Bldg_898_Q A_2.docx
DOCX document 16 KB Posted
- Attached to
- Paintbooth Federal contract opportunity
- Solicitation number
- FA4801-15-R-0029
About this file
FINAL Q A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment.pdf | ||
| Bldg_898_Q A_1.docx | DOCX document | |
| Bldg_898_Q A.docx | DOCX document | |
| Corrosion_Control_UFC_4_211_02.pdf | ||
| FA4801-15-R-0029-0002.pdf | ||
| FA4801-15-R-0029 _Bldg_898_Paintbooth_Retrofit.pdf | ||
| FA4801-15-R-0029 _Bldg_898_Paint_Booth_Amendment.pdf | ||
| ATCH_3-_NCIC_Base_Access.pdf | ||
| ATCH_2-_CCFRG_Version_10_17DEC2012.pdf | ||
| FA4801-15-R-0029 _Bldg_898_Paintbooth_Retrofit.doc | DOC document | |
| ATCH_1-_SOO _Bldg_898_Paintbooth_Retrofit.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4801-15-R-0029 Q&A’s 898 Paintbooth Retrofit Question: We see that there are exhaust fans and recirculation fans, however we do not see a reference to an intake fan/motor. Are we to assume that we are to provide an intake fan? If so please advise on the size.
Answer: There is an intake fan and the contractor is NOT required to replace or provide. The Intake fan’s motor Is 40hp
Further discussion has revealed that the NESHAP filters are requred based on the configuration of the airflow system. These booths have recirculating air as a result for the saftery of the personnel in the booth NESHAP filters ARE required.