor shall grade, rake, and seed (or sod), or prepare for seeding (or sodding), the job site as soon as possible following work at that particular site.

Grass areas disturbed by construction and/or those areas required to be “re-seeded” shall be re-established by hydroseeding only, unless otherwise specified.

File details come from the government source that posted it. Updated .